Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Interview Questions, Process, and Tips

Updated 4 Mar 2025

Top L&T Construction Interview Questions and Answers

View all 573 questions

L&T Construction Interview Experiences

Popular Designations

744 interviews found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 26 Sep 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Activity 

(2 Questions)

  • Q1. Which are the different types of slabs
  • Ans. 

    Different types of slabs include one-way slab, two-way slab, flat slab, ribbed slab, waffle slab, and hollow core slab.

    • One-way slab: supported on two opposite sides and bends in only one direction

    • Two-way slab: supported on all four sides and bends in two directions

    • Flat slab: without beams and supported directly on columns

    • Ribbed slab: with ribs on the underside for added strength and reduced weight

    • Waffle slab: with grid...

  • Answered by AI
  • Q2. What are the different types of slabs foundation
  • Ans. 

    Different types of slabs foundation include raft, mat, flat plate, and waffle slab foundations.

    • Raft foundation: a solid reinforced concrete slab that covers the entire area under a building

    • Mat foundation: a thick concrete slab used to support heavy structures or buildings

    • Flat plate foundation: a simple and economical type of foundation with a uniform thickness

    • Waffle slab foundation: a type of foundation with grid-like

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer

Top L&T Construction Site Engineer Interview Questions and Answers

Q1. 1.) Slump test procedure 2) Tbm 3) how to calculate the wt of steel 4) about site supervision Dpr Dwr And BBS of structure 5) how to calculate concrete quantity of container wall 6) about pipe line
View answer (4)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

Planning Manager Interview Questions & Answers

user image Pagidi Marri Yaswanth Kumar

posted on 11 Sep 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

Mix of Maths and English of basics

Round 2 - Group Discussion 

Group discussion on general topic

Round 3 - One-on-one 

(2 Questions)

  • Q1. About your self
  • Q2. Some technical questions on academics and experience and projects undergone

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)
L&T Construction Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Technical 

(2 Questions)

  • Q1. How you are selected the parson for abroad,, because I am asking,, a lot of accident ,, but L& T was not take any action against, why because that parson of south chainal,, or relatives,
  • Q2. Only you are selected, chainal, and relatives,, everywhere all of you following a lot of safety,, no body hearms, not injured, no fatality,,,but in india or abroad,, a lot of people was died in only L&T,

Interview Preparation Tips

Interview preparation tips for other job seekers - 2012,, and 2022 I was working in L&T Oman,

Top L&T Construction Safety Officer Interview Questions and Answers

Q1. What is the definition of safety and how does it relate to hazards?
View answer (1)

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (18)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Face to face interview

Round 2 - Technical 

(5 Questions)

  • Q1. What is the BBS and Survey
  • Ans. 

    BBS stands for Bar Bending Schedule and Survey refers to the process of measuring and mapping an area.

    • BBS is a document that provides details of reinforcement cutting length, type, and bending shape for construction.

    • Survey involves measuring and mapping land to determine boundaries, elevations, and other important information.

    • Both BBS and Survey are crucial in the construction industry to ensure accurate and efficient

  • Answered by AI
  • Q2. What is the estimation
  • Ans. 

    Estimation is the process of calculating the quantities and costs of materials, labor, and equipment required for a construction project.

    • Estimation involves determining the quantities of materials needed for a project.

    • It also includes calculating the labor hours required for the project.

    • Estimation considers the costs of equipment and other resources needed for the project.

    • Estimation helps in creating a budget and timel

  • Answered by AI
  • Q3. What is the soil test
  • Ans. 

    Soil test is a process of analyzing the properties of soil to determine its suitability for construction purposes.

    • Soil tests help in determining the strength, permeability, compaction, and other important properties of soil.

    • Different types of soil tests include sieve analysis, moisture content test, proctor compaction test, etc.

    • Results of soil tests help in designing foundations, pavements, retaining walls, and other s...

  • Answered by AI
  • Q4. What is the RCC
  • Ans. 

    RCC stands for Reinforced Cement Concrete, a composite material made of concrete and steel reinforcement.

    • RCC is a versatile construction material used in buildings, bridges, dams, etc.

    • It combines the compressive strength of concrete with the tensile strength of steel reinforcement.

    • RCC elements include beams, columns, slabs, and foundations.

    • Example: RCC beams are used to support the load of the structure and transfer it...

  • Answered by AI
  • Q5. What is the DPR
  • Ans. 

    DPR stands for Detailed Project Report, which is a comprehensive document that outlines the details of a construction project.

    • DPR includes information on project scope, objectives, cost estimates, timelines, resources, and potential risks.

    • It serves as a roadmap for the project, guiding the engineers and stakeholders throughout the construction process.

    • DPR is crucial for obtaining approvals, funding, and ensuring the su...

  • Answered by AI

Top L&T Construction Civil Site Engineer Interview Questions and Answers

Q1. Minimum used in which grade of concrete
View answer (11)

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

L&T Construction interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (49)

 Civil Site Engineer

 (33)

 Senior Engineer

 (28)

 Civil Engineer

 (25)

 Site Engineer

 (18)

 Assistant Manager

 (14)

 Electrical GET

 (11)

 Engineer Trainee

 (11)

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(6 Questions)

  • Q1. Yas I am working from internet
  • Q2. Yas I am working from mechanical
  • Q3. Yas caming my work
  • Q4. Yas caming my work done
  • Q5. 4 year warking for the way to the job
  • Q6. Koodankulam in the way to the other

Interview Preparation Tips

Interview preparation tips for other job seekers - Yas

Mechanical Supervisor Interview Questions asked at other Companies

Q1. What you will do if any person injured inside confine space?
View answer (2)

Get interview-ready with Top L&T Construction Interview Questions

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Jobs experience
  • Q2. Minimum 4 to 5 year's

Civil Supervisor Interview Questions asked at other Companies

Q1. 1=Derivation of D²/162. 2=nominal mix 3=design mix 4=per tonne binding wire 5=water cement ratio 6=recent experience or responsibility.
View answer (1)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Whats is a Safety policy
  • Q2. What is a safety
  • Q3. A safety policy is a set of rules and procedures that an organization has in place to protect people from harm

Top L&T Construction Safety Officer Interview Questions and Answers

Q1. What is the definition of safety and how does it relate to hazards?
View answer (1)

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (18)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is a LDO ?
  • Ans. 

    LDO stands for Low Dropout Regulator, a type of linear voltage regulator that operates with a very small voltage difference between the input and output.

    • LDOs are commonly used in electronic devices to provide a stable output voltage despite fluctuations in the input voltage.

    • They are known for their low dropout voltage, which is the minimum voltage required for the LDO to operate properly.

    • LDOs are often used in battery-...

  • Answered by AI
  • Q2. MOSFET selection criteria?
  • Ans. 

    MOSFET selection criteria include voltage rating, current rating, switching speed, and thermal resistance.

    • Consider voltage rating to ensure it can handle the required voltage levels

    • Look at current rating to ensure it can handle the required current levels

    • Check switching speed for the desired performance

    • Consider thermal resistance to prevent overheating

  • Answered by AI

Hardware Design Engineer Interview Questions asked at other Companies

Q1. What does a capacitor do? How do you decide what capacitors (You'll have to tell them why did you choose, what you choose), Other than this I was asked to draw basic Electronic Schematics for Analog circuits using resistors, diodes, inducto... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Which material use in construction?
  • Ans. 

    Various materials are used in construction including concrete, steel, wood, brick, and asphalt.

    • Concrete is commonly used for foundations, walls, and floors

    • Steel is used for structural frames and reinforcement

    • Wood is used for framing, flooring, and finishing

    • Brick is used for walls and facades

    • Asphalt is used for roads and pavements

  • Answered by AI
  • Q2. What are the temprature of concrete?
  • Ans. 

    The temperature of concrete can vary depending on factors such as the mix design, curing conditions, and ambient temperature.

    • The temperature of freshly mixed concrete is typically between 50-75 degrees Fahrenheit.

    • During curing, the concrete temperature should be maintained above 50 degrees Fahrenheit for proper hydration.

    • Extreme temperatures, either too hot or too cold, can affect the strength and durability of concret...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Site Engineer interview:
  • Construction Engineering
Interview preparation tips for other job seekers - Good technical skill, and computer knowledge,etc

Top L&T Construction Civil Site Engineer Interview Questions and Answers

Q1. Minimum used in which grade of concrete
View answer (11)

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Mech engineering
  • Q2. All about rotatory parts

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with all preparation

Top L&T Construction Construction Management Interview Questions and Answers

Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
View answer (2)

Construction Management Interview Questions asked at other Companies

Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
View answer (2)
Contribute & help others!
anonymous
You can choose to be anonymous

L&T Construction Interview FAQs

How many rounds are there in L&T Construction interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction interview?

Some of the top questions asked at the L&T Construction interview -

  1. What will be the cost of painting the wall behind ...read more
  2. What do you mean by M25 concre...read more
  3. What are the steps to be followed after receiving the plan of a constructi...read more
How long is the L&T Construction interview process?

The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

SALARIES

Sundaram Clayton

SALARIES

Sundaram Clayton

SALARIES

Brainstorm Infotech

SALARIES

Sundaram Clayton

SALARIES

Brainstorm Infotech

SALARIES

Brainstorm Infotech

INTERVIEWS

DynPro

No Interviews

Tell us how to improve this page.

L&T Construction Interview Process

based on 846 interviews

Interview experience

4.2
  
Good
View more

L&T Construction Reviews and Ratings

based on 6k reviews

4.0/5

Rating in categories

4.0

Skill development

3.4

Work-life balance

3.8

Salary

4.0

Job security

3.7

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 6k Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
703 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
393 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
323 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent