i
Bajaj Electricals
Filter interviews by
Battery PM work involves routine maintenance tasks to ensure the proper functioning and longevity of batteries.
Performing regular inspections to check for signs of corrosion or damage
Cleaning battery terminals to prevent buildup of dirt and grime
Testing battery voltage and capacity to ensure optimal performance
Replacing batteries as needed based on manufacturer recommendations
Implementing a preventive maintenance sched
I applied via AmbitionBox and was interviewed in Mar 2023. There were 5 interview rounds.
This my first time so no idea
Group discussion i know about
I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.
There are several types of maintenance in electrical engineering, including preventive, corrective, predictive, and shutdown maintenance.
Preventive maintenance involves regularly scheduled inspections, cleaning, and replacement of components to prevent breakdowns.
Corrective maintenance is performed to fix equipment or systems that have failed or are not functioning properly.
Predictive maintenance uses data analysis and...
Bajaj Electricals interview questions for designations
Top trending discussions
posted on 7 Apr 2023
I applied via Company Website and was interviewed in Mar 2023. There were 3 interview rounds.
A case study is an in-depth study of one person, group, or event. In a case study, nearly every aspect of the subject's life and history is analyzed to seek patterns and causes of behavior. Case studies can be used in various fields, including psychology, medicine, education, anthropology, political science, and social work.
I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
I was interviewed before May 2023.
I applied via Apna Jobs and was interviewed in Mar 2022. There were 3 interview rounds.
I will immediately investigate the cause of the NG lot and work with the team to find a solution to make it usable.
Investigate the cause of the NG lot
Work with the team to find a solution
Prioritize urgent use of the lot
Ensure quality control measures are in place
Communicate with stakeholders about the situation
based on 3 interviews
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
270
salaries
| ₹0 L/yr - ₹0 L/yr |
Trade Sales Manager
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
214
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
198
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
181
salaries
| ₹0 L/yr - ₹0 L/yr |
Havells
Crompton Greaves Consumer Electricals
V-Guard Industries
Symphony