I applied via Job Portal and was interviewed in Dec 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Sep 2023. There were 4 interview rounds.
Minimum steel bar of column should be used as per structural design requirements.
Minimum steel bar should be used as per the structural design calculations to ensure the safety and stability of the column.
The size and spacing of the steel bars in the column should be as per the design specifications provided by the structural engineer.
Using less steel than required can compromise the strength and load-bearing capacity ...
Square column minimum steel bar requirement is based on the size of the column and the load it will bear.
Minimum steel bar requirement for square columns is typically 0.8% of the cross-sectional area.
The size of the column and the load it will bear will determine the exact amount of steel required.
For example, a 12x12 inch square column with a load capacity of 100 tons may require a minimum of 4 steel bars.
My final interview Very good
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
My civil engineering Diploma and my total for project complete working gas oil paip line.
Top trending discussions
posted on 27 May 2024
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
All work done completed Target
I applied via Referral
posted on 19 Aug 2024
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
posted on 13 Jan 2024
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in May 2022. There was 1 interview round.
I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.
Answering questions related to projects, dynamic analysis, toughest project, pile foundations, and steel connection design.
Projects handled: Mention the types of projects, their scale, and your role in them.
Dynamic analysis methods: Explain different methods like time history analysis, response spectrum analysis, etc.
Modal combination methods: Discuss different methods like CQC, SRSS, ABS, etc., and their differences.
T...
I applied via Approached by Company
Lap length and development length for hoop, grade of concrete, and HDPE pipe are specified in code.
Lap length for hoop reinforcement is specified in IS 456:2000 and varies based on the diameter of the bar and the grade of concrete.
Development length is the length of the bar required to transfer the stress from the bar to the surrounding concrete and is also specified in IS 456:2000.
The grade of concrete determines the ...
based on 45 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
662
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
528
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Civil Site Engineer
383
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
321
salaries
| ₹6 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA