I applied via Referral and was interviewed before Aug 2022. There were 4 interview rounds.
IS Code Mode of Measurements refers to the Indian Standard code for measurement practices in construction projects.
IS Code Mode of Measurements is a set of guidelines provided by the Bureau of Indian Standards (BIS) for accurate measurement of quantities in construction projects.
These guidelines cover various aspects such as units of measurement, methods of measurement, and rules for taking measurements.
For example, IS...
I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.
Cognitive plus technical Test of 1hr 40 min for Technical and 20min for cognitive
Top trending discussions
I was interviewed in Aug 2023.
I applied via Campus Placement and was interviewed before Aug 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via LinkedIn and was interviewed in May 2023. There were 5 interview rounds.
Technology development based on question
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Exam will be conduct for aptitude test
posted on 5 Aug 2022
Steel quantity can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel required for the project
Determine the density of the specific type of steel being used
Multiply the volume by the density to obtain the steel quantity
Consider any wastage or additional steel required for reinforcement
Example: To calculate steel quantity for a column, multiply the cross-sectional area of the c
The unit weight of steel refers to the weight of a specific volume of steel material.
Unit weight of steel is typically measured in kilograms per cubic meter (kg/m³).
The unit weight of steel can vary depending on the type and grade of steel.
For example, the unit weight of mild steel is around 7850 kg/m³.
Higher strength steels like stainless steel can have a higher unit weight.
Unit weight is an important factor in struct
Slab details refer to the specifications and characteristics of a concrete slab used in construction.
Slab details include the thickness, reinforcement, and type of slab.
The thickness of a slab depends on the load it needs to support.
Reinforcement in slabs is typically provided using steel bars or mesh.
Different types of slabs include one-way slab, two-way slab, flat slab, etc.
Slab details also include the finishing mat
To check column beam reinforcement and slab design on site, follow these steps:
Review the structural drawings and specifications to understand the design requirements
Inspect the reinforcement bars for proper placement, size, and spacing
Check the concrete cover thickness to ensure it meets the design requirements
Verify the alignment and verticality of columns and beams using plumb bobs or laser levels
Measure the dimensi...
How to work with us?
I was interviewed in Oct 2022.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Deputy Manager
612
salaries
| ₹6 L/yr - ₹16 L/yr |
Senior Engineer
428
salaries
| ₹4 L/yr - ₹12 L/yr |
Construction Engineer
301
salaries
| ₹3 L/yr - ₹9 L/yr |
Civil Site Engineer
234
salaries
| ₹1.8 L/yr - ₹9 L/yr |
Safety Officer
224
salaries
| ₹1.8 L/yr - ₹8.4 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra