A calculative approach for project planning involves using data and analysis to make informed decisions throughout the project lifecycle.
Utilize project management tools and software to create detailed project plans with timelines, milestones, and resource allocation.
Conduct risk assessments and feasibility studies to identify potential challenges and develop contingency plans.
Regularly monitor and track project progre...
I applied via Referral and was interviewed in Jan 2022. There was 1 interview round.
Construction tolerance for NATM tunneling depends on various factors.
The type of rock or soil being excavated
The size and shape of the tunnel
The depth of the tunnel
The presence of water or other geological features
Typically, a tolerance of +/- 50mm is used for NATM tunneling
However, this can vary depending on the specific project and site conditions
NATM stands for New Austrian Tunneling Method, a principle of tunneling that involves excavation and support in a sequential manner.
Excavation and support are done in a sequential manner
The method is flexible and adaptable to different geological conditions
It involves the use of shotcrete and rock bolts for support
The principle was developed in Austria in the 1950s and has since been used worldwide
Examples of NATM tunn...
Top trending discussions
I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.
Project cost, bbs, agreement clause, critical activities, total float are key aspects of project planning and management.
Project cost refers to the total expenses incurred in completing a project.
BBS (Bill of Quantities) is a document used in construction projects to itemize the materials, parts, and labor required.
Agreement clause outlines the terms and conditions agreed upon by all parties involved in the project.
Cri...
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
The planning initiation process involves defining the project scope, objectives, and deliverables.
Identify the need for planning
Define the project scope, objectives, and deliverables
Identify key stakeholders and their roles
Establish a project team
Develop a project charter or initiation document
Conduct a feasibility study
Identify risks and constraints
Define the planning timeline and milestones
The scheduling process involves considering durations in relation to productivity.
The scheduling process starts by identifying the tasks that need to be completed.
The duration of each task is estimated based on historical data or expert judgment.
Productivity levels are taken into account when determining the duration of tasks.
Factors such as employee skills, equipment availability, and potential bottlenecks are conside...
The productivity norms in planning management vary across industries and sites.
Productivity norms in planning management are specific to each industry and site.
These norms are determined based on factors such as the nature of work, resources available, and industry standards.
For example, in the manufacturing industry, the productivity norm for planning managers may be measured in terms of units produced per hour.
In the...
Trackers are prepared for site tracking and schedule upgradation.
Trackers are tools used to monitor and track progress on a site or project.
They help in keeping track of tasks, deadlines, and milestones.
Trackers can be in the form of spreadsheets, software, or project management tools.
They provide visibility into the status of various activities and help in identifying bottlenecks or delays.
Upgradation of schedules inv...
posted on 10 Jun 2024
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
Primavera P6 and Microsoft Project are commonly used software for scheduling in the field of planning management.
Primavera P6 is a popular software used for project scheduling and management
Microsoft Project is another widely used tool for creating schedules and tracking progress
Other software options include Smartsheet, Asana, and Trello for more collaborative scheduling needs
The sequence of erection of a structure involves planning and organizing the construction process in a logical order.
Start with site preparation and foundation work
Proceed with structural framing and roofing
Followed by exterior finishing and interior work
Finish with landscaping and final touches
Each step must be completed before moving on to the next
posted on 10 May 2024
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
Planning involves setting goals and determining the actions needed to achieve those goals. Different levels of plans include strategic, tactical, and operational plans.
Planning is the process of setting goals and determining the actions needed to achieve those goals.
Different levels of plans include strategic plans, which are long-term and set the overall direction of the organization.
Tactical plans are medium-term pla...
posted on 29 Dec 2021
I applied via Naukri.com
Yes, I am able to prepare budgets.
I have experience in preparing budgets for various projects and departments.
I am proficient in using budgeting software and tools.
I have a strong understanding of financial statements and forecasting.
I am able to work closely with stakeholders to gather necessary information and make informed budget decisions.
Different manpowers have different outputs depending on their skills and expertise.
Output of a planning manager includes strategic plans and project timelines.
Output of a marketing manager includes marketing campaigns and sales strategies.
Output of a software developer includes code and software applications.
Output of a customer service representative includes customer satisfaction and issue resolution.
Output of a grap...
MIS reports should consider data accuracy, relevance, timeliness, and presentation.
Accuracy of data
Relevance of data to the report's purpose
Timeliness of data
Clear and concise presentation of data
Consistency in data formatting
Identification of trends and patterns in data
Comparison of current data with historical data
Inclusion of key performance indicators (KPIs)
posted on 1 Dec 2022
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Nov 2022. There were 3 interview rounds.
based on 27 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
856
salaries
| ₹3 L/yr - ₹12.2 L/yr |
Assistant Construction Manager
526
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Assistant Engineering Manager
322
salaries
| ₹6 L/yr - ₹17 L/yr |
Civil Site Engineer
320
salaries
| ₹1.2 L/yr - ₹7.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA