Filter interviews by
I applied via Company Website and was interviewed before Oct 2021. There were 3 interview rounds.
I am currently earning X and expecting Y for the Assistant Electrical Engineer position.
My current annual CTC is X.
For the Assistant Electrical Engineer position, I am expecting a CTC of Y.
I am open to negotiation based on the company's policies and the job responsibilities.
I am looking for a fair compensation package that aligns with my skills and experience.
I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.
The installation process for a 100 KVA DTR involves site preparation, foundation construction, equipment placement, wiring, and testing.
Prepare the site by clearing the area and ensuring proper drainage
Construct a foundation that is level and able to support the weight of the DTR
Place the DTR on the foundation and secure it in place
Connect the wiring according to the manufacturer's instructions
Test the DTR to ensure it
Earthing procedure for a distributor transformer involves connecting the transformer to a grounding system.
The transformer should be connected to a grounding system using a grounding electrode.
The grounding electrode should be buried in the earth at a depth of at least 2.5 meters.
The grounding electrode should be made of copper or galvanized iron.
The grounding system should have a resistance of less than 1 ohm.
The eart...
Planning and executing a 1 KM 11KV transmission line requires careful consideration of various factors.
Conduct a site survey to determine the route and identify any obstacles
Design the transmission line based on the load requirements and voltage drop calculations
Obtain necessary permits and approvals from local authorities
Procure materials and equipment required for construction
Ensure safety measures are in place durin...
What people are saying about Nagarjuna Construction Company
posted on 28 Mar 2022
GD is very important for all companys, reason for this not single man work this is team work so GD is very important
posted on 3 May 2024
I applied via Walk-in and was interviewed in Nov 2023. There were 4 interview rounds.
Computer test like auto cad, basic engineering etc.
posted on 6 Aug 2020
I applied via Campus Placement and was interviewed before Aug 2019. There was 1 interview round.
I applied via Walk-in and was interviewed in Jul 2019. There was 1 interview round.
Company expenses for engineers include salaries, benefits, training, equipment, and travel costs.
Salaries are a major expense for engineers, varying based on experience and specialization.
Benefits such as healthcare, retirement plans, and bonuses add to the overall expense.
Training programs to keep engineers updated with the latest technologies can be costly.
Equipment and tools needed for engineering work can be a sign...
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
I applied via Job Fair and was interviewed in May 2018. There were 3 interview rounds.
posted on 21 Dec 2021
I applied via Campus Placement and was interviewed before Dec 2020. There was 1 interview round.
The question covers power factor of transformer, types of DC machine, working principle of AC alternator, and DC motors.
Power factor of a transformer is the ratio of real power to apparent power.
Types of DC machines include DC motors and DC generators.
AC alternators work on the principle of electromagnetic induction to convert mechanical energy into electrical energy.
DC motors convert electrical energy into mechanical ...
Some of the top questions asked at the Nagarjuna Construction Company Assistant Electrical Engineer interview -
based on 37 reviews
Rating in categories
Junior Engineer
908
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
638
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Senior Engineer
396
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Junior Engineer Civil
367
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Assistant Engineer - Civil
292
salaries
| ₹3.3 L/yr - ₹8.9 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Kalpataru Projects International