Filter interviews by
Prime cost is the total of direct materials cost and direct labor cost involved in production.
Prime cost includes only the direct costs associated with production.
It does not include indirect costs like overhead expenses.
Formula: Prime Cost = Direct Materials Cost + Direct Labor Cost
Example: If a company's direct materials cost is $10,000 and direct labor cost is $5,000, the prime cost would be $15,000.
The sections under TDS include 192, 194, 194A, 194B, 194C, 194D, 194DA, 194E, 194EE, 194F, 194G, 194H, 194-I, 194J, 194K, 194LA, and 195.
Section 192: TDS on salary
Section 194: TDS on dividends
Section 194A: TDS on interest other than interest on securities
Section 194B: TDS on winnings from lotteries or crossword puzzles
Section 194C: TDS on payment to contractors and sub-contractors
Section 194D: TDS on insurance commissi...
Top trending discussions
posted on 19 Mar 2024
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
posted on 19 Mar 2024
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
662
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
528
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Assistant Engineering Manager
321
salaries
| ₹6 L/yr - ₹17 L/yr |
Civil Site Engineer
320
salaries
| ₹1.2 L/yr - ₹7.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA