Upload Button Icon Add office photos

Filter interviews by

GVK Group Assistant Manager Interview Questions and Answers

Updated 28 Apr 2024

GVK Group Assistant Manager Interview Experiences

1 interview found

Assistant Manager Interview Questions & Answers

user image Saurabh Singh

posted on 28 Apr 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is Turbine stress control?
  • Ans. 

    Turbine stress control is the monitoring and management of mechanical stress levels in turbine components to prevent damage and ensure optimal performance.

    • Turbine stress control involves monitoring stress levels in turbine components such as blades, rotors, and casings.

    • The goal is to prevent excessive stress that can lead to fatigue, cracking, or failure of the turbine.

    • Methods for turbine stress control include regular...

  • Answered by AI
  • Q2. 3 element control system,coal calculation, Turbine & Generator interlocks and protection,FSSS Logic

Interview questions from similar companies

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous Project experience. Execution plan, Job responsibility, Technical for Electrical SLD, Chiller SLD, Functional test for all MEP items.

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to give correct answer, What you have mentioned in your CV the same question will be raise from Technical Board...

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your experience and ur self like education etc
  • Q2. What do you work in your profile.
  • Q3. Can you handle RVNL project
  • Ans. 

    Yes, I have experience in handling RVNL projects.

    • I have previously managed a similar railway project

    • I am familiar with the processes and regulations involved

    • I have a strong team to support me

    • I am confident in my ability to deliver the project on time and within budget

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basics of fabrication and Erection methods
  • Q2. Regarding Safety
  • Q3. Resources management
  • Q4. Project planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Cool and prepared for all technical

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

Interview Questionnaire 

1 Question

  • Q1. Preparation basic of pipeline and job procedures.

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on your previous jobs

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview

GVK Group Interview FAQs

How many rounds are there in GVK Group Assistant Manager interview?
GVK Group interview process usually has 1 rounds. The most common rounds in the GVK Group interview process are Technical.
What are the top questions asked in GVK Group Assistant Manager interview?

Some of the top questions asked at the GVK Group Assistant Manager interview -

  1. What is Turbine stress contr...read more
  2. 3 element control system,coal calculation, Turbine & Generator interlocks and p...read more

Tell us how to improve this page.

GVK Group Assistant Manager Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more
GVK Group Assistant Manager Salary
based on 35 salaries
₹5.9 L/yr - ₹10.4 L/yr
7% less than the average Assistant Manager Salary in India
View more details

GVK Group Assistant Manager Reviews and Ratings

based on 15 reviews

4.0/5

Rating in categories

3.5

Skill development

4.1

Work-life balance

3.6

Salary

3.6

Job security

3.6

Company culture

3.0

Promotions

3.6

Work satisfaction

Explore 15 Reviews and Ratings
Assistant Manager
35 salaries
unlock blur

₹5.9 L/yr - ₹10.4 L/yr

Senior Engineer
20 salaries
unlock blur

₹5 L/yr - ₹7.1 L/yr

Engineer
9 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Assistant Manager- HR
7 salaries
unlock blur

₹6 L/yr - ₹8.9 L/yr

Operations Engineer
7 salaries
unlock blur

₹3.5 L/yr - ₹5 L/yr

Explore more salaries
Compare GVK Group with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview