Upload Button Icon Add office photos

Dilip Buildcon

Compare button icon Compare button icon Compare

Filter interviews by

Dilip Buildcon Planning Manager Interview Questions, Process, and Tips

Updated 9 Dec 2023

Dilip Buildcon Planning Manager Interview Experiences

1 interview found

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Planning inititation process.
  • Ans. 

    The planning initiation process involves defining the project scope, objectives, and deliverables.

    • Identify the need for planning

    • Define the project scope, objectives, and deliverables

    • Identify key stakeholders and their roles

    • Establish a project team

    • Develop a project charter or initiation document

    • Conduct a feasibility study

    • Identify risks and constraints

    • Define the planning timeline and milestones

  • Answered by AI
  • Q2. Scheduling process and details for consodering durations with reapect to productivity.
  • Ans. 

    The scheduling process involves considering durations in relation to productivity.

    • The scheduling process starts by identifying the tasks that need to be completed.

    • The duration of each task is estimated based on historical data or expert judgment.

    • Productivity levels are taken into account when determining the duration of tasks.

    • Factors such as employee skills, equipment availability, and potential bottlenecks are conside...

  • Answered by AI
  • Q3. General productivity norms Vs actual industry consoderation as per site.
  • Ans. 

    The productivity norms in planning management vary across industries and sites.

    • Productivity norms in planning management are specific to each industry and site.

    • These norms are determined based on factors such as the nature of work, resources available, and industry standards.

    • For example, in the manufacturing industry, the productivity norm for planning managers may be measured in terms of units produced per hour.

    • In the...

  • Answered by AI
  • Q4. Budgeting details - Direct and indirect cost
  • Q5. Trackers prepared for site tracking, schedule upgradation
  • Ans. 

    Trackers are prepared for site tracking and schedule upgradation.

    • Trackers are tools used to monitor and track progress on a site or project.

    • They help in keeping track of tasks, deadlines, and milestones.

    • Trackers can be in the form of spreadsheets, software, or project management tools.

    • They provide visibility into the status of various activities and help in identifying bottlenecks or delays.

    • Upgradation of schedules inv...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary as explained by team members is not on time, 1 month salary will be credited in 45-60 days of every passed month.
Timings are not worthy as they have strict timings of 9:30 to 9:45 after that they will consider half day for the current day and salary will be deducted.

Interview questions from similar companies

Interview Questionnaire 

3 Questions

  • Q1. Coke oven and blast furnace technical lining questions
  • Q2. Site management cost control
  • Q3. How to Time saving
  • Ans. 

    Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.

    • Optimize processes to eliminate inefficiencies and reduce wasted time

    • Utilize technology tools to automate repetitive tasks and streamline workflows

    • Delegate tasks to team members to distribute workload and free up time for higher priority tasks

    • Set clear priorities and focus on important tasks to avoid wasting

  • Answered by AI

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Pump house and Building
  • Q2. Road and pipe line work and Bridge

Interview Preparation Tips

Interview preparation tips for other job seekers - Navayaga engineering company Ltd

I appeared for an interview in Aug 2019.

Interview Questionnaire 

4 Questions

  • Q1. How many types of structure
  • Ans. 

    There are various types of structures, including buildings, bridges, dams, tunnels, and towers.

    • Structures can be classified based on their purpose, design, and materials used.

    • Buildings can be further classified into residential, commercial, and industrial structures.

    • Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.

    • Dams can be classified into gravity, arch, buttress, and embankment dams.

    • Tu...

  • Answered by AI
  • Q2. What is density
  • Ans. 

    Density is the measure of mass per unit volume of a substance.

    • It is a physical property of matter.

    • It is calculated by dividing the mass of a substance by its volume.

    • Units of density include kg/m³, g/cm³, and lb/ft³.

    • Density can be used to identify substances and determine their purity.

    • For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.

  • Answered by AI
  • Q3. How many types of density construction
  • Ans. 

    There are two types of density construction: compacted and loose.

    • Compacted density construction involves compressing the material to increase its density, such as in road construction.

    • Loose density construction involves leaving the material in its natural state, such as in landscaping.

    • The type of density construction used depends on the intended use of the material and the desired level of compaction.

    • Other factors that...

  • Answered by AI
  • Q4. Which types of tests construction joint
  • Ans. 

    Tests for construction joints include visual inspection, water tightness test, and load transfer test.

    • Visual inspection to check for proper joint alignment and sealant application

    • Water tightness test to ensure no water leakage through the joint

    • Load transfer test to verify the joint can handle the intended load

    • Other tests may include pull-out test, shear test, and compression test

    • Testing frequency and methods may vary d...

  • Answered by AI

Skills evaluated in this interview

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Sanik school G+2 , Quantity survey, estimation and costing

Round 3 - Technical 

(1 Question)

  • Q1. Estimation and costing,Bar Bending schedule, Quantity surveyor

I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Tell me about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil Engineer
For interview

Interview Questionnaire 

1 Question

  • Q1. What are the check for starting excavation work.
  • Ans. 

    Checklist for starting excavation work

    • Obtain necessary permits and approvals

    • Ensure proper marking and surveying of excavation area

    • Identify and mark underground utilities

    • Ensure proper safety measures are in place

    • Inspect excavation equipment and tools

    • Ensure proper disposal of excavated materials

    • Monitor weather conditions

    • Ensure proper communication and coordination with stakeholders

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, discipline, always on time, ready to move other location.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Execution department questions
  • Q2. Pipe laying questions
  • Q3. Joining questions
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. All ques related to your work in current company
  • Q2. About Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Give interview with confidence and be aware for salary negotiation

Dilip Buildcon Interview FAQs

How many rounds are there in Dilip Buildcon Planning Manager interview?
Dilip Buildcon interview process usually has 2 rounds. The most common rounds in the Dilip Buildcon interview process are Resume Shortlist and Technical.
How to prepare for Dilip Buildcon Planning Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dilip Buildcon. The most common topics and skills that interviewers at Dilip Buildcon expect are Monitoring, Planning, Bidding, Billing and Budgeting.
What are the top questions asked in Dilip Buildcon Planning Manager interview?

Some of the top questions asked at the Dilip Buildcon Planning Manager interview -

  1. Scheduling process and details for consodering durations with reapect to produc...read more
  2. General productivity norms Vs actual industry consoderation as per si...read more
  3. Trackers prepared for site tracking, schedule upgradat...read more

Tell us how to improve this page.

Dilip Buildcon Planning Manager Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Fast track your campus placements

View all
Dilip Buildcon Planning Manager Salary
based on 14 salaries
₹10 L/yr - ₹20 L/yr
26% less than the average Planning Manager Salary in India
View more details

Dilip Buildcon Planning Manager Reviews and Ratings

based on 7 reviews

3.6/5

Rating in categories

2.9

Skill development

2.9

Work-life balance

3.4

Salary

2.6

Job security

3.4

Company culture

2.9

Promotions

3.5

Work satisfaction

Explore 7 Reviews and Ratings
Senior Engineer
212 salaries
unlock blur

₹4 L/yr - ₹10.9 L/yr

Assistant Manager
201 salaries
unlock blur

₹4 L/yr - ₹10.5 L/yr

Asst Store
201 salaries
unlock blur

₹1.6 L/yr - ₹4 L/yr

Store Executive
192 salaries
unlock blur

₹2.2 L/yr - ₹5.2 L/yr

Structural Engineer
179 salaries
unlock blur

₹2 L/yr - ₹6.7 L/yr

Explore more salaries
Compare Dilip Buildcon with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview