I applied via Walk-in
DSR stands for Detailed Specified Report, a document used in construction projects to provide detailed information on materials, labor, and equipment required for a specific project.
DSR is used by billing engineers to accurately estimate the cost of a construction project.
It includes detailed information on the quantity, rate, and cost of materials, labor, and equipment needed for the project.
DSR helps in preparing acc...
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
I was interviewed in Aug 2023.
The density of steel is approximately 7.85 g/cm^3.
The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel can vary slightly depending on the specific alloy and composition.
For example, the density of stainless steel is around 7.9 g/cm^3, while the density of carbon steel is around 7.85 g/cm^3.
The multiple factor for GST is 1.18
The multiple factor for GST is 1.18, which includes both CGST (Central Goods and Services Tax) and SGST (State Goods and Services Tax)
It is used to calculate the total tax amount to be added to the base price of a product or service
For example, if the base price of a product is $100, the total price including GST would be $118
Stirrup cutting length is calculated based on the diameter of the stirrup and the number of bends required.
Stirrup cutting length = (2 x L) + (2 x B x D) + 10D
L = clear span between the supports
B = number of bends
D = diameter of the stirrup
Example: For a stirrup with a diameter of 10mm, 2 bends, and a clear span of 3m, the cutting length would be (2 x 3) + (2 x 2 x 10) + 10 x 10 = 86cm
I am a dedicated and experienced professional with a strong background in project management and team leadership.
Over 10 years of experience in project management
Proven track record of successfully leading cross-functional teams
Strong communication and problem-solving skills
Proficient in budget management and resource allocation
Certified Project Management Professional (PMP)
Previous projects include implementing a new
I have over 10 years of experience in project management, including leading cross-functional teams and delivering successful projects on time and within budget.
Led cross-functional teams to successfully deliver projects
Managed project budgets and timelines effectively
Implemented project management best practices to ensure success
Collaborated with stakeholders to define project scope and objectives
Vishal Builders interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.
Top trending discussions
posted on 20 Nov 2020
I applied via Campus Placement and was interviewed before Nov 2019. There were 5 interview rounds.
Escalation is the increase in cost or price of goods or services over time due to various factors.
Escalation is significant in construction projects where the cost of materials and labor can increase over time.
It is important to factor in escalation when creating project budgets and timelines.
The formula for escalation is: Escalated Cost = Base Cost x (1 + Escalation Rate)^Number of Years
For example, if the base cost o...
Penalty is a punishment for breach of contract while liquidity damages compensate for financial loss due to breach.
Penalty is a fixed amount agreed upon in the contract as a punishment for breach of contract.
Liquidity damages compensate for the actual financial loss suffered due to breach of contract.
Penalty is usually higher than the actual loss suffered while liquidity damages are calculated based on the actual loss.
...
Basic Price variation refers to the change in the cost of materials or labor used in a project.
Basic Price variation is a common clause in construction contracts.
It allows for adjustments to the contract price based on changes in the cost of materials or labor.
The variation can be positive or negative, depending on whether the cost has increased or decreased.
The variation is usually calculated using an agreed-upon form...
Yes, basic price variation is beneficial for a contract.
Basic price variation allows for adjustments to be made to the contract price based on changes in market conditions or material costs.
This helps to ensure that the contractor is not unfairly burdened with unexpected costs and can maintain profitability.
It also provides a level of transparency and accountability in the contract, as both parties are aware of the pot...
There are various types of contracts in construction projects. Each has its own advantages and drawbacks.
Types of contracts include lump sum, cost-plus, time and material, and unit price contracts.
Lump sum contracts provide a fixed price for the entire project, but can lead to disputes over changes.
Cost-plus contracts reimburse the contractor for all costs plus a fee, but can lead to inflated costs.
Time and material co...
posted on 27 May 2023
I applied via Walk-in and was interviewed before May 2022. There were 3 interview rounds.
20 question related to construction field
posted on 3 Apr 2023
I applied via Naukri.com and was interviewed before Apr 2022. There were 3 interview rounds.
Logical reasoning, aptitude, blood relation, missing number, ven diagram etc
posted on 19 Sep 2021
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
Rolling margin is the extra length of reinforcement steel provided to compensate for any cutting or bending during construction.
Rolling margin is usually 5-10% of the total length of reinforcement steel required for a project.
It is important to factor in rolling margin during the estimation and procurement of reinforcement steel.
For example, if a beam requires 10 meters of reinforcement steel, a rolling margin of 0.5-1...
The wastage limit of reinforcement steel varies as per CPWD and market practice.
CPWD allows a wastage limit of 2% for reinforcement steel.
However, market practice may vary and some contractors may allow up to 3% wastage.
Wastage can occur due to cutting, bending, and handling of steel bars.
Proper planning and management can help minimize wastage and save costs.
The last project I worked on had a value of $5 million.
The project was a commercial building construction.
I was responsible for preparing and submitting billing invoices.
The project was completed within the estimated budget.
The project duration was 18 months.
The project involved coordination with multiple stakeholders including architects, contractors, and vendors.
posted on 5 Feb 2024
I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.
Summary question and also some coding of alphabet
based on 14 interviews
Interview experience
based on 59 reviews
Rating in categories
Store Incharge
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Foreman
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Billing Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group