Water treatment plant process involves several steps. In case of pressure pump running anticlockwise, the pump should be stopped and checked. In case of power failure, the generator should be started. Running amper is the measure of electrical current flowing through a circuit.
Water treatment plant process involves coagulation, sedimentation, filtration, and disinfection.
If pressure pump is running anticlockwise, it ma...
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 6 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jan 2022. There were 2 interview rounds.
posted on 27 Oct 2023
I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.
Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.
Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.
This process is time-dependent and can take years to complete.
Consolidation can cause settlement and deformation of structures built on top of the...
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.
COS includes costs such as raw materials, labor, and manufacturing overhead.
Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.
Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...
EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.
EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.
It is represented by the ASCII control character with the code 04.
EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...
A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.
A claim is typically submitted by a policyholder or healthcare provider to an insurance company.
It includes details such as the services provided, dates of service, and the amount billed.
The insurance company reviews the claim to determine if it meets the policy's coverage criteria.
Once approved, the ...
RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.
RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.
It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.
RFIs are often used as a preliminary step before issui...
Estimates are calculated predictions of the cost, time, and resources required for a project.
Gather all relevant information and data related to the project
Break down the project into smaller tasks or components
Use historical data or industry benchmarks to estimate the time and cost for each task
Consider any potential risks or uncertainties that may impact the estimates
Document the estimates and communicate them clearl
posted on 8 Apr 2024
I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.
posted on 20 May 2024
based on 1 interview
Interview experience
Project Officer
73
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Assistant Manager
49
salaries
| ₹4.3 L/yr - ₹9.5 L/yr |
Deputy Manager
40
salaries
| ₹6 L/yr - ₹12 L/yr |
Manager
26
salaries
| ₹4.6 L/yr - ₹16 L/yr |
Senior Officer
25
salaries
| ₹4.8 L/yr - ₹8 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon