I applied via Campus Placement and was interviewed before Aug 2020. There was 1 interview round.
I was interviewed in Aug 2023.
I applied via Referral and was interviewed before Aug 2022. There were 4 interview rounds.
IS Code Mode of Measurements refers to the Indian Standard code for measurement practices in construction projects.
IS Code Mode of Measurements is a set of guidelines provided by the Bureau of Indian Standards (BIS) for accurate measurement of quantities in construction projects.
These guidelines cover various aspects such as units of measurement, methods of measurement, and rules for taking measurements.
For example, IS...
posted on 6 Feb 2025
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via LinkedIn and was interviewed in May 2023. There were 5 interview rounds.
Technology development based on question
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Exam will be conduct for aptitude test
I was interviewed in Oct 2022.
I applied via Approached by Company
Lap length and development length for hoop, grade of concrete, and HDPE pipe are specified in code.
Lap length for hoop reinforcement is specified in IS 456:2000 and varies based on the diameter of the bar and the grade of concrete.
Development length is the length of the bar required to transfer the stress from the bar to the surrounding concrete and is also specified in IS 456:2000.
The grade of concrete determines the ...
posted on 3 Mar 2021
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
The bund height of my previous job was 3 meters.
The bund height refers to the height of an embankment or barrier constructed to contain or control the flow of liquids, such as water or chemicals.
In my previous job, I was responsible for designing and constructing a bund to contain hazardous materials.
The bund height of 3 meters was determined based on the volume and characteristics of the materials being stored.
I ensur...
Bottom width of the dam is the width of the base of the dam at its lowest point.
Bottom width is an important factor in determining the stability of the dam.
It is usually wider than the top width to provide a stable foundation.
The width varies depending on the height and type of dam.
For example, a concrete gravity dam may have a bottom width of 1/4 to 1/3 of its height.
A rockfill dam may have a bottom width of 1/2 to 2/
The procedure to start an earthen dam involves site selection, design, construction, and maintenance.
Site selection involves identifying a suitable location with adequate soil and water resources.
Design involves determining the dam's height, width, and slope, as well as spillway and outlet structures.
Construction involves excavating the foundation, building the embankment, and installing spillway and outlet structures.
...
based on 1 review
Rating in categories
Assistant Manager
3.9k
salaries
| ₹6.5 L/yr - ₹18 L/yr |
Senior Engineer
3.4k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Manager
1.3k
salaries
| ₹9 L/yr - ₹30 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9.3 L/yr |
Assistant Construction Manager
1k
salaries
| ₹6 L/yr - ₹17 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra