I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
The planning initiation process involves defining the project scope, objectives, and deliverables.
Identify the need for planning
Define the project scope, objectives, and deliverables
Identify key stakeholders and their roles
Establish a project team
Develop a project charter or initiation document
Conduct a feasibility study
Identify risks and constraints
Define the planning timeline and milestones
The scheduling process involves considering durations in relation to productivity.
The scheduling process starts by identifying the tasks that need to be completed.
The duration of each task is estimated based on historical data or expert judgment.
Productivity levels are taken into account when determining the duration of tasks.
Factors such as employee skills, equipment availability, and potential bottlenecks are conside...
The productivity norms in planning management vary across industries and sites.
Productivity norms in planning management are specific to each industry and site.
These norms are determined based on factors such as the nature of work, resources available, and industry standards.
For example, in the manufacturing industry, the productivity norm for planning managers may be measured in terms of units produced per hour.
In the...
Trackers are prepared for site tracking and schedule upgradation.
Trackers are tools used to monitor and track progress on a site or project.
They help in keeping track of tasks, deadlines, and milestones.
Trackers can be in the form of spreadsheets, software, or project management tools.
They provide visibility into the status of various activities and help in identifying bottlenecks or delays.
Upgradation of schedules inv...
Top trending discussions
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
posted on 2 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I appeared for an interview in Aug 2019.
There are various types of structures, including buildings, bridges, dams, tunnels, and towers.
Structures can be classified based on their purpose, design, and materials used.
Buildings can be further classified into residential, commercial, and industrial structures.
Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.
Dams can be classified into gravity, arch, buttress, and embankment dams.
Tu...
Density is the measure of mass per unit volume of a substance.
It is a physical property of matter.
It is calculated by dividing the mass of a substance by its volume.
Units of density include kg/m³, g/cm³, and lb/ft³.
Density can be used to identify substances and determine their purity.
For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.
There are two types of density construction: compacted and loose.
Compacted density construction involves compressing the material to increase its density, such as in road construction.
Loose density construction involves leaving the material in its natural state, such as in landscaping.
The type of density construction used depends on the intended use of the material and the desired level of compaction.
Other factors that...
Tests for construction joints include visual inspection, water tightness test, and load transfer test.
Visual inspection to check for proper joint alignment and sealant application
Water tightness test to ensure no water leakage through the joint
Load transfer test to verify the joint can handle the intended load
Other tests may include pull-out test, shear test, and compression test
Testing frequency and methods may vary d...
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Core is the central part of a structure or object that provides strength and stability.
Core is commonly used in construction and engineering.
It is the central part of a building or structure that provides support and stability.
In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.
Examples of core materials include concrete, steel, and wood.
A strong core is important for maintain
I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.
Sanik school G+2 , Quantity survey, estimation and costing
posted on 1 Sep 2021
I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.
posted on 5 Jan 2022
Checklist for starting excavation work
Obtain necessary permits and approvals
Ensure proper marking and surveying of excavation area
Identify and mark underground utilities
Ensure proper safety measures are in place
Inspect excavation equipment and tools
Ensure proper disposal of excavated materials
Monitor weather conditions
Ensure proper communication and coordination with stakeholders
posted on 11 Jan 2024
I applied via AmbitionBox and was interviewed before Jan 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
Some of the top questions asked at the Dilip Buildcon Planning Manager interview -
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Senior Engineer
212
salaries
| ₹4 L/yr - ₹10.9 L/yr |
Assistant Manager
201
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Asst Store
201
salaries
| ₹1.6 L/yr - ₹4 L/yr |
Store Executive
192
salaries
| ₹2.2 L/yr - ₹5.2 L/yr |
Structural Engineer
179
salaries
| ₹2 L/yr - ₹6.7 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures