The major parts in a power transformer include the core, windings, insulation, cooling system, and tap changer.
Core: Provides a path for magnetic flux and is usually made of laminated steel sheets.
Windings: Consist of primary and secondary coils that transfer electrical energy.
Insulation: Prevents electrical leakage and ensures safety.
Cooling System: Keeps the transformer within operating temperature limits, commonly u...
I want to switch electrical circuits and devices.
Switching electrical circuits to control the flow of electricity.
Switching electrical devices on or off.
Switching between different power sources.
Switching between different modes or settings of electrical equipment.
Switching between different electrical connections or configurations.
I applied via Campus Placement and was interviewed before Aug 2019. There was 1 interview round.
Power Mech Projects interview questions for designations
Top trending discussions
posted on 18 Oct 2021
I appeared for an interview before Oct 2020.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There was 1 interview round.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
based on 3 interviews
Interview experience
based on 51 reviews
Rating in categories
Senior Engineer
405
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Engineer
329
salaries
| ₹2 L/yr - ₹8.8 L/yr |
Assistant Manager
284
salaries
| ₹4.1 L/yr - ₹11.6 L/yr |
Electrical Engineer
212
salaries
| ₹1.7 L/yr - ₹7 L/yr |
Mechanical Engineer
211
salaries
| ₹1.6 L/yr - ₹7 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures