Filter interviews by
Basic maths and reasoning questions.
Larsen and Toubro is a renowned multinational conglomerate known for its diverse portfolio and strong reputation in the industry.
L&T has a strong track record of delivering high-quality projects on time and within budget.
The company has a wide range of capabilities across various sectors such as engineering, construction, technology, and financial services.
L&T is known for its commitment to innovation, sustainability, ...
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
Erection involves assembling and installing structural components, while foundation refers to the base on which a structure is built.
Erection involves the process of lifting, placing, and securing structural components like beams, columns, and trusses.
Foundation is the base on which a structure rests, providing stability and support for the entire building.
Erection requires careful planning, coordination, and skilled l...
To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing o...
The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.
Carpet area is the actual area where you can lay a carpet.
Built-up area includes the carpet area plus the thickness of the walls.
Carpet area is usually around 70-80% of the built-up area.
For example, if the built-up area is 1000 square feet, the carpet area
I applied via Campus Placement and was interviewed in Dec 2024. There was 1 interview round.
L&T Construction interview questions for popular designations
I applied via Walk-in and was interviewed in Dec 2024. There was 1 interview round.
Get interview-ready with Top L&T Construction Interview Questions
Tower erection is the process of installing communication towers, wind turbines, and other structures that require tall, sturdy support. It is a complex and technical process that requires specialized knowledge, equipment, and skills to ensure safe and reliable outcomes.
Tower erection refers to the process of assembling and installing a tower structure, typically for telecommunications or power transmission purposes.
Tower erection involves the assembly of tower sections on the ground before lifting and securing them into place.
Specialized equipment such as cranes or helicopters may be used to lift and position the tower sections.
Proper safety measures must be followed during tower ere...
Foundation refers to the lowest load-bearing part of a building, typically below ground level.
Foundation provides support for the structure above it
It distributes the weight of the building to the ground
Foundations can be made of concrete, stone, or other materials
Types of foundations include shallow foundations and deep foundations
Tower erection is the process of assembling and installing the structural components of a tower, typically for telecommunications or wind energy purposes.
Tower erection involves carefully lifting and placing sections of the tower using cranes or other heavy equipment.
Workers must ensure that each section is securely connected to the previous one to maintain structural integrity.
Safety precautions, such as harnesses and...
Tower Foundation is a type of foundation used to support tall structures such as towers and skyscrapers.
Tower Foundation is designed to distribute the weight of the structure evenly to the ground.
It typically consists of a large concrete base or footing that extends deep into the ground.
Reinforcement bars are often used to strengthen the foundation and prevent cracking.
Examples of Tower Foundation include the foundatio...
Aggregates formula details for inventory management
Aggregates formula is used to calculate the total quantity of items in stock
It involves adding up the quantities of each item in inventory
Formula: Total quantity = Quantity of item 1 + Quantity of item 2 + ... + Quantity of item n
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
Just normal aptitude tests on their own portal.
I am a recent graduate with a degree in Business Administration and a passion for marketing and project management.
Recent graduate with a degree in Business Administration
Passionate about marketing and project management
Strong communication and organizational skills
Experience in internships and extracurricular activities
I have worked on various projects including developing a mobile app for tracking fitness goals and creating a data analysis tool for market research.
Developed a mobile app using React Native to track fitness goals and provide personalized workout plans
Created a data analysis tool in Python to analyze market trends and customer behavior
Collaborated with a team of designers and developers to implement new features and im
The location is at XYZ Power Plant and the project name is Upgrade of Electrical Systems.
Location: XYZ Power Plant
Project Name: Upgrade of Electrical Systems
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
Design optimization can be achieved through various methods such as simulation, iteration, and utilization of advanced tools.
Utilize simulation software to test different design scenarios and identify the most optimal solution
Iterate on the design by making incremental changes and evaluating the impact on performance
Use advanced tools like finite element analysis (FEA) or computational fluid dynamics (CFD) for detailed...
Expectations for monetary benefits should align with industry standards and reflect the level of responsibility and experience required for the Senior Manager role.
Monetary benefits should be competitive with market rates for Senior Manager positions.
Consider additional perks such as bonuses, stock options, or benefits packages.
Negotiate for salary increases based on performance and achievements.
Ensure transparency and...
Top trending discussions
The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 846 interviews
Interview experience
based on 6k reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
703
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
504
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
393
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineering Manager
323
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA