I applied via Referral and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How much Construction tolerance for NATM tunneling
  • Ans. 

    Construction tolerance for NATM tunneling depends on various factors.

    • The type of rock or soil being excavated

    • The size and shape of the tunnel

    • The depth of the tunnel

    • The presence of water or other geological features

    • Typically, a tolerance of +/- 50mm is used for NATM tunneling

    • However, this can vary depending on the specific project and site conditions

  • Answered by AI
  • Q2. Principle of NATM tunneling
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a principle of tunneling that involves excavation and support in a sequential manner.

    • Excavation and support are done in a sequential manner

    • The method is flexible and adaptable to different geological conditions

    • It involves the use of shotcrete and rock bolts for support

    • The principle was developed in Austria in the 1950s and has since been used worldwide

    • Examples of NATM tunn...

  • Answered by AI
  • Q3. About Major material reconciliation

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare before interview with Past experience work carried out during your services with indivdual role.

Planning Manager Interview Questions & Answers

user image Pagidi Marri Yaswanth Kumar

posted on 11 Sep 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

Mix of Maths and English of basics

Round 2 - Group Discussion 

Group discussion on general topic

Round 3 - One-on-one 

(2 Questions)

  • Q1. About your self
  • Q2. Some technical questions on academics and experience and projects undergone

Planning Manager Interview Questions Asked at Other Companies

Q1. Plan vs progress percentage having negative variance, but updated ... read more
Q2. What is your project cost, bbs, agreement clause, critical activi ... read more
Q3. What do you understand by planning & different level of plans ... read more
Q4. How to prepare EPC Contract bill and Turnkey Contract bill
Q5. What are the output of different Manpowers ?
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Jun 2023.

Round 1 - Technical 

(1 Question)

  • Q1. Calculative Approach for Project Planning. Adoptive process, etc
  • Ans. 

    A calculative approach for project planning involves using data and analysis to make informed decisions throughout the project lifecycle.

    • Utilize project management tools and software to create detailed project plans with timelines, milestones, and resource allocation.

    • Conduct risk assessments and feasibility studies to identify potential challenges and develop contingency plans.

    • Regularly monitor and track project progre...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Take home salary etc

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Current salary , total experience
  • Ans. 12 lack CTC & 9 years of experience
  • Answered Anonymously
Round 2 - Technical 

(2 Questions)

  • Q1. What is your project cost, bbs, agreement clause, critical activities, total float
  • Ans. 

    Project cost, bbs, agreement clause, critical activities, total float are key aspects of project planning and management.

    • Project cost refers to the total expenses incurred in completing a project.

    • BBS (Bill of Quantities) is a document used in construction projects to itemize the materials, parts, and labor required.

    • Agreement clause outlines the terms and conditions agreed upon by all parties involved in the project.

    • Cri...

  • Answered by AI
  • Q2. All questions asked and answered professionally

Interview Preparation Tips

Topics to prepare for G R Infraprojects Planning Manager interview:
  • Primavera Project Planner
  • Agreements
  • Bbs
  • Quality
Interview preparation tips for other job seekers - Be cool, check the turnover of the company and study for the project for which you are applying for.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Planning inititation process.
  • Ans. 

    The planning initiation process involves defining the project scope, objectives, and deliverables.

    • Identify the need for planning

    • Define the project scope, objectives, and deliverables

    • Identify key stakeholders and their roles

    • Establish a project team

    • Develop a project charter or initiation document

    • Conduct a feasibility study

    • Identify risks and constraints

    • Define the planning timeline and milestones

  • Answered by AI
  • Q2. Scheduling process and details for consodering durations with reapect to productivity.
  • Ans. 

    The scheduling process involves considering durations in relation to productivity.

    • The scheduling process starts by identifying the tasks that need to be completed.

    • The duration of each task is estimated based on historical data or expert judgment.

    • Productivity levels are taken into account when determining the duration of tasks.

    • Factors such as employee skills, equipment availability, and potential bottlenecks are conside...

  • Answered by AI
  • Q3. General productivity norms Vs actual industry consoderation as per site.
  • Ans. 

    The productivity norms in planning management vary across industries and sites.

    • Productivity norms in planning management are specific to each industry and site.

    • These norms are determined based on factors such as the nature of work, resources available, and industry standards.

    • For example, in the manufacturing industry, the productivity norm for planning managers may be measured in terms of units produced per hour.

    • In the...

  • Answered by AI
  • Q4. Budgeting details - Direct and indirect cost
  • Q5. Trackers prepared for site tracking, schedule upgradation
  • Ans. 

    Trackers are prepared for site tracking and schedule upgradation.

    • Trackers are tools used to monitor and track progress on a site or project.

    • They help in keeping track of tasks, deadlines, and milestones.

    • Trackers can be in the form of spreadsheets, software, or project management tools.

    • They provide visibility into the status of various activities and help in identifying bottlenecks or delays.

    • Upgradation of schedules inv...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary as explained by team members is not on time, 1 month salary will be credited in 45-60 days of every passed month.
Timings are not worthy as they have strict timings of 9:30 to 9:45 after that they will consider half day for the current day and salary will be deducted.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. About Scheduling
  • Q2. Software used for scheduling
  • Ans. 

    Primavera P6 and Microsoft Project are commonly used software for scheduling in the field of planning management.

    • Primavera P6 is a popular software used for project scheduling and management

    • Microsoft Project is another widely used tool for creating schedules and tracking progress

    • Other software options include Smartsheet, Asana, and Trello for more collaborative scheduling needs

  • Answered by AI
  • Q3. Sequence of Erection of Structure
  • Ans. 

    The sequence of erection of a structure involves planning and organizing the construction process in a logical order.

    • Start with site preparation and foundation work

    • Proceed with structural framing and roofing

    • Followed by exterior finishing and interior work

    • Finish with landscaping and final touches

    • Each step must be completed before moving on to the next

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Please introduce yourself
  • Q2. About your job experience
  • Q3. What do you understand by planning & different level of plans.
  • Ans. 

    Planning involves setting goals and determining the actions needed to achieve those goals. Different levels of plans include strategic, tactical, and operational plans.

    • Planning is the process of setting goals and determining the actions needed to achieve those goals.

    • Different levels of plans include strategic plans, which are long-term and set the overall direction of the organization.

    • Tactical plans are medium-term pla...

  • Answered by AI
  • Q4. Project specific questions
  • Q5. How early can you join us

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a browse through your experience mentioned on cv. Learn about company & it's past & recent projects

I applied via Naukri.com

Interview Questionnaire 

3 Questions

  • Q1. Are you able to prepare Budget ?
  • Ans. 

    Yes, I am able to prepare budgets.

    • I have experience in preparing budgets for various projects and departments.

    • I am proficient in using budgeting software and tools.

    • I have a strong understanding of financial statements and forecasting.

    • I am able to work closely with stakeholders to gather necessary information and make informed budget decisions.

  • Answered by AI
  • Q2. What are the output of different Manpowers ?
  • Ans. 

    Different manpowers have different outputs depending on their skills and expertise.

    • Output of a planning manager includes strategic plans and project timelines.

    • Output of a marketing manager includes marketing campaigns and sales strategies.

    • Output of a software developer includes code and software applications.

    • Output of a customer service representative includes customer satisfaction and issue resolution.

    • Output of a grap...

  • Answered by AI
  • Q3. What things are to be considered in MIS report ?
  • Ans. 

    MIS reports should consider data accuracy, relevance, timeliness, and presentation.

    • Accuracy of data

    • Relevance of data to the report's purpose

    • Timeliness of data

    • Clear and concise presentation of data

    • Consistency in data formatting

    • Identification of trends and patterns in data

    • Comparison of current data with historical data

    • Inclusion of key performance indicators (KPIs)

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be genuine and answer the questions. Its okay if your not able to answer, not every one knows everything

I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How many years of experience you have? What is your responsibilities.
  • Q2. Which kind of projects have you done?

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your mind cool. Everything will be depending on your talent.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Salary negotiation
Round 3 - Behavioral 

(2 Questions)

  • Q1. General discussion
  • Q2. Work methodology

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Planning Manager interview?
L&T Construction interview process usually has 2 rounds. The most common rounds in the L&T Construction interview process are Technical, HR and Aptitude Test.
What are the top questions asked in L&T Construction Planning Manager interview?

Some of the top questions asked at the L&T Construction Planning Manager interview -

  1. How much Construction tolerance for NATM tunnel...read more
  2. Calculative Approach for Project Planning. Adoptive process, ...read more
  3. Principle of NATM tunnel...read more

Tell us how to improve this page.

People are getting interviews through

based on 2 L&T Construction interviews
Referral
Campus Placement
50%
50%
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates
L&T Construction Planning Manager Salary
based on 109 salaries
₹9.8 L/yr - ₹35.3 L/yr
28% more than the average Planning Manager Salary in India
View more details

L&T Construction Planning Manager Reviews and Ratings

based on 27 reviews

4.1/5

Rating in categories

4.0

Skill development

2.6

Work-Life balance

3.6

Salary & Benefits

4.6

Job Security

3.6

Company culture

3.6

Promotions/Appraisal

3.4

Work Satisfaction

Explore 27 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
856 salaries
unlock blur

₹3 L/yr - ₹12.2 L/yr

Assistant Construction Manager
526 salaries
unlock blur

₹5.4 L/yr - ₹17.5 L/yr

Assistant Engineering Manager
321 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Civil Site Engineer
320 salaries
unlock blur

₹1.2 L/yr - ₹7.5 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview