Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Larsen & Toubro Limited Team. If you also belong to the team, you can get access from here

Larsen & Toubro Limited Verified Tick

Compare button icon Compare button icon Compare
4.0

based on 18.1k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Larsen & Toubro Limited Site Incharge and Site Supervisor Interview Questions and Answers

Updated 11 Aug 2024

Larsen & Toubro Limited Site Incharge and Site Supervisor Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. About Tower Erection
  • Q2. About Foundation

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(6 Questions)

  • Q1. Why use Steel in Construction works.
  • Ans. 

    Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.

    • Steel is durable and resistant to corrosion, ensuring the longevity of structures.

    • Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.

    • Steel is cost-effec...

  • Answered by AI
  • Q2. Why Provided Concrete Cover in all Structures Members.
  • Ans. 

    Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.

    • Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.

    • It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.

    • Proper concrete cover helps in maintaining the durability and streng...

  • Answered by AI
  • Q3. How to do Calculate Staircase Steel.
  • Ans. 

    Calculate the amount of steel required for a staircase based on design and dimensions.

    • Calculate the total length of all the steel bars needed for the staircase

    • Determine the diameter and spacing of the steel bars based on design requirements

    • Consider the number of steps and the dimensions of the staircase in the calculation

    • Account for any additional reinforcement needed for structural integrity

    • Consult structural drawings

  • Answered by AI
  • Q4. How do I Find Concrete Workability.
  • Ans. 

    Concrete workability can be determined by conducting a slump test.

    • Conduct a slump test to measure the consistency of the concrete mix.

    • Adjust the water content or use admixtures to achieve the desired workability.

    • Consider factors such as temperature, humidity, and type of aggregates in determining workability.

    • Consult with concrete mix design experts for guidance on achieving the desired workability.

    • Use tools like flow t...

  • Answered by AI
  • Q5. What is Slum test for Concrete.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.

    • The test helps ensure the concrete is of the right consistency for proper placement and compaction.

    • Slump tes...

  • Answered by AI
  • Q6. What is Concrete Mix Design.
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix design to meet project requirements

    • Example: A ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(3 Questions)

  • Q1. Electrical field
  • Q2. Site trouble shooting problem discussion
  • Q3. No not at all
Round 2 - Case Study 

For any case study related to field

Round 3 - Group Discussion 

For my technical field questions

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Structural site questions
  • Q2. Fhinishing questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer for villa stectur work from Shalimar one world
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Exam will be conduct for aptitude test

Round 3 - Technical 

(3 Questions)

  • Q1. Any asked questions my Bulding mteriyal i will attemt given answer your questions
  • Q2. Bulding material any questions
  • Q3. Can u any questions my releted tred

Interview Preparation Tips

Topics to prepare for GMR Group Site Engineer interview:
  • Bulding meterial
Interview preparation tips for other job seekers - A standardized test is a test that is administered and scored in a consistent, or "standard", manner
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. All ques related to your work in current company
  • Q2. About Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Give interview with confidence and be aware for salary negotiation
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Campus Placement

Round 1 - Technical 

(2 Questions)

  • Q1. What is the overlap
  • Ans. 

    Overlap refers to the area where two or more elements share common space or features.

    • Overlap occurs when two or more elements occupy the same physical space or have common characteristics.

    • In civil engineering, overlap can refer to the area where two construction elements meet, such as overlapping rebar in a concrete structure.

    • Overlap can also occur in surveying when two survey lines intersect or overlap each other.

    • Prop...

  • Answered by AI
  • Q2. Why do you overlap
  • Ans. 

    Overlapping in civil engineering is done to ensure proper continuity and strength in construction.

    • Overlapping is done to ensure continuity of reinforcement bars in concrete structures.

    • It helps in distributing the load evenly and prevents sudden failure.

    • Overlapping also helps in providing the required strength to the structure.

    • Proper overlapping ensures that the structure can withstand various stresses and forces.

    • For ex...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. What is the ratio of brick work
  • Ans. 

    The ratio of brick work refers to the proportion of bricks used in a construction project compared to other materials.

    • The ratio of brick work can vary depending on the type of construction project and design specifications.

    • Common ratios for brick work include 1:4 (1 part cement to 4 parts sand) for mortar mix and 1:6 (1 part cement to 6 parts sand) for brick laying.

    • The ratio may also be specified in terms of the number...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No as your wish I am ready
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

Online exam 50 marks in VC.

Round 3 - HR 

(2 Questions)

  • Q1. Current job responsibilities, CTC.
  • Q2. Methodology about Finishing work like Tiles work, Paint, False ceiling.

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge about your branches.

Larsen & Toubro Limited Interview FAQs

How many rounds are there in Larsen & Toubro Limited Site Incharge and Site Supervisor interview?
Larsen & Toubro Limited interview process usually has 1 rounds. The most common rounds in the Larsen & Toubro Limited interview process are HR.
What are the top questions asked in Larsen & Toubro Limited Site Incharge and Site Supervisor interview?

Some of the top questions asked at the Larsen & Toubro Limited Site Incharge and Site Supervisor interview -

  1. About Tower Erect...read more
  2. About Foundat...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.3k Interviews
Tata Projects Interview Questions
4.2
 • 406 Interviews
Tata Group Interview Questions
4.2
 • 357 Interviews
Tata Technologies Interview Questions
3.6
 • 252 Interviews
TCE Interview Questions
3.8
 • 242 Interviews
View all
Assistant Manager
3.8k salaries
unlock blur

₹6.2 L/yr - ₹20.2 L/yr

Senior Engineer
3.4k salaries
unlock blur

₹4.5 L/yr - ₹12.5 L/yr

Assistant Construction Manager
1.2k salaries
unlock blur

₹6 L/yr - ₹16.6 L/yr

Engineer
1.2k salaries
unlock blur

₹1.6 L/yr - ₹9.3 L/yr

Manager
1.1k salaries
unlock blur

₹9.6 L/yr - ₹30 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview