i
Bajaj Electricals
Filter interviews by
I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.
There is no such thing as pawar transfarmer.
JMC stands for Joint Measurement Committee and BOQ stands for Bill of Quantities.
JMC is a committee that is responsible for measuring the quantities of materials used in construction projects.
BOQ is a document that lists all the materials, parts, and labor required for a construction project.
BOQ is used to estimate the cost of a project and to ensure that all necessary materials and labor are accounted for.
JMC and BOQ ...
I am unable to provide my salary information at this time.
Salary information is confidential and should not be disclosed in an interview.
It is best to focus on discussing qualifications, experience, and skills instead of salary.
Salary expectations can be discussed during the negotiation phase if a job offer is extended.
I expect a competitive salary that reflects my skills, experience, and the responsibilities of the position.
I am looking for a salary that is in line with industry standards and the average salary for an electrical engineer in this location.
I would like to discuss the salary range for this position and negotiate based on my qualifications and the value I can bring to the company.
I am open to considering a comprehensive...
I have 5 years of experience as an Electrical Engineer in the power distribution industry.
Worked on designing and implementing electrical systems for commercial and residential buildings.
Performed electrical load calculations and created electrical schematics.
Conducted testing and troubleshooting of electrical equipment and systems.
Collaborated with cross-functional teams to ensure project success.
Stayed updated with i...
As a project engineer, my work involves planning, coordinating, and overseeing various aspects of engineering projects.
Developing project plans and schedules
Coordinating with different teams and stakeholders
Ensuring project objectives are met within budget and timeline
Managing resources and allocating tasks
Conducting risk assessments and implementing mitigation strategies
Monitoring project progress and providing regula...
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
Electrical and electronics
Bajaj Electricals interview questions for designations
I applied via Company Website and was interviewed in Aug 2021. There were 4 interview rounds.
A two-phase motor is an electrical motor that operates with two alternating currents, providing improved torque and power output.
Two-phase motors have two windings that are 90 degrees out of phase with each other.
They are commonly used in applications that require high starting torque, such as air conditioners and refrigerators.
Two-phase motors can be either synchronous or induction motors.
They are more efficient and p...
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 5 interview rounds.
It depends on the job requirements and personal preferences.
On-role employees are permanent employees of the company and receive benefits such as health insurance, paid time off, and retirement plans.
Off-role employees are temporary or contract workers who do not receive benefits and are not guaranteed job security.
Some companies prefer to hire off-role employees for short-term projects or to fill in for permanent empl...
Top trending discussions
I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.
The neutral wire and grounding serve different purposes in electrical systems.
The neutral wire carries current back to the source in a balanced electrical circuit.
Grounding provides a path for electrical faults to safely discharge into the ground.
Neutral wire is typically connected to the center tap of a transformer, while grounding is connected to the earth.
Neutral wire is part of the normal current-carrying circuit, ...
Wire current capacity can be calculated using the wire gauge and the maximum current rating of the wire.
Determine the wire gauge
Refer to the maximum current rating chart for the wire gauge
Consider the length of the wire and the ambient temperature
Use the appropriate formula to calculate the current capacity
The electrical power in my area is provided by XYZ Power Company.
XYZ Power Company is the main provider of electrical power in my area.
They have been providing reliable power supply for many years.
Their customer service is also very responsive and helpful.
Other smaller companies also provide power in some areas, but XYZ is the most prominent one.
To troubleshoot a transformer, check for physical damage, measure voltage and current, and test insulation resistance.
Inspect for any physical damage or loose connections
Measure the voltage and current on both the primary and secondary sides
Test the insulation resistance using a megohmmeter
Check for any abnormal noises or overheating
Verify that the transformer is properly grounded
Compare the measured values with the ma
I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
I was interviewed before May 2023.
based on 4 interviews
1 Interview rounds
based on 58 reviews
Rating in categories
Assistant Manager
270
salaries
| ₹0 L/yr - ₹0 L/yr |
Trade Sales Manager
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
214
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
198
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
181
salaries
| ₹0 L/yr - ₹0 L/yr |
Havells
Crompton Greaves Consumer Electricals
V-Guard Industries
Symphony