Larsen & Toubro Limited Project Engineer Interview Questions, Process, and Tips for Experienced

Updated 11 Apr 2025

Top Larsen & Toubro Limited Project Engineer Interview Questions and Answers for Experienced

Larsen & Toubro Limited Project Engineer Interview Experiences for Experienced

4 interviews found

Project Engineer Interview Questions & Answers

user image S.Gunasekar

posted on 11 Apr 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. Solar plant operation and maintenance
  • Q2. Cable IR test values
  • Q3. ITP and check list
  • Q4. Cable trench and module series connection
  • Q5. Surveillance point of site inspection
  • Q6. What is means DPR ,WPR ,MPR
  • Q7. What is mean TBT , PTST
  • Q8. Cable trench sizes
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the pressure rating for steam pipes?
  • Ans. 

    The pressure rating for steam pipes varies depending on the material and size of the pipe.

    • Pressure rating for steam pipes is typically determined by the material and size of the pipe.

    • Common pressure ratings for steam pipes range from 150 psi to 2500 psi.

    • It is important to consult industry standards and guidelines for specific pressure ratings based on the application and conditions.

  • Answered by AI
  • Q2. What did you do in your project? And asked in depth questions including construction and mechanical engineering

Project Engineer Interview Questions Asked at Other Companies for Experienced

asked in Wipro
Q1. Segregate Odd-Even Problem Statement In a wedding ceremony at Nin ... read more
Q2. What is the difference between lap length and Anchorage length ?
Q3. 4)what is sag and how to minimize it. 5)if a consumer having dist ... read more
Q4. How to solve the Point load, UDL, UVL load problems
Q5. How you do the rate analysis for additional item and what are the ... read more

Project Engineer Interview Questions & Answers

user image MAHENDRA GUPTA

posted on 6 Oct 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is 3D model
  • Ans. 

    A 3D model is a digital representation of a physical object or space created using computer software.

    • A 3D model consists of vertices, edges, and faces to create a three-dimensional representation.

    • It can be used in various industries such as architecture, engineering, gaming, and animation.

    • 3D models can be created from scratch or generated from 3D scanning technologies.

    • They are often used for visualization, prototyping,

  • Answered by AI
  • Q2. Advantage of 3d model
  • Ans. 

    3D models provide a visual representation of a project, aiding in design, communication, and problem-solving.

    • Allows for better visualization of the project

    • Helps in detecting design flaws before construction begins

    • Facilitates communication among team members and stakeholders

    • Can be used for virtual walkthroughs and simulations

    • Improves accuracy and efficiency in project planning and execution

  • Answered by AI
  • Q3. Stick built vs modularization
  • Ans. 

    Stick built involves on-site construction while modularization involves off-site construction and assembly.

    • Stick built involves constructing the building on-site, piece by piece.

    • Modularization involves building sections of the structure off-site and assembling them on-site.

    • Stick built allows for more customization and flexibility in design.

    • Modularization can be faster and more cost-effective for certain projects, espec...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Logical question for clearing the round 1

Round 3 - Group Discussion 

Group discussion with batchmate

Round 4 - One-on-one 

(1 Question)

  • Q1. Design , technical

Larsen & Toubro Limited interview questions for designations

 Project Engineer Hvac

 (1)

 Electrical Project Engineer

 (1)

 Project Manager

 (5)

 Project Coordinator

 (1)

 Project Planner

 (1)

 Project Lead

 (1)

 Senior Project Manager

 (2)

 Assistant Project Manager

 (1)

Interview questions from similar companies

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Basic questions

Interview Preparation Tips

Interview preparation tips for other job seekers - candidates which were recruited by JMC in the year 2018 are getting less payments than the students recruited in the year 2019. The same happened to me and I left just because casual behavior from the management.

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Question about material reconciliation, allowable wastage question based on previous work experience
  • Q2. It's not easy to describe it in a few words because of the interview time is more

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare point base answer what u have done in ur present service and what u r going to offer them by considering a technical aspects

I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Baching plant Rmu Tamrock Shotcrete machine Grouting pumps Layout of project Crusher plant
  • Q2. Why you want to join Why you want to leave Why we hire you
  • Ans. 

    I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.

    • Seeking new challenges and opportunities for skill development

    • Leaving for career growth and advancement

    • Experience and expertise in the field

    • Ability to contribute effectively to the team and projects

  • Answered by AI

Interview Preparation Tips

General Tips: Be positive
Be prepared
Be calm
Don't be stressed


Skills: Communication, Problem Solving, Leadership, Time Management
Duration: <1 week

Larsen & Toubro Limited Interview FAQs

How many rounds are there in Larsen & Toubro Limited Project Engineer interview for experienced candidates?
Larsen & Toubro Limited interview process for experienced candidates usually has 2 rounds. The most common rounds in the Larsen & Toubro Limited interview process for experienced candidates are Resume Shortlist, Technical and Aptitude Test.
How to prepare for Larsen & Toubro Limited Project Engineer interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Larsen & Toubro Limited. The most common topics and skills that interviewers at Larsen & Toubro Limited expect are Project Engineering, Project Management, Offshore, Project Planning and Commissioning.
What are the top questions asked in Larsen & Toubro Limited Project Engineer interview for experienced candidates?

Some of the top questions asked at the Larsen & Toubro Limited Project Engineer interview for experienced candidates -

  1. What is the pressure rating for steam pip...read more
  2. What is 3D mo...read more
  3. Advantage of 3d mo...read more

Tell us how to improve this page.

Larsen & Toubro Limited Project Engineer Interview Process for Experienced

based on 4 interviews

Interview experience

4.8
  
Excellent
View more
Larsen & Toubro Limited Project Engineer Salary
based on 210 salaries
₹2.2 L/yr - ₹11.5 L/yr
27% more than the average Project Engineer Salary in India
View more details

Larsen & Toubro Limited Project Engineer Reviews and Ratings

based on 31 reviews

3.9/5

Rating in categories

4.0

Skill development

3.6

Work-life balance

3.3

Salary

4.1

Job security

3.6

Company culture

2.8

Promotions

3.9

Work satisfaction

Explore 31 Reviews and Ratings
Assistant Manager
3.9k salaries
unlock blur

₹5.3 L/yr - ₹18.4 L/yr

Senior Engineer
3.5k salaries
unlock blur

₹4.5 L/yr - ₹12.5 L/yr

Engineer
1.3k salaries
unlock blur

₹1.6 L/yr - ₹9.5 L/yr

Manager
1.1k salaries
unlock blur

₹9 L/yr - ₹29 L/yr

Civil Engineer
1k salaries
unlock blur

₹2.2 L/yr - ₹11 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview