i
CIEL HR
Filter interviews by
A box segment can be made by cutting a box into two parts along one of its faces.
Choose a face of the box to cut along
Use a saw or knife to cut through the box along the chosen face
Sand the edges of the cut to smooth them out if necessary
I applied via Naukri.com and was interviewed before Feb 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.
The manpower required to complete a plan depends on the scope, complexity, and timeline of the project.
Manpower requirements can vary based on the size and complexity of the project.
Consider the skills and expertise needed for each task in the plan.
Factor in the timeline and deadlines for completing the plan.
Utilize project management tools to estimate manpower needs accurately.
Example: A large-scale construction proje...
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
Core Java is a programming language that supports OOPs concepts such as inheritance, encapsulation, abstraction, and polymorphism.
Core Java is an object-oriented programming language.
It supports encapsulation, which means hiding the implementation details of an object from the outside world.
Inheritance allows a class to inherit properties and methods from another class.
Abstraction is the process of hiding complex imple...
Docker is a containerization platform that allows developers to package and run applications in isolated environments. Kubernetes is an open-source container orchestration system that automates deployment, scaling, and management of containerized applications.
Docker allows developers to create and run applications in containers, which are lightweight and portable environments that can run on any machine with Docker ins...
To see log of a complete request in docker, use docker logs command.
Use 'docker logs
Use '-f' flag to follow the logs in real-time
Use '--tail' flag to specify the number of lines to show from the end of the logs
Use '--since' and '--until' flags to specify a time range for the logs
Use '--timestamps' flag to show timestamps in the logs
The grade of concrete refers to its strength and durability.
Concrete is classified into different grades based on its compressive strength.
The grade of concrete is denoted by a number followed by the letter 'M' (e.g., M20, M25).
The number represents the compressive strength of concrete in megapascals (MPa) after 28 days of curing.
Higher grade concrete has higher strength and is used for heavy-duty structures like bridg...
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 3 interview rounds.
Yes, I can work with metal packing.
I have experience working with metal packaging in my previous job.
I am familiar with the different types of metal packaging materials and their properties.
I can use tools and equipment to handle and manipulate metal packaging.
I can follow safety protocols when working with metal packaging.
I can troubleshoot and fix issues with metal packaging if needed.
Yes, I have experience in running axles perfectly.
I have experience in operating and maintaining various types of axles.
I ensure that the axle is properly lubricated and aligned before running it.
I monitor the axle's performance and make adjustments as necessary.
I follow all safety protocols and guidelines while operating the axle.
For example, I have experience in running the axle of a heavy-duty truck and ensuring tha
Time & Work, Time & Distance
India a digital economy
Column and beam sizes are determined by the load they need to support and the span they need to cover.
The size of the column and beam is determined by the load they need to support and the span they need to cover.
The material used for the column and beam also affects their size.
The size of the column and beam can be calculated using structural engineering software.
For example, a 20-foot span with a load of 10,000 pound...
I will assess the severity of the void and determine the appropriate course of action.
Conduct a thorough inspection of the structure to determine the size and location of the void
Evaluate the potential impact of the void on the structural integrity of the building
Determine the appropriate repair method based on the severity of the void and the type of structure
Consult with structural engineers and other experts as need...
I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.
The size of a slump cone is a tool used in concrete testing to measure the consistency of fresh concrete.
The size of a slump cone is typically 12 inches in height.
The base diameter of a slump cone is usually 8 inches.
The top diameter of a slump cone is typically 4 inches.
The size of a slump cone may vary depending on specific testing requirements or standards.
The dimensions of a slump cone are important for accurate me...
To estimate aggregate quantity for a 200sqmt slab, calculate the volume of concrete required and then determine the aggregate quantity based on the mix ratio.
Calculate the volume of concrete required for the slab
Determine the mix ratio of concrete (e.g., 1:2:4)
Calculate the volume of aggregates needed based on the mix ratio
Consider the bulk density of aggregates to convert volume to weight
Account for wastage and add a
Before casting, civil engineers need to check the quality of various elements.
Quality of concrete mix
Quality of reinforcement bars
Quality of formwork
Quality of water used in the mix
Quality of curing process
The number of cubes required for 250 cubic meters of concrete depends on the size of the cubes.
The size of the cubes needs to be specified to determine the number required.
The volume of each cube needs to be calculated.
Divide the total volume of concrete (250 cubic meters) by the volume of each cube to get the number of cubes required.
For example, if the cubes are 1 cubic meter in size, then 250 cubes would be needed.
Post concrete quality inspection involves evaluating the quality of concrete after it has been placed and hardened.
Inspect the concrete for any visible defects such as cracks, honeycombing, or segregation.
Check the concrete strength by conducting compressive strength tests on samples taken from the structure.
Assess the concrete's durability by examining its resistance to factors like freeze-thaw cycles or chemical expo...
I applied via Approached by Company and was interviewed before Dec 2021. There were 3 interview rounds.
Yes, I have experience inspecting structural items.
I have inspected structural items in my previous roles as a quality engineer.
I am familiar with the relevant codes and standards for structural inspections.
I have experience using various inspection tools and equipment.
I am able to identify defects and recommend corrective actions.
For example, I have inspected steel structures, concrete foundations, and building frames
Junior Engineer
110
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Associate Consultant
68
salaries
| ₹1.8 L/yr - ₹4 L/yr |
HR Recruiter
66
salaries
| ₹1.2 L/yr - ₹3.7 L/yr |
AST Consultant
62
salaries
| ₹2.3 L/yr - ₹3.9 L/yr |
Facility Executive
60
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Randstad
Team Lease
Innovsource Services
IMPACT Infotech