  • Q1. Some technical questions related to foundation design
  • Q2. How will you tackle uplift in foundation

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basic technical questions and get knowledge of every function of civil engineering.

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About Highway Work related and Earthwork related
  • Q2. About Flexible pavement

Interview Preparation Tips

Interview preparation tips for other job seekers - HGIEL is very up growthing company for highway work
Good team work
Cooperative staff and HR team
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. RCC & Steel design related questions.
Round 3 - HR 

(1 Question)

  • Q1. CTC RELATED . Tall me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - It a good organisation .

I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Tell me about yourself.
Round 3 - Technical 

(1 Question)

  • Q1. What is consolidation of soil?
  • Ans. 

    Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.

    • Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.

    • This process is time-dependent and can take years to complete.

    • Consolidation can cause settlement and deformation of structures built on top of the...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Assistant Manager interview:
  • Soil Mechanics
Interview preparation tips for other job seekers - Prepare technically basic questions

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Why you left from your current company? What is your job profile? How to manage all things? To whom reported? How many employee in your current & previous company? What was the roll in previous company? Ho...
  • Q2. What is your current job location. What is the project cost? How much percentage hike my salary? What is the leave policy, HR Policies extra .

Interview Preparation Tips

Interview preparation tips for other job seekers - What is the achievements in previous companies.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is COS and stages involved init
  • Ans. 

    COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.

    • COS includes costs such as raw materials, labor, and manufacturing overhead.

    • Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.

    • Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...

  • Answered by AI
  • Q2. What do you mean by EOT
  • Ans. 

    EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.

    • EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.

    • It is represented by the ASCII control character with the code 04.

    • EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...

  • Answered by AI
  • Q3. What is a CLAIM
  • Ans. 

    A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.

    • A claim is typically submitted by a policyholder or healthcare provider to an insurance company.

    • It includes details such as the services provided, dates of service, and the amount billed.

    • The insurance company reviews the claim to determine if it meets the policy's coverage criteria.

    • Once approved, the ...

  • Answered by AI
  • Q4. What do you mean by RFI
  • Ans. 

    RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.

    • RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.

    • It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.

    • RFIs are often used as a preliminary step before issui...

  • Answered by AI
  • Q5. How todo Estimates
  • Ans. 

    Estimates are calculated predictions of the cost, time, and resources required for a project.

    • Gather all relevant information and data related to the project

    • Break down the project into smaller tasks or components

    • Use historical data or industry benchmarks to estimate the time and cost for each task

    • Consider any potential risks or uncertainties that may impact the estimates

    • Document the estimates and communicate them clearl

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Job description, location ,salary negotiation
Round 2 - Technical 

(1 Question)

  • Q1. Core working skill , working related point to point questions
Round 3 - HR 

(1 Question)

  • Q1. Final offer given by hr

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interview experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical questions from experience background

Tata Steel Utilities and Infrastructure Services Interview FAQs

How to prepare for Tata Steel Utilities and Infrastructure Services Assistant Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tata Steel Utilities and Infrastructure Services. The most common topics and skills that interviewers at Tata Steel Utilities and Infrastructure Services expect are Mechanical, Mining, Electricals, MS Office and Machinery.

Tell us how to improve this page.

Tata Steel Utilities and Infrastructure Services Assistant Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
16% less than the average Assistant Manager Salary in India
View more details

Tata Steel Utilities and Infrastructure Services Assistant Manager Reviews and Ratings

based on 14 reviews

3.5/5

Rating in categories

3.0

Skill development

3.7

Work-life balance

2.7

Salary

4.4

Job security

3.6

Company culture

2.8

Promotions

3.1

Work satisfaction

Explore 14 Reviews and Ratings
Project Officer
73 salaries
unlock blur

₹2.5 L/yr - ₹7.5 L/yr

Assistant Manager
49 salaries
unlock blur

₹4.3 L/yr - ₹9.5 L/yr

Deputy Manager
40 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Manager
26 salaries
unlock blur

₹4.6 L/yr - ₹16 L/yr

Senior Officer
25 salaries
unlock blur

₹4.8 L/yr - ₹8 L/yr

Explore more salaries
Compare Tata Steel Utilities and Infrastructure Services with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview