Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects

Compare button icon Compare button icon Compare
4.3

based on 5k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Projects Project Engineer Interview Questions and Answers

Updated 5 Jun 2024

Tata Projects Project Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Coding Test 

Code in python for class definition

Round 2 - Case Study 

Case study on business ethics

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare

Project Engineer Jobs at Tata Projects

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. HydroTest of DI and HDPE pipe
  • Ans. 

    Hydrostatic testing is a common method used to test the integrity of DI and HDPE pipes by pressurizing them with water.

    • Hydrostatic testing involves filling the pipe with water and pressurizing it to a specified level to check for leaks or weaknesses.

    • DI (Ductile Iron) pipes are typically tested at 1.5 times their working pressure, while HDPE (High-Density Polyethylene) pipes are tested at 1.25 times their working pressu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Bhai Vegetarian food allowed hai no nonveg food allowed. Aur Daru cigrette nahi pite to company tumhare baap ki samjho .
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to calculated pump head
  • Ans. 

    Pump head is calculated by adding the static head, friction head, and velocity head.

    • Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.

    • Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.

    • Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...

  • Answered by AI
  • Q2. How to oprate the fire alaram system
  • Ans. 

    To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.

    • Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.

    • Evacuate the building immediately using the nearest exit and do not use elevators.

    • Wait for emergency responders to arrive and provide them with any relevant information about the situation.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If existing staff learn to junior company growth will not held up
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Billing Site work
  • Q2. Billing and Site work
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Easy , kust want consistency and willingness to trelocate far off places

Round 2 - One-on-one 

(1 Question)

  • Q1. How would you deal with remote location of work
  • Ans. 

    I would ensure proper planning, communication, and use of technology to effectively manage work in remote locations.

    • Establish clear communication channels with team members and stakeholders

    • Utilize project management tools for tracking progress and deadlines

    • Implement regular check-ins and updates to ensure everyone is on the same page

    • Consider logistics and transportation challenges when planning work schedules

    • Leverage t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be confident and take care of optics
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Tendering department design department survey department questions are asked from project enginner

Interview Preparation Tips

Interview preparation tips for other job seekers - For engineer post questions are asked about survey department in core, then questions are asked about designing department, then about tendering department and when your department came like engg. They just minimise their questions
When questions are asked from 4 departments and you are only good in one department. Then your moral automatically came down
I had a question to all those project managers how could your 20+ years experience will be matched to 5 years experience of the candidates
And if you don’t want to select any candidate why you waste yours and candidate time . Just pick your referrals and finish the game.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Regarding mathematics and problem solving

Round 2 - Technical 

(2 Questions)

  • Q1. Regarding your past experience, roles and responsibilities,
  • Q2. Regarding cement, steel etc
Round 3 - HR 

(1 Question)

  • Q1. Regarding salary expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for subject regarding your core knowledge of experience in field and some basics of civil engineering

I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Structure related pile foundation
  • Q2. Pile testing ,girder stressing
  • Q3. How much miller required for 500 cum concrete transporting
  • Ans. 

    The amount of miller required for transporting 500 cum concrete depends on various factors.

    • The type of miller being used

    • The distance the concrete needs to be transported

    • The size of the project

    • The time frame for completing the project

    • The availability of resources

    • The budget allocated for the project

  • Answered by AI
  • Q4. Girder launching
  • Q5. Box underpasses

Interview Preparation Tips

Interview preparation tips for other job seekers - Give only answer to the point which is no you

Interview Questionnaire 

1 Question

  • Q1. They asked about previous experience and they asked me what’ are piling activities you followed let me explain that’s it

Interview Preparation Tips

Interview preparation tips for other job seekers - Share about your knowledge of work experience with confidently
Round 1 - Technical 

(1 Question)

  • Q1. They will ask basic technical questions on concrete technology

Interview Preparation Tips

Interview preparation tips for other job seekers - You should study the subject 1) concrete technology
2) soil mechanics
3) bending moment

Tata Projects Interview FAQs

How many rounds are there in Tata Projects Project Engineer interview?
Tata Projects interview process usually has 2 rounds. The most common rounds in the Tata Projects interview process are Coding Test and Case Study.
How to prepare for Tata Projects Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tata Projects. The most common topics and skills that interviewers at Tata Projects expect are High Rise Building, Project Engineering, Site Engineering, Finishing and MEP.

Tell us how to improve this page.

Join Tata Projects Simplify. Create.
Tata Projects Project Engineer Salary
based on 144 salaries
₹3 L/yr - ₹11.8 L/yr
21% more than the average Project Engineer Salary in India
View more details

Tata Projects Project Engineer Reviews and Ratings

based on 23 reviews

4.8/5

Rating in categories

4.6

Skill development

4.7

Work-life balance

4.3

Salary

4.4

Job security

4.6

Company culture

4.0

Promotions

4.6

Work satisfaction

Explore 23 Reviews and Ratings
Sr. Project Engineer - QS & Billing

Bhubaneswar,

Varanasi

7-10 Yrs

₹ 4.3-9 LPA

Sr. Project Engineer- QA QC

Varanasi,

Ahmedabad

6-9 Yrs

₹ 4.05-9.5 LPA

Sr. Project Engineer_Planning

Bhubaneswar,

Kolkata

+1

6-10 Yrs

₹ 4.05-9 LPA

Explore more jobs
Deputy Manager
1.1k salaries
unlock blur

₹5.8 L/yr - ₹17 L/yr

Assistant Manager
711 salaries
unlock blur

₹5 L/yr - ₹14.8 L/yr

Senior Engineer
400 salaries
unlock blur

₹4 L/yr - ₹14 L/yr

Manager
397 salaries
unlock blur

₹8 L/yr - ₹24.1 L/yr

Senior Manager
346 salaries
unlock blur

₹10.4 L/yr - ₹32.5 L/yr

Explore more salaries
Compare Tata Projects with

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview