Filter interviews by
The location is at XYZ Power Plant and the project name is Upgrade of Electrical Systems.
Location: XYZ Power Plant
Project Name: Upgrade of Electrical Systems
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
Design optimization can be achieved through various methods such as simulation, iteration, and utilization of advanced tools.
Utilize simulation software to test different design scenarios and identify the most optimal solution
Iterate on the design by making incremental changes and evaluating the impact on performance
Use advanced tools like finite element analysis (FEA) or computational fluid dynamics (CFD) for detailed...
Expectations for monetary benefits should align with industry standards and reflect the level of responsibility and experience required for the Senior Manager role.
Monetary benefits should be competitive with market rates for Senior Manager positions.
Consider additional perks such as bonuses, stock options, or benefits packages.
Negotiate for salary increases based on performance and achievements.
Ensure transparency and...
Flashback arrestor is used to prevent fire in gas cutting set.
Flashback arrestor is a safety device designed to prevent the flame from traveling back into the gas supply line.
It works by extinguishing the flame front before it can reach the gas source.
There are different types of flashback arrestors for different gases such as oxygen, acetylene, propane, etc.
The risk is the potential for harm, loss, or danger resulting from a specific hazard or situation.
Risk is the likelihood of an event occurring and the potential consequences of that event.
Identifying and assessing risks is crucial for developing effective safety measures.
Examples of risks in a workplace include slips, trips, falls, exposure to hazardous chemicals, and equipment malfunctions.
A hazard is a potential source of harm or danger that could cause injury, illness, or damage to property.
Hazard is anything that has the potential to cause harm.
Hazards can be physical, chemical, biological, ergonomic, or psychosocial in nature.
Examples of hazards include slippery floors, toxic chemicals, infectious diseases, poor ergonomics, and workplace stress.
Identifying and controlling hazards is essential for mai
The base of scaffolding is the foundation or support structure on which the scaffolding is built.
The base of scaffolding is typically made of sturdy materials such as steel or wood.
It is important for the base to be level and stable to ensure the safety of workers using the scaffolding.
Examples of base components include base plates, mud sills, and screw jacks.
L&T Construction interview questions for popular designations
I appeared for an interview in Dec 2024.
Lattice tower sub bracing design involves the structural support system for the tower.
Sub bracing design is crucial for maintaining the stability and strength of lattice towers.
The design should consider factors such as wind load, weight distribution, and material strength.
Examples of sub bracing design elements include diagonal bracing, horizontal bracing, and cross bracing.
Computer-aided design software is often used...
Get interview-ready with Top L&T Construction Interview Questions
Prime cost is the total of direct materials cost and direct labor cost involved in production.
Prime cost includes only the direct costs associated with production.
It does not include indirect costs like overhead expenses.
Formula: Prime Cost = Direct Materials Cost + Direct Labor Cost
Example: If a company's direct materials cost is $10,000 and direct labor cost is $5,000, the prime cost would be $15,000.
The sections under TDS include 192, 194, 194A, 194B, 194C, 194D, 194DA, 194E, 194EE, 194F, 194G, 194H, 194-I, 194J, 194K, 194LA, and 195.
Section 192: TDS on salary
Section 194: TDS on dividends
Section 194A: TDS on interest other than interest on securities
Section 194B: TDS on winnings from lotteries or crossword puzzles
Section 194C: TDS on payment to contractors and sub-contractors
Section 194D: TDS on insurance commissi...
General accounting inquiries.
Safety measures at the site include wearing appropriate personal protective equipment, following safety protocols, conducting regular safety inspections, and providing safety training to all workers.
Wearing appropriate personal protective equipment such as helmets, gloves, and safety shoes
Following safety protocols and guidelines set by the company and regulatory bodies
Conducting regular safety inspections to identify ...
Yes, I am ready for remote locations as I am adaptable and have experience working in challenging environments.
I have previous experience working in remote locations.
I am adaptable and can easily adjust to new environments.
I am comfortable with limited resources and facilities.
I am prepared for potential challenges such as limited communication and transportation options.
Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.
Concrete mix design involves selecting the right combination of cement, aggregates, water, and admixtures.
The proportions of each ingredient are determined based on the desired strength, workability, and durability of the concrete.
Factors such as the type of project, environ...
I appeared for an interview in Feb 2025, where I was asked the following questions.
I appeared for an interview in Jan 2025.
The responsibility of an admin includes managing office operations, organizing files, scheduling appointments, and providing administrative support.
Managing office operations such as answering phones, ordering supplies, and coordinating meetings
Organizing files and maintaining records for easy access
Scheduling appointments and managing calendars
Providing administrative support to staff members
Handling correspondence an
Handling admin work involves organization, time management, attention to detail, and communication skills.
Prioritize tasks based on urgency and importance
Use organizational tools such as calendars and to-do lists
Maintain accurate records and files
Communicate effectively with colleagues and clients
Stay updated on office policies and procedures
Seek help or clarification when needed
Top trending discussions
The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 869 interviews
Interview experience
based on 6.1k reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
701
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
488
salaries
| ₹5.4 L/yr - ₹17 L/yr |
Civil Site Engineer
469
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
328
salaries
| ₹6 L/yr - ₹17 L/yr |
Larsen & Toubro Limited
Dilip Buildcon
Simplex Infrastructures
Power Mech Projects