Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Larsen & Toubro Limited Team. If you also belong to the team, you can get access from here

Larsen & Toubro Limited Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Larsen & Toubro Limited Project Engineer Interview Questions, Process, and Tips

Updated 31 Jan 2025

Top Larsen & Toubro Limited Project Engineer Interview Questions and Answers

Larsen & Toubro Limited Project Engineer Interview Experiences

4 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the pressure rating for steam pipes?
  • Ans. 

    The pressure rating for steam pipes varies depending on the material and size of the pipe.

    • Pressure rating for steam pipes is typically determined by the material and size of the pipe.

    • Common pressure ratings for steam pipes range from 150 psi to 2500 psi.

    • It is important to consult industry standards and guidelines for specific pressure ratings based on the application and conditions.

  • Answered by AI
  • Q2. What did you do in your project? And asked in depth questions including construction and mechanical engineering
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. What make s you in difficult situations
Round 3 - HR 

(1 Question)

  • Q1. Current salary and Expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q4. Mindbending Product Problem Statement You are given an array ARR ... read more
asked in Wipro
Q5. Difference between compiler and interpreter. Why do you apply to ... read more

Project Engineer Interview Questions & Answers

user image MAHENDRA GUPTA

posted on 6 Oct 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is 3D model
  • Ans. 

    A 3D model is a digital representation of a physical object or space created using computer software.

    • A 3D model consists of vertices, edges, and faces to create a three-dimensional representation.

    • It can be used in various industries such as architecture, engineering, gaming, and animation.

    • 3D models can be created from scratch or generated from 3D scanning technologies.

    • They are often used for visualization, prototyping,

  • Answered by AI
  • Q2. Advantage of 3d model
  • Ans. 

    3D models provide a visual representation of a project, aiding in design, communication, and problem-solving.

    • Allows for better visualization of the project

    • Helps in detecting design flaws before construction begins

    • Facilitates communication among team members and stakeholders

    • Can be used for virtual walkthroughs and simulations

    • Improves accuracy and efficiency in project planning and execution

  • Answered by AI
  • Q3. Stick built vs modularization
  • Ans. 

    Stick built involves on-site construction while modularization involves off-site construction and assembly.

    • Stick built involves constructing the building on-site, piece by piece.

    • Modularization involves building sections of the structure off-site and assembling them on-site.

    • Stick built allows for more customization and flexibility in design.

    • Modularization can be faster and more cost-effective for certain projects, espec...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

Logical question for clearing the round 1

Round 3 - Group Discussion 

Group discussion with batchmate

Round 4 - One-on-one 

(1 Question)

  • Q1. Design , technical

Larsen & Toubro Limited interview questions for designations

 Electrical Project Engineer

 (1)

 Project Engineer Hvac

 (1)

 Project Manager

 (5)

 Project Coordinator

 (1)

 Project Planner

 (1)

 Project Lead

 (1)

 Senior Project Manager

 (2)

 Project Construction Manager

 (1)

Project Engineer Jobs at Larsen & Toubro Limited

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

It was good as well as challenging

Round 3 - Technical 

(1 Question)

  • Q1. 1- cement testing 2- communication level 3- situation based question 4- awareness and confidence test 5- Techncial based question

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive and enhance your knowledge!!

I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Regarding your subject and work experience
Round 3 - HR 

(1 Question)

  • Q1. Your current package and further expectations.

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer all subjective questions in your field with full knowledge and confidence.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Related to field.
Round 2 - One-on-one 

(1 Question)

  • Q1. What is the market salery for civil engineer with 12 years experience?
  • Ans. 

    The market salary for a civil engineer with 12 years of experience varies depending on location, company size, and specific skills.

    • Market salary can range from $80,000 to $150,000 per year

    • Factors such as location (urban vs rural), company size, and industry specialization can impact salary

    • Additional certifications or advanced degrees can also increase salary potential

  • Answered by AI
Round 3 - Aptitude Test 

One question paper of 10 questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for technical interview.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Technicals about powertrain design
  • Q2. Basic questions about function of parts
  • Q3. Basic questions about how to address field concerns
Round 2 - HR 

(1 Question)

  • Q1. Why do you want to join

Interview Questionnaire 

2 Questions

  • Q1. CAE Basics related question
  • Q2. Occupant related questions

I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Coding Test 

2 c++ coding questions will be asked based on the STL and array operations

Round 2 - One-on-one 

(1 Question)

  • Q1. Project manager will ask you project related knowledge.
Round 3 - HR 

(1 Question)

  • Q1. Will discuss basic HR round questions and discuss salary.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare c++ well as many questions will be based on that
Contribute & help others!
anonymous
You can choose to be anonymous

Larsen & Toubro Limited Interview FAQs

How many rounds are there in Larsen & Toubro Limited Project Engineer interview?
Larsen & Toubro Limited interview process usually has 2-3 rounds. The most common rounds in the Larsen & Toubro Limited interview process are Resume Shortlist, Technical and HR.
How to prepare for Larsen & Toubro Limited Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Larsen & Toubro Limited. The most common topics and skills that interviewers at Larsen & Toubro Limited expect are Project Engineering, Project Management, Commissioning, Construction and Offshore.
What are the top questions asked in Larsen & Toubro Limited Project Engineer interview?

Some of the top questions asked at the Larsen & Toubro Limited Project Engineer interview -

  1. What is the pressure rating for steam pip...read more
  2. What is 3D mo...read more
  3. Advantage of 3d mo...read more

Recently Viewed

SALARIES

Daimler India Commercial Vehicles

INTERVIEWS

Mahindra & Mahindra

No Interviews

LIST OF COMPANIES

Discover companies

Find best workplace

SALARIES

Daimler India Commercial Vehicles

SALARIES

Daimler India Commercial Vehicles

REVIEWS

Daimler India Commercial Vehicles

No Reviews

REVIEWS

Godrej & Boyce Manufacturing

No Reviews

REVIEWS

Godrej & Boyce Manufacturing

No Reviews

REVIEWS

Daimler India Commercial Vehicles

No Reviews

REVIEWS

Godrej & Boyce Manufacturing

No Reviews

Tell us how to improve this page.

Larsen & Toubro Limited Project Engineer Interview Process

based on 4 interviews

1 Interview rounds

  • Resume Shortlist Round
View more
Larsen & Toubro Limited Project Engineer Salary
based on 213 salaries
₹3.5 L/yr - ₹12.5 L/yr
48% more than the average Project Engineer Salary in India
View more details

Larsen & Toubro Limited Project Engineer Reviews and Ratings

based on 29 reviews

3.6/5

Rating in categories

3.7

Skill development

3.2

Work-life balance

2.7

Salary

4.1

Job security

3.1

Company culture

2.4

Promotions

3.6

Work satisfaction

Explore 29 Reviews and Ratings
Project Engineer

Mumbai

5-10 Yrs

₹ 3.75-17 LPA

Explore more jobs
Assistant Manager
4.2k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
3.5k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
1.2k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
1.2k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview