I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Process involved in STP
  • Ans. 

    STP stands for Sewage Treatment Plant, a process involving physical, chemical, and biological processes to treat wastewater.

    • Primary treatment: Removal of large solids through screening and settling.

    • Secondary treatment: Biological process where microorganisms break down organic matter.

    • Tertiary treatment: Further purification through filtration and disinfection.

    • Effluent discharge: Treated water is released back into the ...

  • Answered by AI
  • Q2. Difference between SBR and MBR
  • Ans. 

    SBR is a sequencing batch reactor while MBR is a membrane bioreactor.

    • SBR is a type of activated sludge process where all treatment stages occur in the same tank, while MBR uses a membrane to separate the treated water from the activated sludge.

    • SBR operates in batch mode, with alternating cycles of fill, react, settle, and decant, while MBR operates continuously.

    • SBR typically has lower capital costs but higher operating...

  • Answered by AI
  • Q3. Aeration Working Principle
  • Ans. 

    Aeration is the process of adding air to a liquid to increase oxygen levels, improve circulation, and remove impurities.

    • Aeration helps in promoting the growth of beneficial bacteria in wastewater treatment plants.

    • It is commonly used in fish tanks to provide oxygen to the aquatic animals.

    • Aeration can also be used in water treatment processes to remove volatile organic compounds.

  • Answered by AI

Skills evaluated in this interview

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge

Tata Steel Utilities and Infrastructure Services Interview FAQs

How many rounds are there in Tata Steel Utilities and Infrastructure Services Design Engineer interview?
Tata Steel Utilities and Infrastructure Services interview process usually has 1 rounds. The most common rounds in the Tata Steel Utilities and Infrastructure Services interview process are Technical.
What are the top questions asked in Tata Steel Utilities and Infrastructure Services Design Engineer interview?

Some of the top questions asked at the Tata Steel Utilities and Infrastructure Services Design Engineer interview -

  1. Difference between SBR and ...read more
  2. Process involved in ...read more
  3. Aeration Working Princi...read more

Tell us how to improve this page.

Tata Steel Utilities and Infrastructure Services Design Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Tata Steel Utilities and Infrastructure Services Design Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

2.0

Skill development

3.0

Work-life balance

3.0

Salary

4.0

Job security

2.0

Company culture

2.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Project Officer
73 salaries
unlock blur

₹2.5 L/yr - ₹7.5 L/yr

Assistant Manager
49 salaries
unlock blur

₹4.3 L/yr - ₹9.5 L/yr

Deputy Manager
40 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Manager
26 salaries
unlock blur

₹4.6 L/yr - ₹16 L/yr

Senior Officer
25 salaries
unlock blur

₹4.8 L/yr - ₹8 L/yr

Explore more salaries
Compare Tata Steel Utilities and Infrastructure Services with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview