I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.
Top trending discussions
posted on 11 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
Slump cone top diameter is the diameter of the top opening of a slump cone used to measure the consistency of concrete.
Slump cone top diameter is typically around 4 inches.
It is an important factor in determining the workability of concrete.
The slump cone test involves filling the cone with concrete, then lifting the cone to see how much the concrete slumps.
A larger top diameter of the slump cone indicates a higher wor
The M30 concrete compressive strength is typically around 30 MPa.
M30 concrete is a mix design with a characteristic compressive strength of 30 MPa.
It is commonly used in construction for various structural elements.
The strength of M30 concrete can vary based on factors like water-cement ratio, curing conditions, and quality of materials.
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
Branding schedule is a plan outlining the timeline and activities for promoting a brand.
Branding schedule includes tasks such as creating a brand strategy, designing a logo, developing marketing materials, and planning advertising campaigns.
It helps ensure consistency in brand messaging and image across different platforms and channels.
Example: A branding schedule for a new product launch may include market research, l...
Concrete grade and mixing ratio are crucial factors in determining the strength and durability of a structure.
Concrete grade refers to the strength of the concrete mix, typically denoted by a number like M20, M30, etc.
Mixing ratio is the proportion of cement, sand, and aggregate in the concrete mix, usually expressed as 1:x:y.
For example, a common mixing ratio for M20 grade concrete is 1:1.5:3, which means 1 part cemen
Regularly inspect and maintain all equipment and tools used on site to ensure they are in good working condition.
Create a maintenance schedule for all equipment and tools used on site.
Check for any signs of wear and tear on equipment and tools.
Clean and lubricate equipment regularly to prevent rust and corrosion.
Replace any damaged or worn out parts immediately.
Train site workers on proper handling and maintenance of e...
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.
Perform a slump test to determine the workability of the concrete mix.
Take samples from the mixed batch and cast test specimens for compressive strength testing.
Conduct compressive strength tests on the specimens to determine the grade of concrete.
Compare the test results with the standar
Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.
Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.
Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.
Site tests for cement include checking the color, sm...
Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.
Calculate the surface area of the wall by multiplying the height and length of each wall segment.
Determine the total surface area to be plastered by adding up the surface areas of all wall segments.
Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.
Consi...
posted on 22 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
posted on 17 Aug 2023
I applied via AmbitionBox and was interviewed before Aug 2022. There were 2 interview rounds.
It is very difficult test to pass
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Mix design is the process of determining the proportions of ingredients to be used in concrete or asphalt.
Mix design ensures the desired strength and durability of the construction material.
It takes into account factors such as the type of aggregate, cement, water, and admixtures.
Mix design is used in various construction projects such as buildings, roads, bridges, and dams.
For example, a mix design for a high-rise bui...
Batching plant test of concrete is a process to ensure the quality of concrete before it is used in construction.
Batching plant test involves checking the strength, workability, and consistency of concrete.
Tests are conducted on samples of concrete taken from the batching plant.
Tests include slump test, compressive strength test, and water-cement ratio test.
Results of the tests are compared with the specifications to e...
I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.
Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.
Hydration process starts as soon as water is added to cement.
The reaction produces heat and causes the mixture to harden and gain strength.
The process continues for weeks and even months, resulting in a stronger and more durable concrete.
The amount of water used in the mixture affects the hydration process and...
Concrete strength depends on various factors.
Water-cement ratio
Type and quality of cement
Aggregate size and shape
Curing conditions
Mix design
Age of concrete
Temperature and humidity
Presence of admixtures
Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.
Water is added to hydrate the cement and activate the chemical reaction that causes it to harden
The amount of water added affects the strength and durability of the concrete
Too much water can weaken the concrete and cause cracking
The water should be added gradually and mixed thoroughly to ensure even distribution
Ot...
based on 1 interview
Interview experience
Civil Foreman
7
salaries
| ₹2.7 L/yr - ₹4.8 L/yr |
Project Manager
6
salaries
| ₹5.5 L/yr - ₹11.4 L/yr |
Project Engineer
6
salaries
| ₹3 L/yr - ₹6 L/yr |
Store Incharge
6
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Billing Engineer
6
salaries
| ₹4.1 L/yr - ₹8.5 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group