DSR stands for Detailed Specified Report, a document used in construction projects to provide detailed information on materials, labor, and equipment required for a specific project.
DSR is used by billing engineers to accurately estimate the cost of a construction project.
It includes detailed information on the quantity, rate, and cost of materials, labor, and equipment needed for the project.
DSR helps in preparing acc...
I was interviewed in Aug 2023.
The density of steel is approximately 7.85 g/cm^3.
The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel can vary slightly depending on the specific alloy and composition.
For example, the density of stainless steel is around 7.9 g/cm^3, while the density of carbon steel is around 7.85 g/cm^3.
The multiple factor for GST is 1.18
The multiple factor for GST is 1.18, which includes both CGST (Central Goods and Services Tax) and SGST (State Goods and Services Tax)
It is used to calculate the total tax amount to be added to the base price of a product or service
For example, if the base price of a product is $100, the total price including GST would be $118
Stirrup cutting length is calculated based on the diameter of the stirrup and the number of bends required.
Stirrup cutting length = (2 x L) + (2 x B x D) + 10D
L = clear span between the supports
B = number of bends
D = diameter of the stirrup
Example: For a stirrup with a diameter of 10mm, 2 bends, and a clear span of 3m, the cutting length would be (2 x 3) + (2 x 2 x 10) + 10 x 10 = 86cm
Top trending discussions
posted on 5 Feb 2024
I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.
Summary question and also some coding of alphabet
Tax deduction in RA BILL
Tax deduction is applicable on certain items in a RA bill
The deduction amount varies based on the item and tax laws
Examples of items with tax deduction include TDS, GST, and service tax
Price escalation refers to the increase in the cost of goods or services over time.
It is a common phenomenon in the construction industry where the cost of materials and labor increases over time.
Price escalation can be caused by various factors such as inflation, changes in market demand and supply, and changes in government policies.
It is important for billing engineers to take price escalation into account when esti...
The volume of a trapezoidal shape can be calculated using its height and the lengths of its parallel sides.
The formula for calculating the volume of a trapezoidal shape is (1/2) x height x (length of parallel side 1 + length of parallel side 2)
The height is the perpendicular distance between the parallel sides
For example, if the trapezoidal shape has a height of 5 units, a length of parallel side 1 of 8 units, and a le...
Wastage for concrete and steel depends on various factors such as site conditions, workmanship, and design.
Wastage for concrete can range from 2% to 10% depending on the quality of workmanship and site conditions.
Wastage for steel can range from 2% to 5% depending on the design and fabrication process.
Factors such as improper handling, cutting, and bending can also contribute to wastage.
Proper planning and management c...
Variation for extra items is a common occurrence in construction projects.
Extra items may include additional work, materials, or changes in design.
The variation may be initiated by the client or due to unforeseen circumstances.
The billing engineer must accurately document and price the extra items.
The variation may require approval from the client and/or consultant before proceeding.
Examples of extra items include addi...
An account engineer manages financial accounts while a billing engineer handles billing and invoicing.
Account engineers manage financial accounts and ensure that all financial transactions are recorded accurately.
Billing engineers handle billing and invoicing processes, ensuring that customers are billed correctly and payments are received on time.
While both roles involve financial management, account engineers focus o...
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
posted on 31 Mar 2021
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.
The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.
Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process
Discussed the importance of reconciliation in ensuring accurate billing and payment
Described the process of rate analysis and how ...
posted on 16 Nov 2023
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
Gk , aptitude and technical
Billing is the process of generating invoices for goods or services provided.
Billing involves calculating costs, creating invoices, and sending them to customers.
It is important for tracking revenue and ensuring timely payment.
Examples of billing software include QuickBooks, FreshBooks, and Zoho Invoice.
I applied via Company Website and was interviewed in Oct 2022. There were 4 interview rounds.
Pile foundation is a type of deep foundation used to transfer heavy loads of a structure to a deeper level of soil or rock.
Pile foundation is used when the soil at the surface is not strong enough to support the weight of the structure.
It consists of long, slender columns made of concrete, steel or timber that are driven into the ground.
The piles are driven deep enough to reach a layer of soil or rock that is strong en...
based on 3 reviews
Rating in categories
Civil Foreman
7
salaries
| ₹2.7 L/yr - ₹4.8 L/yr |
Project Manager
6
salaries
| ₹5.5 L/yr - ₹11.4 L/yr |
Project Engineer
6
salaries
| ₹3 L/yr - ₹6 L/yr |
Store Incharge
6
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Billing Engineer
6
salaries
| ₹4.1 L/yr - ₹8.5 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group