Filter interviews by
Clear (1)
I applied via Job Portal and was interviewed in Mar 2023. There were 3 interview rounds.
Top trending discussions
I applied via Referral and was interviewed in Sep 2024. There were 2 interview rounds.
Implemented value engineering by redesigning a product to reduce costs without sacrificing quality.
Identified unnecessary features or components that could be removed without impacting functionality.
Suggested alternative materials or manufacturing processes to lower production costs.
Collaborated with cross-functional teams to brainstorm cost-saving ideas and implement changes.
Conducted cost-benefit analysis to ensure t...
Implemented lean manufacturing techniques to reduce material waste by 15% in previous project.
Identified inefficiencies in production process
Implemented just-in-time inventory system
Negotiated better pricing with suppliers
Utilized automation to streamline operations
I have over 10 years of experience in project management, leading cross-functional teams to successful outcomes.
Managed multiple projects simultaneously, ensuring deadlines were met and budgets were adhered to
Led a team of 15 individuals in a software development project, resulting in a 20% increase in efficiency
Implemented Agile methodologies to streamline project processes and improve team collaboration
posted on 17 Jun 2023
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 3 interview rounds.
posted on 8 Jul 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
Costing for transmission line involves calculating the total expenses for materials, labor, equipment, and overhead costs.
Calculate the total length of the transmission line needed
Estimate the cost of materials such as cables, poles, insulators, and connectors
Factor in labor costs for installation and maintenance
Include equipment costs for specialized tools and machinery
Consider overhead costs such as permits, land acq...
Execution of transmission line involves planning, design, construction, and maintenance of power lines.
Planning involves route selection, environmental impact assessment, and obtaining necessary permits.
Design includes determining the type of towers, conductor size, and insulator selection.
Construction involves clearing the right-of-way, setting foundations, erecting towers, and stringing conductors.
Maintenance include...
posted on 15 May 2024
I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.
My current Cost To Company is $120,000 per year.
My current Cost To Company includes my salary, benefits, bonuses, and any other compensation provided by the company.
It is important to consider the total value of all components of the compensation package when discussing Cost To Company.
For example, my salary is $100,000 per year, with an additional $20,000 in benefits and bonuses.
The Cost To Company may vary based on i
posted on 27 Dec 2024
I applied via LinkedIn and was interviewed before Dec 2023. There was 1 interview round.
Numerical reasoning and verbal reasoning followed by psychometric assessment.
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Jul 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Project Officer
65
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Officer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
Adani Enterprises
Essar Group