Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.
Materials can be received through purchase orders placed with suppliers.
Deliveries can be made directly to the storage location or to a designated receiving area.
Materials can also be received through transfers from other departments or locations.
The bas...
Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.
Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.
Document all received items in a log or system for tracking purposes.
Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.
Report any issues or discrepancies to the relevant stakeholders for resolution...
I applied via Naukri.com and was interviewed in Oct 2019. There was 1 interview round.
I applied via Referral and was interviewed before May 2020. There were 4 interview rounds.
Accruals are expenses incurred but not yet paid or recorded in the books.
Accrued salaries and wages
Accrued interest
Accrued taxes
Accrued rent
Accrued utilities
Accrued warranty expenses
I applied via Monster and was interviewed in Aug 2020. There were 4 interview rounds.
I have handled multiple transformation projects in my previous roles.
Led a team to implement a new CRM system resulting in a 30% increase in sales
Managed the transition to a paperless office resulting in a 50% reduction in printing costs
Implemented a new project management tool resulting in a 20% increase in project completion rate
Streamlined the hiring process by implementing an applicant tracking system resulting in
Project stabilization methodology refers to the process of ensuring that a project is completed successfully and is sustainable in the long run.
It involves identifying and addressing any issues or risks that may arise during the project lifecycle.
It includes implementing measures to ensure that the project meets its objectives and delivers the expected benefits.
Examples of project stabilization methodologies include ri...
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
Power plant cycle is a series of processes that convert fuel into electricity.
Fuel is burned to produce heat
Heat is used to boil water and create steam
Steam turns a turbine which generates electricity
Excess heat is released into the environment
Water is cooled and recycled in the system
Casting methods are processes used to create metal objects by pouring molten metal into a mold.
Sand casting: uses sand molds to create the shape of the object
Investment casting: uses wax patterns that are melted away to create the mold
Die casting: uses metal molds to create complex shapes with high accuracy
Permanent mold casting: uses reusable molds made of metal
Centrifugal casting: rotates the mold to distribute the m
Batch production is a manufacturing process where products are made in groups or batches, rather than individually.
Products are produced in specified quantities at a time
Each batch goes through the whole production process together
Common in industries like food processing, pharmaceuticals, and automotive manufacturing
Supercritical stage of steam refers to a state where it exhibits properties of both liquid and gas.
Occurs at temperatures and pressures above the critical point
Density and viscosity are similar to liquids, while diffusivity and compressibility are similar to gases
No distinct boundary between liquid and gas phases
Used in power plants for more efficient energy generation
I applied via Newspaper Ad and was interviewed before Nov 2021. There were 3 interview rounds.
Domain Topic Objective Type Analytical 2 Hours duration
I applied via Newspaper Ad and was interviewed in Mar 2022. There were 2 interview rounds.
Technical experience and suitability to the post and check mentally prepared to work across the nation.
I was interviewed in Sep 2020.
I applied via Naukri.com and was interviewed in Feb 2022. There were 2 interview rounds.
Some of the top questions asked at the Nagarjuna Construction Company Deputy Manager interview -
based on 7 interviews
Interview experience
based on 35 reviews
Rating in categories
Junior Engineer
901
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
626
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer Civil
490
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
296
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
290
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys