To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing o...
The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.
Carpet area is the actual area where you can lay a carpet.
Built-up area includes the carpet area plus the thickness of the walls.
Carpet area is usually around 70-80% of the built-up area.
For example, if the built-up area is 1000 square feet, the carpet area
posted on 11 May 2018
I appeared for an interview before Mar 2020.
posted on 10 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Piping code and welder qualifications test
Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.
Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.
Both piping code and welder qualifications test are important in ensu...
posted on 27 Apr 2022
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 8 Aug 2022
I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.
posted on 12 Jul 2022
I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.
Computer aptitude test
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
posted on 12 Jul 2021
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
643
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
489
salaries
| ₹5.4 L/yr - ₹17 L/yr |
Civil Site Engineer
385
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
328
salaries
| ₹6 L/yr - ₹17 L/yr |
Larsen & Toubro Limited
Dilip Buildcon
Simplex Infrastructures
Power Mech Projects