Upload Button Icon Add office photos

Filter interviews by

Power Mech Projects Assistant Manager Interview Questions and Answers

Updated 1 Apr 2023

Power Mech Projects Assistant Manager Interview Experiences

2 interviews found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Good technology skill and preparation
  • Q2. Tell me about your self
  • Q3. Tell me about your family

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and good with skills proper dress and be prepared and descent in ur
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Salary slip and bank statement
  • Q2. Before salary and after salary slip
  • Q3. Experience letter and education certificate
  • Q4. Salary discussion with you
Round 3 - Technical 

(3 Questions)

  • Q1. Welding related questions
  • Q2. Ndt related questions RT UT PWHT
  • Q3. P91 Questions about the

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience for me Power mech projects ltd company

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in Jio
Q2. What are the different layers of OSI model?
asked in JSW Steel
Q3. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Procedure for Power Transformer installation
  • Ans. 

    Power transformer installation involves several steps to ensure proper functioning and safety.

    • Selecting a suitable location for the transformer based on factors like accessibility, ventilation, and safety regulations

    • Preparing the foundation for the transformer to ensure stability and proper weight distribution

    • Transporting the transformer to the installation site using appropriate equipment and following safety protocol...

  • Answered by AI
  • Q2. Testings performed in Transformer
  • Ans. 

    Various tests are performed on transformers to ensure their proper functioning and safety.

    • Insulation resistance test to check for any insulation breakdown

    • Turns ratio test to verify the turns ratio of primary and secondary windings

    • Polarity test to ensure correct polarity of windings

    • Winding resistance test to measure the resistance of windings

    • Dielectric strength test to check the insulation strength under high voltage

    • Sho...

  • Answered by AI
  • Q3. Transmission line installation
  • Q4. Quality procedures
  • Q5. NC procedures rectification

Interview Preparation Tips

Interview preparation tips for other job seekers - The political dynamics at the site are unfavorable.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Indian Institute of Technology (IIT), Roorkee and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

General English language and grammar, synonyms

Round 2 - Group Discussion 

I was asked about research advancement of my institute

Round 3 - One-on-one 

(2 Questions)

  • Q1. Tell us about yourself
  • Ans. 

    Experienced professional with a background in retail management and a proven track record of driving sales and improving team performance.

    • Over 5 years of experience in retail management

    • Strong leadership skills with a focus on team development

    • Proven track record of exceeding sales targets

    • Excellent communication and problem-solving abilities

  • Answered by AI
  • Q2. Technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Make your conversation skills very strong
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Major difference between Hrg and Lrg?
  • Ans. 

    HRG stands for Human Resource Group while LRG stands for Large Retail Group.

    • HRG focuses on managing human resources within an organization

    • LRG focuses on managing a large retail business

    • HRG deals with employee relations, recruitment, training, and development

    • LRG deals with sales, inventory management, customer service, and marketing

  • Answered by AI
  • Q2. How to perform transformer sizing
  • Ans. 

    Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.

    • Determine the total load requirements in kVA

    • Consider the load factor and diversity factor

    • Calculate the transformer size based on the total load requirements

    • Ensure the transformer is rated for the appropriate voltage and frequency

    • Consult with a professional engineer if needed

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your expectations about company
  • Ans. 

    I expect the company to provide opportunities for growth, a positive work environment, and clear communication.

    • Opportunities for career advancement

    • Positive work culture

    • Clear communication channels

  • Answered by AI
  • Q2. What is your previous salary
  • Ans. 

    I prefer not to disclose my previous salary as I believe my value is based on my skills and experience.

    • It is not appropriate to discuss previous salary in an interview

    • Focus on discussing the value you can bring to the company

    • Emphasize your skills, experience, and qualifications instead of past salary

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice and good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always let them know your full career with learn
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is Turbine stress control?
  • Ans. 

    Turbine stress control is the monitoring and management of mechanical stress levels in turbine components to prevent damage and ensure optimal performance.

    • Turbine stress control involves monitoring stress levels in turbine components such as blades, rotors, and casings.

    • The goal is to prevent excessive stress that can lead to fatigue, cracking, or failure of the turbine.

    • Methods for turbine stress control include regular...

  • Answered by AI
  • Q2. 3 element control system,coal calculation, Turbine & Generator interlocks and protection,FSSS Logic
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Group Discussion 

How to save inventry cost

Interview Preparation Tips

Interview preparation tips for other job seekers - As a manager you should find out inventory cost timly material arrave and other
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About waterproofing procedure, observation raised and closed by application
  • Q2. Mivan formwork,MEP ,Qaulity assurance

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Assistant Manager interview:
  • All the finishing and rcc topice

Power Mech Projects Interview FAQs

How many rounds are there in Power Mech Projects Assistant Manager interview?
Power Mech Projects interview process usually has 2-3 rounds. The most common rounds in the Power Mech Projects interview process are Resume Shortlist, Technical and HR.
How to prepare for Power Mech Projects Assistant Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Power Mech Projects. The most common topics and skills that interviewers at Power Mech Projects expect are Data Interpretation, MS Office, Payroll Management and Payroll Processing.
What are the top questions asked in Power Mech Projects Assistant Manager interview?

Some of the top questions asked at the Power Mech Projects Assistant Manager interview -

  1. Experience letter and education certific...read more
  2. Ndt related questions RT UT P...read more
  3. Welding related questi...read more

Tell us how to improve this page.

Power Mech Projects Assistant Manager Salary
based on 277 salaries
₹4.1 L/yr - ₹10.5 L/yr
17% less than the average Assistant Manager Salary in India
View more details

Power Mech Projects Assistant Manager Reviews and Ratings

based on 55 reviews

3.8/5

Rating in categories

3.4

Skill development

3.4

Work-Life balance

3.4

Salary & Benefits

3.9

Job Security

3.4

Company culture

3.3

Promotions/Appraisal

3.6

Work Satisfaction

Explore 55 Reviews and Ratings
Senior Engineer
533 salaries
unlock blur

₹3 L/yr - ₹8.1 L/yr

Assistant Manager
373 salaries
unlock blur

₹4 L/yr - ₹10.5 L/yr

Engineer
254 salaries
unlock blur

₹2 L/yr - ₹6.4 L/yr

Mechanical Engineer
240 salaries
unlock blur

₹1.9 L/yr - ₹7.5 L/yr

Electrical Engineer
218 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Explore more salaries
Compare Power Mech Projects with

Thermax Limited

4.2
Compare

BGR Energy Systems

3.7
Compare

Larsen & Toubro Limited

4.0
Compare

Kalpataru Projects International

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview