Upload Button Icon Add office photos

Filter interviews by

Tata Steel Utilities and Infrastructure Services Interview Questions, Process, and Tips

Updated 25 Aug 2024

Top Tata Steel Utilities and Infrastructure Services Interview Questions and Answers

View all 27 questions

Tata Steel Utilities and Infrastructure Services Interview Experiences

Popular Designations

33 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Electrical questions for transformers, moter, breakers, cable laying, panel installed.
  • Q2. Type of transformers, safety friction etc.
  • Ans. 

    Transformers are electrical devices that transfer energy between two or more circuits through electromagnetic induction, ensuring safety and efficiency.

    • Types of transformers include step-up, step-down, isolation, and auto-transformers.

    • Safety measures for transformers include proper grounding, regular maintenance, and overcurrent protection.

    • Friction in transformers can lead to overheating and insulation breakdown, so pr...

  • Answered by AI
  • Q3. Motor maintenance related questions.
  • Q4. Electrical wiring related questions.
  • Q5. Earthing test and maintain test records.

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you

Electrical Supervisor Interview Questions asked at other Companies

Q1. Tell me about HT LT and Dg Transformer, how to do load changeover
View answer (1)
Interview experience
3
Average
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is civil engineering
  • Ans. 

    Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.

    • Involves designing and constructing buildings, bridges, roads, dams, and other structures

    • Focuses on ensuring structures are safe, functional, and sustainable

    • Requires knowledge of materials, construction techniques, and project management

    • Involves working with architects, contractors, and gove...

  • Answered by AI
  • Q2. Civil engineering is build anything for other faculties
  • Q3. What is HIRA and JSA
  • Ans. 

    HIRA stands for Hazard Identification and Risk Assessment, while JSA stands for Job Safety Analysis.

    • HIRA is a systematic process for identifying potential hazards in the workplace and assessing the associated risks.

    • JSA is a process of breaking down a job into its individual tasks to identify potential hazards and implement safety measures.

    • Both HIRA and JSA are important tools for ensuring workplace safety and preventin...

  • Answered by AI
  • Q4. Hira-Hazard identification risk assessment
  • Q5. What is wtp and PSTP
  • Ans. 

    WTP stands for Water Treatment Plant and PSTP stands for Prefabricated Sewage Treatment Plant.

    • WTP is a facility where water is treated to make it safe for consumption or for other purposes.

    • PSTP is a type of sewage treatment plant that is pre-designed and manufactured off-site before being transported to the final location for installation.

    • Both WTP and PSTP play crucial roles in ensuring clean water supply and proper se...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - All ways be positive for interview

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (20)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Change of scope
  • Ans. 

    Change of scope refers to any modifications or additions to the original project plan.

    • Change of scope can include additional work, removal of work, or alterations to existing work.

    • It is important to document any changes in scope to avoid disputes later on.

    • Changes in scope may impact project timelines, costs, and resources.

    • Examples of change of scope include client requests for additional features, design changes, or un...

  • Answered by AI
  • Q2. Construction program regulation
  • Q3. Contractor billing
  • Q4. Daily progress report
  • Q5. Inspection details as per Authority
  • Q6. Bar bending schedule

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Trainee Interview Questions & Answers

user image Anonymous

posted on 5 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell about yourself
  • Q2. Subject related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - BE CONFIDENT AND HAVE GOOD SUBJECT KNOWLEDGE WITH REGARD TO THE POSITION APPLIED FOR.

Trainee Interview Questions asked at other Companies

Q1. Ques1: There is a big file of words which is dynamically changing. We are continuously adding some words into it. How would you keep track of top 10 trending words at each moment? Ques2:Write a function that returns the length of the longes... read more
View answer (2)

Tata Steel Utilities and Infrastructure Services interview questions for popular designations

 Project Officer

 (3)

 Graduate Trainee

 (2)

 Assistant Manager

 (1)

 Asst Store

 (1)

 Civil Engineer

 (1)

 Design Engineer

 (1)

 Diploma Mechanical Engineer

 (1)

 Electrical Maintenance Engineer

 (1)

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. About RCC and steel structure, IS codes

Interview Preparation Tips

Interview preparation tips for other job seekers - Deep knowledge of IS clauses and technical codes must

Project Engineer - Civil Interview Questions asked at other Companies

Q1. 15 days Program sheet for Steel qty of 850 sqft, slab area, 60 columns of size 600×300 mm and 3.0 m height, 30 Mt steel & Steel shuttering.
View answer (2)

Get interview-ready with Top Tata Steel Utilities and Infrastructure Services Interview Questions

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your sef?

Project Officer Interview Questions asked at other Companies

Q1. Power Tester working and uses.
View answer (4)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the process of water treatment plant. If pressure pump running Anticlock what will you do. What happened if power failure . what will you do first. What is running amper
  • Ans. 

    Water treatment plant process involves several steps. In case of pressure pump running anticlockwise, the pump should be stopped and checked. In case of power failure, the generator should be started. Running amper is the measure of electrical current flowing through a circuit.

    • Water treatment plant process involves coagulation, sedimentation, filtration, and disinfection.

    • If pressure pump is running anticlockwise, it ma...

  • Answered by AI
  • Q2. What Is your higher qualifications.

Water Plant Operator Interview Questions asked at other Companies

Q1. What is the process of water treatment plant. If pressure pump running Anticlock what will you do. What happened if power failure . what will you do first. What is running amper
View answer (1)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement and was interviewed in Mar 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

There were several questions on aptitude of intermediate level. One having a strong mathematics base can easily clear the round.

Round 3 - Group Discussion 

In this round there will be a group of 5 or 7 students and a topic was given which everyone had to put their views upon.

Round 4 - HR 

(2 Questions)

  • Q1. All the questions were upon the things one mentioned in his/her resume.
  • Q2. Another level of questions will be from core sections.

Interview Preparation Tips

Interview preparation tips for other job seekers - You should be cool minded and no-one knows everything so just be patient and answer what you know, don't give irrelevant answers. Only say such lines which you know and which you are confident about. And have the courage to say NO to the questions whose answer you don't know.

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)

Senior Manager Interview Questions & Answers

user image Manish Vaishkhiyar

posted on 5 Sep 2023

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Simple Question ask but when I joined I feel ,Job responsibilities what they share are not properly shared.
  • Q2. Share your introduction
Round 3 - HR 

(1 Question)

  • Q1. Why u come to Jamshedpur

Interview Preparation Tips

Interview preparation tips for other job seekers - Not Join TSUISL , not upto the mark.

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

Project Officer Interview Questions & Answers

user image arshad khan

posted on 1 Mar 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. They were 5 people's,i was give an interview through microsoft team's online. He told me the core technical questions. I tell them i have experience in industrial construction projects of arround 3 years, ...
  • Q2. Test of materials, slipform, industrial foundation, output of workers as per practical standard, Reiforcement. Methods, joints, safety conditions and many more

Interview Preparation Tips

Interview preparation tips for other job seekers - Try as much as possible search the company's through directly or as through genuine consultants both methods are good

Project Officer Interview Questions asked at other Companies

Q1. Power Tester working and uses.
View answer (4)

Tata Steel Utilities and Infrastructure Services Interview FAQs

How many rounds are there in Tata Steel Utilities and Infrastructure Services interview?
Tata Steel Utilities and Infrastructure Services interview process usually has 2-3 rounds. The most common rounds in the Tata Steel Utilities and Infrastructure Services interview process are Technical, Resume Shortlist and HR.
How to prepare for Tata Steel Utilities and Infrastructure Services interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tata Steel Utilities and Infrastructure Services. The most common topics and skills that interviewers at Tata Steel Utilities and Infrastructure Services expect are Management, Monitoring, MIS, Mechanical and Networking.
What are the top questions asked in Tata Steel Utilities and Infrastructure Services interview?

Some of the top questions asked at the Tata Steel Utilities and Infrastructure Services interview -

  1. At what height are the safety belts us...read more
  2. How many types of haza...read more
  3. How far is the soil thrown during excavati...read more
How long is the Tata Steel Utilities and Infrastructure Services interview process?

The duration of Tata Steel Utilities and Infrastructure Services interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Tata Steel Utilities and Infrastructure Services Interview Process

based on 28 interviews

Interview experience

4.1
  
Good
View more

Interview Questions from Similar Companies

GMR Group Interview Questions
4.1
 • 76 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Essar Group Interview Questions
3.8
 • 28 Interviews
View all

Tata Steel Utilities and Infrastructure Services Reviews and Ratings

based on 313 reviews

3.7/5

Rating in categories

3.4

Skill development

3.9

Work-life balance

3.2

Salary

4.0

Job security

3.6

Company culture

2.9

Promotions

3.3

Work satisfaction

Explore 313 Reviews and Ratings
Project Officer
66 salaries
unlock blur

₹2.5 L/yr - ₹7.1 L/yr

Assistant Manager
47 salaries
unlock blur

₹4.3 L/yr - ₹9.5 L/yr

Deputy Manager
35 salaries
unlock blur

₹6 L/yr - ₹12.4 L/yr

Manager
33 salaries
unlock blur

₹4.6 L/yr - ₹16 L/yr

Senior Officer
22 salaries
unlock blur

₹4.8 L/yr - ₹8 L/yr

Explore more salaries
Compare Tata Steel Utilities and Infrastructure Services with

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

Adani Enterprises

3.8
Compare

Essar Group

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview