Filter interviews by
The cube test acceptance criteria is a set of standards used to determine if a cube specimen meets the required strength for construction purposes.
The acceptance criteria typically involves comparing the compressive strength of the cube specimen to a specified minimum value.
The cube test acceptance criteria may also include factors such as curing conditions, testing procedures, and age of the specimen.
For example, a co...
The number of HT strands required depends on the specifications provided for the project.
The number of HT strands required will vary based on the voltage rating, current carrying capacity, and insulation requirements of the project.
Consult the project specifications to determine the exact number of HT strands needed.
For example, a project with a higher voltage rating may require more HT strands to meet the necessary in...
Concrete crack repairing involves cleaning the crack, filling it with a suitable material, and sealing it to prevent further damage.
Clean the crack thoroughly to remove any debris or loose material
Fill the crack with a suitable material such as epoxy or polyurethane
Seal the crack with a concrete sealer to prevent water infiltration and further damage
I was interviewed in Dec 2024.
The interview process was thorough and challenging, but overall a positive experience.
The interview consisted of multiple rounds, including technical, behavioral, and possibly a site visit.
I was asked to discuss my previous projects and experiences in detail.
There were questions about problem-solving skills and how I handle challenging situations on site.
Overall, the interviewers were professional and provided a clear
My salary expectations are in line with industry standards and based on my experience and qualifications.
Research industry standards for Civil Site Engineers in the specific location
Consider years of experience and level of qualifications
Be prepared to negotiate based on job responsibilities and benefits package
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Opportunity for professional growth
Company restructuring or downsizing
Relocation to a new city
Cement is a binding material used in construction to hold together bricks, stones, and other materials.
Cement is a fine powder made from limestone, clay, and other minerals.
When mixed with water, cement forms a paste that hardens and binds materials together.
Common types of cement include Portland cement, which is used in most construction projects.
Cement is a key ingredient in concrete, mortar, and grout.
Proper curing...
URC Construction interview questions for popular designations
General aptitude questions
Get interview-ready with Top URC Construction Interview Questions
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
Site administrative.
Cost and budget and agreed timeline.
I applied via Campus Placement and was interviewed in Apr 2024. There were 3 interview rounds.
General knowledge and basic things about civil engineering.
Two topic given in which we have to choose one topic and start discussing in it.
I am a recent graduate with a degree in Civil Engineering, eager to learn and grow in the field of construction.
Recent graduate with a degree in Civil Engineering
Passionate about construction and eager to learn
Strong communication and problem-solving skills
Experience with CAD software and project management
Short term goal is to gain hands-on experience in site engineering. Long term goal is to become a successful and knowledgeable site engineer.
Short term goal: Gain practical experience in site engineering through on-site training and projects.
Long term goal: Develop expertise in site engineering, project management, and leadership skills to become a successful site engineer.
Short term goal example: Completing training p...
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for career growth and new experiences.
I understand that being flexible with location can lead to more opportunities.
I have relocated in the past for job opportunities and have found it to be a positive experience.
Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.
Calculate the surface area of each individual formwork used for the concrete structure
Add up the surface areas of all formworks to get the total shuttering area
Consider any openings or gaps in the formwork when calculating the area
The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.
The formula for the area of a semi-circle is (1/2) * pi * r^2
The radius (r) is half the diameter of the circle
Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2
Safety in construction site involves implementing measures to prevent accidents and injuries.
Ensuring all workers are properly trained on safety procedures
Regular inspections of equipment and machinery
Providing personal protective equipment (PPE) to all workers
Implementing fall protection measures for working at heights
Creating emergency response plans and conducting drills
Enforcing strict adherence to safety regulatio
The duration of URC Construction interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 62 interviews
Interview experience
based on 493 reviews
Rating in categories
Assistant Engineer
182
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
132
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group