Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Work experience and job location
Round 3 - Technical 

(1 Question)

  • Q1. Question releted electrical

Interview Preparation Tips

Interview preparation tips for other job seekers - I advice all members please face interview with fress mined

I applied via Company Website and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Execution details, Site planning, Client & Subcontractor billing, Subcontractor & Client Reconciliation, MS Office knowledge.
Round 3 - HR 

(2 Questions)

  • Q1. Current Annual CTC & Expected CTC
  • Ans. 

    I am currently earning X and expecting Y for the Assistant Electrical Engineer position.

    • My current annual CTC is X.

    • For the Assistant Electrical Engineer position, I am expecting a CTC of Y.

    • I am open to negotiation based on the company's policies and the job responsibilities.

    • I am looking for a fair compensation package that aligns with my skills and experience.

  • Answered by AI
  • Q2. After negotiation they hike 10-15%

Interview Preparation Tips

Interview preparation tips for other job seekers - Suggesion to all job seekers, Plz don't present any false statement. Other wise if organization found any false statement (major) they fired directly without advance notice.

Assistant Electrical Engineer Interview Questions Asked at Other Companies

Q1. How will you plan and execute a 1 KM 11KV Transmission Line?
Q2. Program in ladder for Mitsubishi, how to communicate between mult ... read more
Q3. What you know about IMCC panels, what is the main switchgear requ ... read more
Q4. Describe the installation process for a 100 KVA DTR.
Q5. Does a Megger generate AC or DC, and what is the reason for its o ... read more

I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Describe the installation process for a 100 KVA DTR.
  • Ans. 

    The installation process for a 100 KVA DTR involves site preparation, foundation construction, equipment placement, wiring, and testing.

    • Prepare the site by clearing the area and ensuring proper drainage

    • Construct a foundation that is level and able to support the weight of the DTR

    • Place the DTR on the foundation and secure it in place

    • Connect the wiring according to the manufacturer's instructions

    • Test the DTR to ensure it

  • Answered by AI
  • Q2. Describe the earthing procedure for a distributor transformer.
  • Ans. 

    Earthing procedure for a distributor transformer involves connecting the transformer to a grounding system.

    • The transformer should be connected to a grounding system using a grounding electrode.

    • The grounding electrode should be buried in the earth at a depth of at least 2.5 meters.

    • The grounding electrode should be made of copper or galvanized iron.

    • The grounding system should have a resistance of less than 1 ohm.

    • The eart...

  • Answered by AI
  • Q3. How will you plan and execute a 1 KM 11KV Transmission Line?
  • Ans. 

    Planning and executing a 1 KM 11KV transmission line requires careful consideration of various factors.

    • Conduct a site survey to determine the route and identify any obstacles

    • Design the transmission line based on the load requirements and voltage drop calculations

    • Obtain necessary permits and approvals from local authorities

    • Procure materials and equipment required for construction

    • Ensure safety measures are in place durin...

  • Answered by AI
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Why should we hire you?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Electrical Engineer interview:
  • Distribution Network
  • Aerial Bunched Cable
  • Distribution Transformers
  • Earthing Calculation
Interview preparation tips for other job seekers - Need to have sound technical knowledge and interviews are tough.

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. My previous job details
  • Ans. Im working in one supply companies this is not ccomfortable for me
  • Answered by Mukesh O m
Round 3 - Group Discussion 

GD is very important for all companys, reason for this not single man work this is team work so GD is very important

Round 4 - Safety 
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 4 interview rounds.

Round 1 - Assignment 

Computer test like auto cad, basic engineering etc.

Round 2 - Technical 

(2 Questions)

  • Q1. About theoritical knowledge
  • Q2. About practical experience
Round 3 - HR 

(1 Question)

  • Q1. About roll and fitment
Round 4 - Medical Test 

(1 Question)

  • Q1. General medical check up

I applied via Campus Placement and was interviewed before Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Symsons 1/3 rd rule , BMD, SFD,basic questions related to rcc

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basics related to rcc, how to calculate earthwork quantities, tests related to concrete and basic idea of SFD and BMD. Only basic questions are asked.

I applied via Walk-in and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What about for you.
  • Q2. My name Neeraj Singh from District Farrukhabad UP East.

Interview Preparation Tips

Interview preparation tips for other job seekers - Sunday

Interview Questionnaire 

1 Question

  • Q1. Basic question of transformer, electrical machine, transmission

I applied via Naukri.com and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Give an example of when you showed leadership qualities.

Interview Preparation Tips

Interview preparation tips for other job seekers - End the interview with a good impression. Be prepared

I applied via Campus Placement and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Basic and modrate electrical question
  • Q2. Transmission line specifications, machine question, bacis one

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Electrical Engineer interview:
  • Electrical Power System
  • Electrical Machines
Interview preparation tips for other job seekers - If your bacis is strong you will crack it, machine and power system is focus.

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Assistant Electrical Engineer interview?
Nagarjuna Construction Company interview process usually has 2-3 rounds. The most common rounds in the Nagarjuna Construction Company interview process are HR, Technical and Resume Shortlist.
What are the top questions asked in Nagarjuna Construction Company Assistant Electrical Engineer interview?

Some of the top questions asked at the Nagarjuna Construction Company Assistant Electrical Engineer interview -

  1. How will you plan and execute a 1 KM 11KV Transmission Li...read more
  2. Describe the installation process for a 100 KVA D...read more
  3. Describe the earthing procedure for a distributor transform...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 753 Interviews
Tata Projects Interview Questions
4.2
 • 446 Interviews
KEC International Interview Questions
4.0
 • 308 Interviews
Dilip Buildcon Interview Questions
4.0
 • 145 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all
Nagarjuna Construction Company Assistant Electrical Engineer Salary
based on 103 salaries
₹3.6 L/yr - ₹7.5 L/yr
30% more than the average Assistant Electrical Engineer Salary in India
View more details

Nagarjuna Construction Company Assistant Electrical Engineer Reviews and Ratings

based on 37 reviews

3.7/5

Rating in categories

3.4

Skill development

3.3

Work-life balance

3.5

Salary

3.5

Job security

3.4

Company culture

2.9

Promotions

3.3

Work satisfaction

Explore 37 Reviews and Ratings
Junior Engineer
910 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
643 salaries
unlock blur

₹2.4 L/yr - ₹8.9 L/yr

Senior Engineer
399 salaries
unlock blur

₹4.3 L/yr - ₹11 L/yr

Junior Engineer Civil
367 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Assistant Engineer - Civil
286 salaries
unlock blur

₹3.3 L/yr - ₹8.9 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview