Premium Employer

i

This company page is being actively managed by ManpowerGroup Team. If you also belong to the team, you can get access from here

ManpowerGroup Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

ManpowerGroup Civil Engineer Interview Questions and Answers

Updated 30 Jul 2022

ManpowerGroup Civil Engineer Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed before Jul 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Whit is the process of water treatment plant and is functional details.

Interview Preparation Tips

Topics to prepare for ManpowerGroup Civil Engineer interview:
  • Civil Engineering
  • Water Supply
  • preparation
  • Sincerely
Interview preparation tips for other job seekers - Always remember that they saw something in you worthy to interview, take the confidence that they chose you out of all the other applicants as a start. You should read your resume by yourself or share the details of your past experience with yourself or give interview calmly and confidently. Without hazration give your best. I am sure my advice is helpful for us.

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Basic details like as previous employment, academic
  • Q2. Discussion about salary
Round 3 - Technical 

(2 Questions)

  • Q1. How to make box segment
  • Ans. 

    A box segment can be made by cutting a box into two parts along one of its faces.

    • Choose a face of the box to cut along

    • Use a saw or knife to cut through the box along the chosen face

    • Sand the edges of the cut to smooth them out if necessary

  • Answered by AI
  • Q2. Different Question about major bridge

Interview Preparation Tips

Interview preparation tips for other job seekers - Enhance your current experience,focus on what are you doing,dont get out of your way

I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Core java features and describes oops concept.
  • Ans. 

    Core Java is a programming language that supports OOPs concepts such as inheritance, encapsulation, abstraction, and polymorphism.

    • Core Java is an object-oriented programming language.

    • It supports encapsulation, which means hiding the implementation details of an object from the outside world.

    • Inheritance allows a class to inherit properties and methods from another class.

    • Abstraction is the process of hiding complex imple...

  • Answered by AI
  • Q2. Introduce yourself and about tech that you have used.
Round 3 - Technical 

(3 Questions)

  • Q1. Describe project and your role and responsibility.
  • Q2. What is docker and kubernetes
  • Ans. 

    Docker is a containerization platform that allows developers to package and run applications in isolated environments. Kubernetes is an open-source container orchestration system that automates deployment, scaling, and management of containerized applications.

    • Docker allows developers to create and run applications in containers, which are lightweight and portable environments that can run on any machine with Docker ins...

  • Answered by AI
  • Q3. How to see log of a complete request in docker
  • Ans. 

    To see log of a complete request in docker, use docker logs command.

    • Use 'docker logs ' command to see logs of a specific container

    • Use '-f' flag to follow the logs in real-time

    • Use '--tail' flag to specify the number of lines to show from the end of the logs

    • Use '--since' and '--until' flags to specify a time range for the logs

    • Use '--timestamps' flag to show timestamps in the logs

Answered by AI
Round 4 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Some manarigial questions.

Interview Preparation Tips

Topics to prepare for LanceSoft Senior Engineer interview:
  • core java
  • spring core
  • Project Management
  • MySQL
  • query
Interview preparation tips for other job seekers - prepare well before attempting this interview with all core parts of java MySQL and spring boot.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(8 Questions)

  • Q1. What is the Full form of TMT
  • Ans. 

    TMT stands for Thermo-Mechanically Treated reinforcement bars used in construction.

    • TMT bars are made by subjecting mild steel bars to a combination of heat treatment and mechanical deformation.

    • This process imparts greater strength and ductility to the bars, making them ideal for use in construction.

    • TMT bars are widely used in reinforced concrete structures such as buildings, bridges, and dams.

    • They offer superior corros...

  • Answered by AI
  • Q2. What is the 500DMeans at TMT bars?
  • Ans. 

    500D means the yield strength of TMT bars is 500 MPa.

    • 500D is a grade of TMT bars used in construction.

    • The 'D' stands for ductility, which is the ability of the material to deform without breaking.

    • The yield strength of 500D TMT bars is 500 MPa.

    • These bars are commonly used in high-rise buildings, bridges, and other structures that require high strength and durability.

  • Answered by AI
  • Q3. What is the required steel at the percentage concrete?
  • Ans. 

    The required steel at the percentage concrete depends on the design and specifications of the structure.

    • The amount of steel reinforcement needed in concrete is determined by the design and specifications of the structure.

    • Factors such as the size and shape of the structure, the loads it will bear, and the desired strength and durability of the concrete will all affect the required steel percentage.

    • The steel percentage c...

  • Answered by AI
  • Q4. What is the stress and strain?
  • Ans. 

    Stress is the force applied per unit area, while strain is the deformation caused by stress.

    • Stress is a measure of the internal forces within a material, while strain is the measure of the deformation of the material.

    • Stress is expressed in units of force per unit area, while strain is expressed as a ratio of the change in length or shape to the original length or shape.

    • Stress and strain are related by the material's el...

  • Answered by AI
  • Q5. Which type of stress failure at brick wall?
  • Ans. 

    The stress failure at brick wall can be due to compressive or tensile stress.

    • Compressive stress failure occurs when the brick wall is unable to withstand the weight or load placed on it.

    • Tensile stress failure occurs when the brick wall is unable to withstand the forces that pull it apart.

    • Cracking, bulging, or collapse of the wall can be signs of stress failure.

    • Reinforcing the wall with steel bars or using thicker brick

  • Answered by AI
  • Q6. White marvel is this rock?
  • Ans. 

    White marble is a metamorphic rock composed of recrystallized carbonate minerals, mainly calcite or dolomite.

    • It is commonly used in construction and sculpture.

    • It is formed from limestone or dolomite that has undergone heat and pressure.

    • It is often found in quarries in countries such as Italy, Greece, and India.

  • Answered by AI
  • Q7. What is myka sis ?
  • Q8. Standerd Coarse sand size?
  • Ans. 

    Standard coarse sand size ranges from 2.0mm to 4.75mm.

    • Standard coarse sand is commonly used in construction and civil engineering projects.

    • It is typically graded between 2.0mm to 4.75mm in size.

    • This type of sand is often used as a base material for concrete and asphalt.

    • It can also be used for drainage systems and as a bedding material for pipes.

    • The size and shape of the sand particles can affect the strength and durabi

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Up above these questions are very good. Very much challenge when you have few time period of project, vast priority of project,and contractors are unidentified what is doing the job first to last .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Group Discussion 

Discussion on the changes in tecehnology

Round 2 - Coding Test 

Test followed by the questions and scenario based questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Size of slump cone
  • Ans. 

    The size of a slump cone is a tool used in concrete testing to measure the consistency of fresh concrete.

    • The size of a slump cone is typically 12 inches in height.

    • The base diameter of a slump cone is usually 8 inches.

    • The top diameter of a slump cone is typically 4 inches.

    • The size of a slump cone may vary depending on specific testing requirements or standards.

    • The dimensions of a slump cone are important for accurate me...

  • Answered by AI
  • Q2. Estimation of aggregate quantity for 200sqmt slab
  • Ans. 

    To estimate aggregate quantity for a 200sqmt slab, calculate the volume of concrete required and then determine the aggregate quantity based on the mix ratio.

    • Calculate the volume of concrete required for the slab

    • Determine the mix ratio of concrete (e.g., 1:2:4)

    • Calculate the volume of aggregates needed based on the mix ratio

    • Consider the bulk density of aggregates to convert volume to weight

    • Account for wastage and add a

  • Answered by AI
  • Q3. What are previous quality we need to check before casting
  • Ans. 

    Before casting, civil engineers need to check the quality of various elements.

    • Quality of concrete mix

    • Quality of reinforcement bars

    • Quality of formwork

    • Quality of water used in the mix

    • Quality of curing process

  • Answered by AI
  • Q4. How many cubes we have to take for 250cum concrete
  • Ans. 

    The number of cubes required for 250 cubic meters of concrete depends on the size of the cubes.

    • The size of the cubes needs to be specified to determine the number required.

    • The volume of each cube needs to be calculated.

    • Divide the total volume of concrete (250 cubic meters) by the volume of each cube to get the number of cubes required.

    • For example, if the cubes are 1 cubic meter in size, then 250 cubes would be needed.

  • Answered by AI
  • Q5. Post concrete quality inspection?
  • Ans. 

    Post concrete quality inspection involves evaluating the quality of concrete after it has been placed and hardened.

    • Inspect the concrete for any visible defects such as cracks, honeycombing, or segregation.

    • Check the concrete strength by conducting compressive strength tests on samples taken from the structure.

    • Assess the concrete's durability by examining its resistance to factors like freeze-thaw cycles or chemical expo...

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. 1.Grade of concrete..
  • Ans. 

    The grade of concrete refers to its strength and durability.

    • Concrete is classified into different grades based on its compressive strength.

    • The grade of concrete is denoted by a number followed by the letter 'M' (e.g., M20, M25).

    • The number represents the compressive strength of concrete in megapascals (MPa) after 28 days of curing.

    • Higher grade concrete has higher strength and is used for heavy-duty structures like bridg...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Basic physics. Mechanics etc.
  • Q2. Acceleration due to gravity
  • Ans. 

    Acceleration due to gravity is the force that pulls objects towards the center of the earth.

    • The acceleration due to gravity on Earth is approximately 9.8 m/s².

    • It varies depending on the location and altitude.

    • It is responsible for the weight of objects on Earth.

    • It is also used in various scientific calculations and experiments.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself. Confidence is key, they don't usually check technicals.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

C,c++ ,javaa,python website etc

Round 2 - Technical 

(1 Question)

  • Q1. Technical Departments
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Coding Test 

Good coding test with spark coding

Round 2 - HR 

(2 Questions)

  • Q1. Experience with project
  • Ans. 

    Led a team in designing and implementing a solar power project for a rural community.

    • Managed project timeline and budget effectively

    • Coordinated with stakeholders and team members

    • Implemented innovative solutions to overcome challenges

    • Ensured project met quality standards and safety regulations

  • Answered by AI
  • Q2. Salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - be confident

ManpowerGroup Interview FAQs

How many rounds are there in ManpowerGroup Civil Engineer interview?
ManpowerGroup interview process usually has 1 rounds. The most common rounds in the ManpowerGroup interview process are Technical.

Tell us how to improve this page.

Join ManpowerGroup Powering Success in Human Resource Management.

Interview Questions from Similar Companies

Randstad Interview Questions
3.8
 • 263 Interviews
ABC Consultants Interview Questions
3.9
 • 189 Interviews
LanceSoft Interview Questions
3.1
 • 57 Interviews
PeopleStrong Interview Questions
3.4
 • 52 Interviews
Experis IT Interview Questions
3.0
 • 48 Interviews
CIEL HR Interview Questions
3.9
 • 48 Interviews
eTeam Interview Questions
3.2
 • 41 Interviews
View all
ManpowerGroup Civil Engineer Salary
based on 24 salaries
₹4.1 L/yr - ₹8 L/yr
40% more than the average Civil Engineer Salary in India
View more details

ManpowerGroup Civil Engineer Reviews and Ratings

based on 7 reviews

2.9/5

Rating in categories

1.2

Skill development

3.0

Work-life balance

2.4

Salary

1.3

Job security

2.0

Company culture

1.7

Promotions

1.9

Work satisfaction

Explore 7 Reviews and Ratings
Associate Consultant
131 salaries
unlock blur

₹2.2 L/yr - ₹5.9 L/yr

Consultant
109 salaries
unlock blur

₹2.8 L/yr - ₹7.6 L/yr

Talent Acquisition Specialist
77 salaries
unlock blur

₹2.2 L/yr - ₹5.5 L/yr

Sales Executive
72 salaries
unlock blur

₹1.4 L/yr - ₹4.8 L/yr

Talent Acquisition Consultant
69 salaries
unlock blur

₹3.2 L/yr - ₹6 L/yr

Explore more salaries
Compare ManpowerGroup with

Randstad

3.8
Compare

Innovsource Services

4.0
Compare

IMPACT Infotech

3.4
Compare

Teamware Solutions

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview