Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Bajaj Electricals Team. If you also belong to the team, you can get access from here

Bajaj Electricals Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Bajaj Electricals Project Engineer Interview Questions and Answers

Updated 3 May 2019

Bajaj Electricals Project Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Nov 2018. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. In this Round Bajaj Deputy manager asking questions regarding my experiance in which i gain. Actually my Experience is in Rural Electification so that question best on it. I want share questions.
  • Q2. 1)What is servey in R.E. 2)Write DTR structure with BOQ. 3)if i give you a unelectified habitation then How to electified it and Burn a bulb on a consumer.
  • Ans. 

    Survey in R.E. refers to the process of collecting data and information about a specific area or site.

    • Survey in R.E. involves measuring and mapping the land, identifying boundaries, and assessing topography.

    • It helps in understanding the existing conditions of the site and is crucial for planning and designing construction projects.

    • Survey techniques include using GPS, total stations, and other instruments to gather accu...

  • Answered by AI
  • Q3. 4)what is sag and how to minimize it. 5)if a consumer having distance between pole and his house is 5mtr then how much cable you provide him for connection. 6)write Bill of materials of service connection
  • Ans. 

    Sag is the vertical distance between a conductor's position when it is in tension and its position when it is in a relaxed state.

    • Sag is caused by the weight of the conductor and environmental factors such as temperature and wind.

    • To minimize sag, conductors can be made of materials with higher tensile strength, or additional support structures like suspension insulators can be used.

    • Sag can also be minimized by increasin...

  • Answered by AI
  • Q4. 7)How to billing 1 km line.
  • Ans. 

    Billing for a 1 km line involves calculating the cost based on the length of the line and any additional factors.

    • Determine the cost per unit length of the line

    • Multiply the cost per unit length by the length of the line to calculate the total billing amount

    • Consider any additional factors that may affect the billing, such as taxes or fees

    • Provide a detailed breakdown of the billing to the client, including the cost per un

  • Answered by AI
  • Q5. 1)In this round only salary discussion.

Interview Preparation Tips

Round: Project manager interview on job location
Experience: 1)How to Earth a HT line .
2)Phase difference between Conductors.


General Tips: I advice all the Interviee during interview time take confidence on self. And reminder on mind that what we done from starting till now.



Skills: Computer knowledge, Body Language, Leadership, Presentation Skills, Decision Making Skills
Duration: 1-4 weeks

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. What's the function of wire harness.
  • Ans. 

    A wire harness is a collection of wires, cables, and connectors that transmit electrical signals and power between different components in a system.

    • Wire harnesses provide a neat and organized way to route and protect wires in a system.

    • They ensure proper connectivity and prevent wire damage or short circuits.

    • Wire harnesses simplify troubleshooting and maintenance by allowing easy identification and replacement of faulty...

  • Answered by AI
  • Q2. What is the function of sputtering.
  • Ans. 

    Sputtering is a process used in manufacturing to deposit thin films of material onto a surface.

    • Sputtering is a physical vapor deposition technique.

    • It involves bombarding a target material with high-energy ions or atoms.

    • This bombardment dislodges atoms from the target material, which then deposit onto a substrate.

    • Sputtering is commonly used in the production of semiconductor devices, solar cells, and thin film coatings.

    • ...

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. All technical questions raised

I applied via LinkedIn and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Basic Language related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - It was an easy interview, just get your basics right

I applied via Approached by Company and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. PLC, VFD, sensors, robot knowledge, Any language like C++, Python is additional advantage, mobile industry knowledge could also provide advantage
Round 2 - Technical 

(1 Question)

  • Q1. About yourself followed by one more technical round basically asking technical part from previous company
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - As a maintenance engineer if you are from mobile industry you will definitely get priority, other than this they require PLC and robotic knowlegde acquired professional for the testing equipment which are generally using drivers, motors, plc and programming part
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Discuss about last job role
  • Q2. Ask about product and market
Round 3 - One-on-one 

(2 Questions)

  • Q1. General discussion and last job role
  • Q2. Background and contacts
Round 4 - Technical 

(2 Questions)

  • Q1. How are you fit for this role
  • Q2. Technical knowledge about product
Round 5 - HR 

(2 Questions)

  • Q1. Salary discussion and joining details
  • Q2. Documents for joining
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed before Dec 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

Normal aptitude test along with a section of technical aptitude

Round 3 - Group Discussion 

Discussion in batches of 8 people on common topics

Round 4 - Technical 

(2 Questions)

  • Q1. Interview with VP
  • Q2. Going through resume BTech Project questions Aspirations Why HVAC
Round 5 - HR 

(1 Question)

  • Q1. Why HVAC Trick questions
  • Ans. 

    HVAC offers a challenging and rewarding career with opportunities for innovation and problem-solving.

    • HVAC allows me to work with complex systems and technologies.

    • I enjoy the problem-solving aspect of HVAC engineering.

    • HVAC offers a diverse range of projects and industries to work in.

    • I find satisfaction in creating comfortable and efficient indoor environments.

    • HVAC is a field that constantly evolves, providing opportunit

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company and culture.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. 7QC tools, VSM,
Round 3 - One-on-one 

(1 Question)

  • Q1. Low cost automation, Poka yoke
Round 4 - HR 

(1 Question)

  • Q1. Salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - uncertainity ask for more salary

I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About my last job description

Interview Preparation Tips

Interview preparation tips for other job seekers - Says limited and point to point thing, and be clear....

I applied via Recruitment Consulltant and was interviewed before Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Salary Notice period
  • Q2. Refrigeration cycle COP Types of starter VFD Mechanical question
  • Q3. All over technical

Interview Preparation Tips

Interview preparation tips for other job seekers - Blue star ltd is all over good company

Bajaj Electricals Interview FAQs

How to prepare for Bajaj Electricals Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Bajaj Electricals. The most common topics and skills that interviewers at Bajaj Electricals expect are Inspection, Management, Quality Standards, Reconciliation and Safety Training.
What are the top questions asked in Bajaj Electricals Project Engineer interview?

Some of the top questions asked at the Bajaj Electricals Project Engineer interview -

  1. 4)what is sag and how to minimize it. 5)if a consumer having distance between p...read more
  2. 1)What is servey in R.E. 2)Write DTR structure with BOQ. 3)if i give you a unel...read more
  3. 7)How to billing 1 km li...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Samsung Interview Questions
3.9
 • 550 Interviews
HARMAN Interview Questions
3.7
 • 264 Interviews
OPPO Interview Questions
4.0
 • 213 Interviews
LG Electronics Interview Questions
4.0
 • 201 Interviews
Blue Star Interview Questions
4.1
 • 164 Interviews
Apple Interview Questions
4.3
 • 139 Interviews
Voltas Interview Questions
4.0
 • 130 Interviews
IFB Interview Questions
3.6
 • 96 Interviews
Whirlpool Interview Questions
3.9
 • 94 Interviews
View all

Fast track your campus placements

View all
Bajaj Electricals Project Engineer Salary
based on 50 salaries
₹2.5 L/yr - ₹7 L/yr
9% less than the average Project Engineer Salary in India
View more details

Bajaj Electricals Project Engineer Reviews and Ratings

based on 27 reviews

4.1/5

Rating in categories

3.8

Skill development

4.0

Work-life balance

4.2

Salary

3.6

Job security

4.1

Company culture

3.7

Promotions

3.8

Work satisfaction

Explore 27 Reviews and Ratings
Assistant Manager
360 salaries
unlock blur

₹5.1 L/yr - ₹14.7 L/yr

Trade Sales Manager
219 salaries
unlock blur

₹5.5 L/yr - ₹16.3 L/yr

Senior Engineer
211 salaries
unlock blur

₹3.4 L/yr - ₹8.6 L/yr

Deputy Manager
198 salaries
unlock blur

₹6 L/yr - ₹16.5 L/yr

Electrical Engineer
181 salaries
unlock blur

₹1.8 L/yr - ₹6.6 L/yr

Explore more salaries
Compare Bajaj Electricals with

Samsung

3.9
Compare

OPPO

4.0
Compare

LG Electronics

4.0
Compare

HARMAN

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview