I appeared for an interview in Aug 2024.
Hard but medium not very easy but not so hard
M15 ratio is the mix ratio of cement, sand, and aggregate in construction.
M15 ratio is commonly used in construction for preparing concrete.
It refers to the mix ratio of 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts aggregate.
This ratio is suitable for general construction purposes where high strength is not required.
Initial setting time of rhc is the time taken for the cement paste to lose its plasticity and become rigid.
Initial setting time is typically around 30 minutes for ordinary Portland cement.
It is influenced by factors such as temperature, water-cement ratio, and type of cement used.
Testing for initial setting time is done using the Vicat apparatus.
Stress is the force applied to a material, while strain is the resulting deformation or change in shape.
Stress is the force applied to a material per unit area
Strain is the resulting deformation or change in shape of the material
Stress is measured in units of force per unit area (such as N/m^2 or Pa)
Strain is a dimensionless quantity representing the amount of deformation relative to the original size of the material
Elastic properties refer to the ability of a material to deform under stress and return to its original shape when the stress is removed.
Elastic properties include Young's modulus, shear modulus, and Poisson's ratio.
Young's modulus measures the stiffness of a material in tension or compression.
Shear modulus measures the stiffness of a material in shear.
Poisson's ratio describes the ratio of lateral strain to axial stra...
I applied via Company Website and was interviewed in May 2024.Β There was 1 interview round.
L&T Construction interview questions for popular designations
I applied via Job Fair and was interviewed in Jun 2024.Β There were 2 interview rounds.
Work at height hazards include falls, falling objects, unstable surfaces, and improper use of equipment.
Ensure proper training and use of fall protection equipment
Inspect equipment regularly for wear and tear
Secure tools and materials to prevent falling objects
Avoid working on unstable surfaces or in adverse weather conditions
Work at height of 1.8 meters is considered a significant risk level for falls in the workplace.
Work at height of 1.8 meters is a common threshold for implementing fall protection measures.
At this height, the risk of serious injury or fatality from a fall increases significantly.
Regulations and standards often specify 1.8 meters as the height at which fall protection is required.
Factors such as surface conditions, tasks...
Work at height hazards include falls, falling objects, unstable surfaces. Precautions include proper training, use of fall protection equipment, regular inspections.
Identify potential hazards before starting work at height
Ensure workers are properly trained on safe work practices
Use appropriate fall protection equipment such as harnesses, guardrails, and safety nets
Regularly inspect equipment and work areas for any def...
Lifting hazard refers to the risk of injury or strain when lifting heavy objects or lifting improperly.
Lifting heavy objects without proper technique can lead to back injuries
Repetitive lifting without breaks can cause muscle strain
Not using proper lifting equipment can increase the risk of accidents
Improperly lifting objects that are too heavy for one person to handle
Crane hazard refers to the potential dangers associated with the operation of cranes on a worksite.
Crane collapse due to overloading or improper setup
Striking nearby objects or workers
Electrocution from contact with power lines
Falling objects from the crane
Inadequate training or supervision of crane operators
Get interview-ready with Top L&T Construction Interview Questions
I appeared for an interview in Dec 2024.
Data entry is the process of entering, updating, or maintaining information into a computer system, database, or spreadsheet. It's a fundamental part of data management, ensuring that information is accurate, organized, and accessible.
Maintenance repairs automobile engines by diagnosing issues, replacing faulty parts, and conducting regular maintenance checks.
Diagnosing engine issues through visual inspection and diagnostic tools
Replacing faulty parts such as spark plugs, filters, and belts
Conducting regular maintenance checks to prevent future issues
Testing the engine after repairs to ensure proper functioning
Maintenance Supervisors typically work for manufacturing companies, property management companies, and equipment dealers.
Manufacturing companies
Property management companies
Equipment dealers
I applied via Company Website
Normal SubPar Questions
A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers work on the principle of electromagnetic induction
They have primary and secondary coils wound around a core
Step-up transformers increase voltage while step-down transformers decrease voltage
Efficiency of a transformer is determined by its core material and design
Synchronous motor is a type of AC motor where the rotation of the shaft is synchronized with the frequency of the supply current.
Synchronous motor has a rotor with electromagnets and stator with field windings.
The rotor rotates at the same speed as the rotating magnetic field produced by the stator.
It requires DC excitation to create a magnetic field in the rotor.
Used in applications where constant speed is required, s
Torque variation in squirrel cage motors is achieved by changing the rotor resistance.
Torque in squirrel cage motors can be varied by changing the rotor resistance.
Increasing the rotor resistance will increase the torque produced by the motor.
Decreasing the rotor resistance will decrease the torque produced by the motor.
This method is commonly used in applications where variable torque is required, such as in fans or p
Speed and torque variation methods are used in electrical systems to control the performance of motors.
Speed variation methods include changing the frequency of the power supply or using variable speed drives.
Torque variation methods involve adjusting the voltage or current supplied to the motor.
Examples of speed variation methods include VFDs (Variable Frequency Drives) and soft starters.
Examples of torque variation m...
It contains basic logical reasoning questions
Top trending discussions
The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 869 interviews
Interview experience
based on 6.1k reviews
Rating in categories
Assistant Manager
1.1k
salaries
| βΉ6 L/yr - βΉ18.2 L/yr |
Senior Engineer
701
salaries
| βΉ3 L/yr - βΉ12 L/yr |
Assistant Construction Manager
488
salaries
| βΉ5.4 L/yr - βΉ17 L/yr |
Civil Site Engineer
469
salaries
| βΉ1.2 L/yr - βΉ8.4 L/yr |
Assistant Engineering Manager
328
salaries
| βΉ6 L/yr - βΉ17 L/yr |
Larsen & Toubro Limited
Dilip Buildcon
Simplex Infrastructures
Power Mech Projects