Slump cone top diameter is the diameter of the top opening of a slump cone used to measure the consistency of concrete.
Slump cone top diameter is typically around 4 inches.
It is an important factor in determining the workability of concrete.
The slump cone test involves filling the cone with concrete, then lifting the cone to see how much the concrete slumps.
A larger top diameter of the slump cone indicates a higher wor
The M30 concrete compressive strength is typically around 30 MPa.
M30 concrete is a mix design with a characteristic compressive strength of 30 MPa.
It is commonly used in construction for various structural elements.
The strength of M30 concrete can vary based on factors like water-cement ratio, curing conditions, and quality of materials.
Top trending discussions
I was interviewed in Jan 2025.
I am currently working at a construction company specializing in infrastructure projects.
Specializing in infrastructure projects
Working at a construction company
Dealing with civil engineering tasks
I have 5 years of experience working on various civil engineering projects, including site development, infrastructure design, and construction management.
Managed site development projects from concept to completion
Designed infrastructure systems such as water supply and drainage
Performed construction management duties to ensure projects stayed on schedule and within budget
Worked on projects ranging from residential de...
Handling a site in the transmission sector involves coordinating with various stakeholders, ensuring compliance with regulations, and overseeing the construction process.
Coordinate with utility companies to ensure proper installation of transmission lines
Ensure compliance with safety regulations and environmental standards
Oversee the construction process to ensure quality and timely completion
Manage and resolve any iss...
Key considerations for foundation in transmission line construction
Soil type and bearing capacity must be assessed
Proper foundation design to support the weight and wind loads of the transmission line towers
Consideration of environmental factors such as seismic activity and flooding
Accessibility for construction equipment and maintenance
Proper drainage to prevent erosion and foundation instability
The best method for erection in transmission is using cranes and specialized equipment.
Use cranes for lifting and placing heavy transmission components
Ensure proper planning and coordination to avoid delays
Utilize specialized equipment for precise positioning
Follow safety protocols to prevent accidents
Consider environmental factors such as wind and terrain
I adapt to challenging situations by staying calm, analyzing the problem, seeking advice from colleagues, and coming up with creative solutions.
Stay calm and composed under pressure
Analyze the problem thoroughly before taking action
Seek advice and input from colleagues or experts
Think creatively to come up with innovative solutions
The diagonal in the transmission sector plays a crucial role in providing structural stability and support to the transmission towers.
The diagonal members in transmission towers help to distribute the load and provide stability against wind and seismic forces.
They prevent the tower from buckling or collapsing under various loads.
Diagonals also help in reducing the overall weight of the tower by transferring some of the...
posted on 6 Feb 2025
What is the colume
The vertical part of the building and base of the slab, distribution of load
posted on 19 Jan 2024
I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.
posted on 14 Feb 2024
posted on 1 Aug 2024
I applied via Recruitment Consulltant and was interviewed in Feb 2024. There were 2 interview rounds.
As usual simple question.
Software test like ms office suit ad auto cad.
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
They ask question on SFD AND BMD
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.
posted on 22 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
My current CTC is $80,000 per year.
My current CTC is $80,000 per year
It includes base salary, bonuses, and benefits
I am open to negotiation based on the job role and responsibilities
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Electrical Engineer
270
salaries
| ₹1.8 L/yr - ₹8.4 L/yr |
Senior Engineer
246
salaries
| ₹3.1 L/yr - ₹9.1 L/yr |
Project Engineer
212
salaries
| ₹2.4 L/yr - ₹8.5 L/yr |
Assistant Manager
165
salaries
| ₹4.7 L/yr - ₹17 L/yr |
Manager
137
salaries
| ₹7.3 L/yr - ₹23.6 L/yr |
Larsen & Toubro Limited
Tata Power
Thermax Limited
BHEL