Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.
Identify the item or activity to be analyzed
Determine the quantity of materials and labor required
Calculate the cost of materials and labor
Add overhead costs and profit margin
Divide the total cost by the quantity to get the unit rate
Compare the rate with market rates to ensure competitiveness
Components to be considered in Rate analysis
Cost of materials
Cost of labor
Cost of equipment
Overhead expenses
Profit margin
Taxes and duties
Transportation costs
Wastage and spoilage
Contingencies
Productivity rates
Market rates
Inflation rates
The documents required to certify the final bill as a Quantity Surveyor.
Contract documents
Measurement records
Variation orders
Payment certificates
Final account statement
As-built drawings
Completion certificates
Test reports
Subcontractor invoices
Material invoices
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
Cost to complete refers to the estimated amount of money required to finish a project or task.
Cost to complete is an important metric used in project management and quantity surveying.
It takes into account the remaining work, resources, and expenses needed to complete a project.
It helps in assessing the financial status of a project and making informed decisions.
Cost to complete can be calculated by subtracting the act...
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
posted on 9 Apr 2022
I applied via Approached by Company
HDPE pipe is a type of plastic pipe used for water supply and drainage systems. A supervisor oversees the installation and maintenance of the pipes.
HDPE pipes are lightweight and flexible, making them easy to install and transport.
They are resistant to corrosion and chemicals, making them ideal for use in harsh environments.
Supervisors ensure that the pipes are installed correctly and that any issues are addressed prom...
XXXXX
posted on 6 Jul 2024
posted on 1 Jan 2020
Shutting working refers to the process of closing or shutting down a construction site or specific area for maintenance, repairs, or safety reasons.
Shutting working involves temporarily stopping all construction activities in a designated area.
It is done to ensure the safety of workers and the public, as well as to carry out necessary maintenance or repairs.
During shutting working, access to the area is restricted, and...
GFl stands for Ground Fault Locator.
GFl is a device used to locate ground faults in electrical systems.
It helps in identifying the exact location of the fault, which can be crucial for maintenance and repair work.
By measuring the flow of current and voltage, GFl can pinpoint the area where the electrical current is leaking to the ground.
It is commonly used in industries, construction sites, and power distribution syste...
I applied via Campus Placement and was interviewed in Dec 2024. There was 1 interview round.
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
My civil engineering Diploma and my total for project complete working gas oil paip line.
posted on 14 Oct 2023
I applied via Job Fair and was interviewed in Sep 2023. There were 3 interview rounds.
based on 3 reviews
Rating in categories
Assistant Manager
92
salaries
| ₹6 L/yr - ₹15.2 L/yr |
Senior Engineer
74
salaries
| ₹5.2 L/yr - ₹10.6 L/yr |
Assistant Engineer
41
salaries
| ₹2.4 L/yr - ₹6.8 L/yr |
Project Engineer
35
salaries
| ₹4.4 L/yr - ₹7.5 L/yr |
Deputy Manager
26
salaries
| ₹11 L/yr - ₹16.5 L/yr |
Larsen & Toubro Limited
L&T Construction
Shapoorji Pallonji Group
Simplex Infrastructures