I have over 10 years of experience in senior engineer QA/QC roles in the construction industry.
Managed quality control processes for construction projects
Performed inspections and audits to ensure compliance with regulations and standards
Implemented quality improvement initiatives to enhance project outcomes
Collaborated with project teams to address quality issues and drive continuous improvement
Mivan sequence involves setting up formwork for concrete construction. Tests for concrete in Mivan include slump test, cube test, and temperature monitoring.
Mivan sequence involves setting up formwork quickly and efficiently
Tests for concrete in Mivan include slump test to check workability
Cube test is done to assess the strength of concrete
Temperature monitoring is important to ensure proper curing
I appeared for an interview in Mar 2025, where I was asked the following questions.
I appeared for an interview in Mar 2025, where I was asked the following questions.
Mivan shuttering projects can be challenging due to complexity, logistics, and coordination among teams.
Complex designs: Projects with intricate architectural features require precise shuttering.
Logistical challenges: Transporting and assembling heavy Mivan forms on-site can be difficult.
Weather conditions: Rain or extreme temperatures can delay work and affect concrete curing.
Team coordination: Ensuring all teams are ...
I have over 8 years of experience in Mivan shuttering, managing projects efficiently and ensuring high-quality construction standards.
Led a team of 15 workers on a high-rise building project, completing it 2 weeks ahead of schedule.
Implemented safety protocols that reduced on-site accidents by 30%.
Trained new staff on Mivan techniques, improving their productivity by 25% within the first month.
Collaborated with archite...
Aparna Constructions and Estates interview questions for popular designations
I appeared for an interview in Feb 2025, where I was asked the following questions.
MCBs protect lighting circuits from overloads and short circuits, ensuring safety and reliability in electrical systems.
MCB stands for Miniature Circuit Breaker, used to protect electrical circuits.
In lighting applications, MCBs prevent overloads that can cause fires.
Example: A 10A MCB is suitable for residential lighting circuits.
MCBs can be single or multi-pole, depending on the circuit requirements.
They provide auto...
Get interview-ready with Top Aparna Constructions and Estates Interview Questions
I applied via Referral and was interviewed in Nov 2023. There were 5 interview rounds.
I applied via Referral
Top trending discussions
Some of the top questions asked at the Aparna Constructions and Estates interview for experienced candidates -
The duration of Aparna Constructions and Estates interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 26 interviews
Interview experience
based on 855 reviews
Rating in categories
Hyderabad / Secunderabad
4-8 Yrs
₹ 4.7-6.5 LPA
Hyderabad / Secunderabad
8-13 Yrs
Not Disclosed
Assistant Engineer
196
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Junior Engineer
104
salaries
| ₹2 L/yr - ₹5 L/yr |
Senior Engineer
99
salaries
| ₹4.2 L/yr - ₹9.2 L/yr |
Engineer
87
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
80
salaries
| ₹2.8 L/yr - ₹5.3 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties