Filter interviews by
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
Online exam 50 marks in VC.
Currently responsible for managing construction projects and overseeing site activities. CTC is confidential.
Managing construction projects from start to finish
Overseeing site activities and ensuring compliance with safety regulations
Coordinating with contractors, architects, and other stakeholders
Preparing project schedules and budgets
Conducting site inspections and quality control checks
About personality, work schedule, team work, Kick of work, progress achieving goals.
I applied via Walk-in and was interviewed in Apr 2022. There was 1 interview round.
The lapping zone in beams, columns, and slabs is the area where reinforcement bars overlap to ensure structural integrity.
Lapping zone is typically located at the ends of beams, columns, and slabs.
It is necessary to provide sufficient overlap of reinforcement bars to transfer loads effectively.
The length of the lapping zone depends on the design requirements and the diameter of the reinforcement bars.
Lapping helps in m...
The load capacity of a 1.5m MS probe depends on various factors and cannot be determined without additional information.
The load capacity of a 1.5m MS probe depends on its diameter, material composition, and design.
The soil conditions and type of foundation also play a significant role in determining the load capacity.
Without specific details about the probe and the project requirements, it is not possible to provide a...
The unit weight of cement mortar varies depending on the mix ratio and the density of the materials used.
The unit weight of cement mortar is typically between 2200 to 2500 kilograms per cubic meter (kg/m³).
The unit weight can be calculated by multiplying the density of cement mortar by the volume of the material.
The density of cement mortar is influenced by the proportions of cement, sand, and water in the mix.
Differen...
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
Structure building involves planning, designing, and constructing buildings or other structures.
Structural analysis and design are key components
Materials selection is crucial for durability and strength
Construction process includes site preparation, foundation laying, framing, and finishing
Quality control and safety measures must be implemented throughout the process
The step by step process for a Civil Site Engineer involves planning, designing, and overseeing construction projects.
1. Conduct site investigations and surveys to determine project feasibility.
2. Develop project plans and specifications, including cost estimates and timelines.
3. Obtain necessary permits and approvals from local authorities.
4. Oversee construction activities to ensure compliance with design specificati...
Shapoorji Pallonji Group interview questions for designations
Top trending discussions
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
posted on 1 Jun 2021
I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
posted on 7 Sep 2022
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.
based on 8 interviews
1 Interview rounds
based on 79 reviews
Rating in categories
Deputy Manager
616
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Senior Engineer
403
salaries
| ₹4 L/yr - ₹12 L/yr |
Construction Engineer
281
salaries
| ₹3 L/yr - ₹8.5 L/yr |
Civil Engineer
271
salaries
| ₹2 L/yr - ₹8.9 L/yr |
Civil Site Engineer
225
salaries
| ₹1.5 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Alstom Transportation
Kalpataru Projects International