Upload Button Icon Add office photos

Filter interviews by

GVK Group Deputy Manager Interview Questions and Answers

Updated 6 Apr 2024

GVK Group Deputy Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Maintenance protocols, Safety Tools and safety protocols, Electrical troubleshootings and fault analysis, basic electrical engineering questioneries, panel and motors protection questions, generator and av...
  • Q2. Basic electrical engineering
  • Q3. Power system interlocks and protection codes
  • Q4. Troubleshootings and fault analysis

Interview Preparation Tips

Topics to prepare for GVK Group Deputy Manager interview:
  • Protection system
  • Power system
  • Communication skills
  • Electricals
Interview preparation tips for other job seekers - Keep prepared & confident.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. BBS preparation
  • Q2. Drawings related

Interview Preparation Tips

Interview preparation tips for other job seekers - They should work on KSA ( knowledge, skill, attitude) to get dream job.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Steel density, steel lap zone in column & beam, steel weight formula
  • Q2. Mivan shuttering, full plywood weight, table formwork
  • Q3. Excavation slope, aggregate density, cement density, mix design, compressive strength of cement & concrete, slump test,free flow concrete
Round 2 - BOQ 

(2 Questions)

  • Q1. Item wise rate analysis
  • Q2. How to manage lose Making item
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Motor replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old motor remove and new motor replace and bolts nut tightening s...
  • Q2. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and blumber block top cover open and old slue Barring remove and new slue...
  • Q3. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tig...
  • Q4. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old v -scraper remove and new v-scraper replace and bolts nut...
  • Q5. Barring greasing work and safety first and all ppes sure and paper work and walked away clean and fresh and Greasing gun and all pulley checking and savings Greasing work and sure and paper work cancelled
  • Q6. Discharge Chute replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old discharge chute remove and new discharge chute repl...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Related to Railway construction and maintenance related questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Reason of job change
  • Q2. Why I hire you
Round 2 - Technical 

(2 Questions)

  • Q1. Describe the work profile
  • Q2. Reconciliation process of Raw material
  • Ans. 

    Reconciliation process of raw material involves comparing the physical inventory with the recorded inventory to identify discrepancies.

    • Verify the accuracy of raw material receipts and usage records

    • Compare physical inventory counts with the recorded inventory levels

    • Investigate and resolve any discrepancies found

    • Update inventory records accordingly

    • Implement controls to prevent future discrepancies

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Group Discussion - Operation & Maintenance

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. How can we receive Materials to store and what is the basic procedure
  • Ans. 

    Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.

    • Materials can be received through purchase orders placed with suppliers.

    • Deliveries can be made directly to the storage location or to a designated receiving area.

    • Materials can also be received through transfers from other departments or locations.

    • The bas...

  • Answered by AI
  • Q2. Procedure of client material receipt/BOQ Items
  • Ans. 

    Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.

    • Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.

    • Document all received items in a log or system for tracking purposes.

    • Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.

    • Report any issues or discrepancies to the relevant stakeholders for resolution...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Discussion about my working and experience on site

Round 2 - HR 

(2 Questions)

  • Q1. How many structure in your last project?
  • Ans. 

    There were three main structures in my last project: a database structure, a software architecture structure, and a project management structure.

    • Database structure included tables, relationships, and indexes.

    • Software architecture structure involved layers, components, and modules.

    • Project management structure consisted of timelines, tasks, and resources.

  • Answered by AI
  • Q2. How many type foundation casting in your last project ?
  • Ans. 

    There were a total of 10 type foundation castings in my last project.

    • There were different types of foundation castings used in the project such as pile foundation, strip foundation, and raft foundation.

    • Each type of foundation casting was used based on the specific requirements of the structure and soil conditions.

    • The number of each type of foundation casting was determined by the structural design and engineering calcu

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About job profile on the present
  • Q2. About job profile the overall
Round 3 - One-on-one 

(1 Question)

  • Q1. What is the roles and responsibilities
Round 4 - HR 

(5 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your strengths and weaknesses?
  • Q3. Share details of your previous job.
  • Q4. Tell me about yourself.
  • Q5. What are the challenges faced

Interview Preparation Tips

Interview preparation tips for other job seekers - Final discussion on being selected

GVK Group Interview FAQs

How many rounds are there in GVK Group Deputy Manager interview?
GVK Group interview process usually has 1 rounds. The most common rounds in the GVK Group interview process are Technical.
What are the top questions asked in GVK Group Deputy Manager interview?

Some of the top questions asked at the GVK Group Deputy Manager interview -

  1. Maintenance protocols, Safety Tools and safety protocols, Electrical troublesho...read more
  2. Power system interlocks and protection co...read more
  3. Troubleshootings and fault analy...read more

Tell us how to improve this page.

GVK Group Deputy Manager Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more
GVK Group Deputy Manager Salary
based on 4 salaries
₹9 L/yr - ₹10.5 L/yr
7% more than the average Deputy Manager Salary in India
View more details

GVK Group Deputy Manager Reviews and Ratings

based on 3 reviews

4.7/5

Rating in categories

2.8

Skill development

4.8

Work-life balance

4.5

Salary

3.7

Job security

4.4

Company culture

4.4

Promotions

3.6

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
35 salaries
unlock blur

₹5.9 L/yr - ₹10.4 L/yr

Senior Engineer
20 salaries
unlock blur

₹5 L/yr - ₹7.1 L/yr

Engineer
9 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Operations Engineer
7 salaries
unlock blur

₹3.5 L/yr - ₹5 L/yr

Assistant Manager- HR
7 salaries
unlock blur

₹6 L/yr - ₹8.9 L/yr

Explore more salaries
Compare GVK Group with

Adani Group

3.9
Compare

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Essar Group

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview