Round 1 - Technical 

(6 Questions)

  • Q1. Yas I am working from internet
  • Q2. Yas I am working from mechanical
  • Q3. Yas caming my work
  • Q4. Yas caming my work done
  • Q5. 4 year warking for the way to the job
  • Q6. Koodankulam in the way to the other

Interview Preparation Tips

Interview preparation tips for other job seekers - Yas
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. 1.which type of Sling Used Construction Area Ans: Wire Rope Sling
  • Ans. 

    Wire rope slings are commonly used in construction areas for lifting heavy loads.

    • Wire rope slings are made of multiple strands of wire twisted together to form a strong and flexible sling.

    • They are used to lift heavy objects such as steel beams, concrete blocks, and machinery.

    • Wire rope slings are durable and resistant to abrasion, making them suitable for rugged construction environments.

    • They come in various configurati...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Communication skills and don't nervous at Interview room

Mechanical Supervisor Interview Questions Asked at Other Companies

Q1. What you will do if any person injured inside confine space?
Q2. What you will do in emergency alarm in oil and gas company?
Q3. If you are doing work outside somewhere and while working, there ... read more
Q4. The steam turbines rotor it's running time which bearing take loa ... read more
Q5. what should be the approach temperature range for a water-cooled ... read more

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Compound number, clocks, Average, Percentage

Round 3 - Technical 

(3 Questions)

  • Q1. Process, Site engineer
  • Q2. Hard work and smart work
  • Q3. Are you honest man and computer added design

Interview Preparation Tips

Interview preparation tips for other job seekers - I am a mechanical engineer.2 year experience in construction department for site Relience refinery

I applied via Approached by Company and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Type of maintenance of construction machinery.
  • Ans. 

    The types of maintenance for construction machinery include preventive, corrective, and predictive maintenance.

    • Preventive maintenance involves regularly scheduled inspections, cleaning, and servicing to prevent breakdowns and extend the lifespan of the machinery.

    • Corrective maintenance is performed when a machine breaks down or malfunctions, and it involves repairing or replacing faulty components.

    • Predictive maintenance...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Your expected salary.
  • Q2. Is your expeected salary negotiable.
  • Ans. 

    Yes, my expected salary is negotiable.

    • Express willingness to negotiate salary

    • Highlight flexibility in terms of compensation

    • Provide examples of previous successful salary negotiations

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Hindustan Construction Company Mechanical Engineer interview:
  • Maintenance of construction mach
  • Graduate with mechanical engineering
Interview preparation tips for other job seekers - We can count expected salary should be 30% hike from current drawn salary.

I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. MEP Electrical Engineer with over 11 years experience.
  • Q2. If any requirment? Then will contact me

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good knowledge of MEP Project.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. What about power plant
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Mar 2024.

Round 1 - HR 

(1 Question)

  • Q1. What is Pascals low
  • Ans. 

    Pascal's law states that a change in pressure applied to an enclosed fluid is transmitted undiminished to all portions of the fluid and to the walls of its container.

    • Pascal's law is a fundamental principle in fluid mechanics

    • It states that a change in pressure applied to an enclosed fluid is transmitted undiminished throughout the fluid

    • This principle is used in hydraulic systems to generate mechanical force

  • Answered by AI
Round 2 - Aptitude Test 

I am Brahmananda sahoo form Cuttack now joining TATA STEEL

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Electrical maintenance kese kar te ho
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Errection of 11 kv line and detail about material in 1 km line?
  • Ans. 

    The erection of an 11 kV line involves setting up a power line infrastructure for transmitting electricity over a distance of 1 km.

    • Materials required include conductors (such as aluminum or copper), insulators, poles, transformers, and hardware fittings.

    • The conductors are used to carry the electricity from one point to another, while insulators prevent the flow of electricity to the ground.

    • Poles are used to support the...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Privious salay?

Interview Preparation Tips

Interview preparation tips for other job seekers - Go free mind
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What is your experience with high voltage transmission lines?
  • Ans. 

    I have extensive experience working with high voltage transmission lines in various projects.

    • Designed and implemented high voltage transmission lines for power distribution projects

    • Performed maintenance and troubleshooting on existing high voltage transmission lines

    • Ensured compliance with safety regulations and standards for high voltage systems

    • Collaborated with team members and stakeholders to optimize performance and

  • Answered by AI

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Mechanical Supervisor interview?
L&T Construction interview process usually has 1 rounds. The most common rounds in the L&T Construction interview process are One-on-one Round and Technical.
What are the top questions asked in L&T Construction Mechanical Supervisor interview?

Some of the top questions asked at the L&T Construction Mechanical Supervisor interview -

  1. 1.which type of Sling Used Construction Area Ans: Wire Rope Sl...read more
  2. Yas I am working from mechani...read more
  3. 4 year warking for the way to the ...read more

Tell us how to improve this page.

L&T Construction Mechanical Supervisor Interview Process

based on 3 interviews

Interview experience

3.3
  
Average
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 427 Interviews
Dilip Buildcon Interview Questions
4.0
 • 141 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
L&T Construction Mechanical Supervisor Salary
based on 16 salaries
₹1.8 L/yr - ₹6.6 L/yr
43% less than the average Mechanical Supervisor Salary in India
View more details

L&T Construction Mechanical Supervisor Reviews and Ratings

based on 4 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

4.1

Salary

4.1

Job security

5.0

Company culture

4.1

Promotions

5.0

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview