i
Aparna Constructions and Estates
Filter interviews by
I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.
Top trending discussions
posted on 9 Nov 2024
Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.
Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more
It is made by mixing cement, water, and aggregates like sand and gravel
Additives can be included to enhance specific properties of the concrete, such as strength or workability
Once mixed, concrete harden...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.
BBS includes details such as bar mark, type of bar, diameter, length, shape, and quantity.
It helps in estimating the quantity of steel required for the project.
BBS is essential for ensuring the structural integrity and strength of the building.
Components of BBS include bending shapes, cutting length,
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 2 interview rounds.
posted on 14 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
The number of bricks in 1 cubic meter varies depending on the size of the bricks used.
The number of bricks in 1 cubic meter will depend on the size of the bricks being used.
Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.
Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.
Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.
Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.
The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.
Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...
NRC stands for National Register of Citizens.
NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.
It was first prepared in 1951 and is now being updated to identify illegal immigrants.
The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.
posted on 24 Aug 2024
based on 15 reviews
Rating in categories
Assistant Engineer
196
salaries
| ₹2 L/yr - ₹6.4 L/yr |
Junior Engineer
102
salaries
| ₹2 L/yr - ₹5 L/yr |
Senior Engineer
86
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Engineer
85
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
83
salaries
| ₹2.5 L/yr - ₹5.3 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF