Upload Button Icon Add office photos

Filter interviews by

Tata Steel Utilities and Infrastructure Services Project Officer Interview Questions and Answers

Updated 25 Aug 2024

Tata Steel Utilities and Infrastructure Services Project Officer Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your sef?

Project Officer Interview Questions & Answers

user image arshad khan

posted on 1 Mar 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. They were 5 people's,i was give an interview through microsoft team's online. He told me the core technical questions. I tell them i have experience in industrial construction projects of arround 3 years, ...
  • Q2. Test of materials, slipform, industrial foundation, output of workers as per practical standard, Reiforcement. Methods, joints, safety conditions and many more

Interview Preparation Tips

Interview preparation tips for other job seekers - Try as much as possible search the company's through directly or as through genuine consultants both methods are good

Project Officer Interview Questions Asked at Other Companies

asked in Tata Steel
Q1. Power Tester working and uses.
asked in Tata Steel
Q2. Overhead conductors and their different specifications
asked in Tata Steel
Q3. PCC and RCC grades and their classification.
Q4. What are the numerical schemes to solve differential equation?
Q5. How many cube filling as Is code IS 456 and removing shuttering d ... read more
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions about safety and previous work experience. Spacing of binder? Mass plan of excavation?
Round 3 - Technical 

(1 Question)

  • Q1. PPE for excavation in electrical Hazards area.
  • Ans. 

    PPE for excavation in electrical hazards area includes non-conductive hard hats, gloves, boots, and safety glasses.

    • Non-conductive hard hats are necessary to prevent electrical shock.

    • Gloves should be made of rubber or other non-conductive materials.

    • Boots should have non-conductive soles.

    • Safety glasses with side shields should be worn to protect eyes from debris.

    • Workers should also wear flame-resistant clothing.

    • All PPE s...

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion and previous company facilities.

Interview Preparation Tips

Interview preparation tips for other job seekers - Know about construction safety and basic technical skills

Interview questions from similar companies

Interview Questionnaire 

3 Questions

  • Q1. The interviewer was very specific and asked related question. i was also prepared for the same and handled it very smartly. I did not face any difficulty while facing the interview with Director and that w...
  • Q2. Exactly dont remember but of course the common question- why we should hire you boss ?
  • Q3. Any question form our side ?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
-

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Telephonic Call 

(1 Question)

  • Q1. Roles and Responsibilities

Interview Questionnaire 

1 Question

  • Q1. About your pervious project details and work.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepair all Technical and work details.

I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How wil you synchronise the DGs??
  • Ans. 

    Synchronizing DGs involves coordinating their activities and ensuring they work together efficiently.

    • Create a detailed project plan outlining the tasks and timelines for each DG

    • Establish regular communication channels to share updates and resolve any conflicts

    • Implement a centralized system for tracking progress and identifying dependencies

    • Conduct regular meetings to discuss challenges, provide guidance, and align effor...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview should be conducted with fully technical questions.

I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Regarding profile i m having .
  • Q2. Deepdrive abouts previously experience and reasons for new job.

Interview Preparation Tips

Interview preparation tips for other job seekers - Better plat form to work in this organization. HR had good way of knowing the profile.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. HR round- Mr. X called me in the evening and asked me if I am interested for interview on ….. date . I went for interview on scheduled date and time.
Round 3 - Technical 

(1 Question)

  • Q1. Technical round- There was a panel of 3 members. Technical head+Quality Head+Coordinator They asked many technical questions.
Round 4 - HR 

(1 Question)

  • Q1. I gave interview on Saturday and got a call from HR on Monday morning He told me ur selected and discussed salary and few more things.

Interview Preparation Tips

Topics to prepare for AECOM Project Manager interview:
  • Be true to urself
Interview preparation tips for other job seekers - Basically it was 3 round interview.
HR and resume selection
Technical
HR salary and other discussions
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. General technical questions
Round 3 - HR 

(1 Question)

  • Q1. Behavioural test

Tata Steel Utilities and Infrastructure Services Interview FAQs

How many rounds are there in Tata Steel Utilities and Infrastructure Services Project Officer interview?
Tata Steel Utilities and Infrastructure Services interview process usually has 2-3 rounds. The most common rounds in the Tata Steel Utilities and Infrastructure Services interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Tata Steel Utilities and Infrastructure Services Project Officer interview?

Some of the top questions asked at the Tata Steel Utilities and Infrastructure Services Project Officer interview -

  1. PPE for excavation in electrical Hazards ar...read more
  2. They were 5 people's,i was give an interview through microsoft team's online. H...read more
  3. Test of materials, slipform, industrial foundation, output of workers as per pr...read more

Tell us how to improve this page.

Tata Steel Utilities and Infrastructure Services Project Officer Interview Process

based on 3 interviews

Interview experience

4.7
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 753 Interviews
AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all
14% more than the average Project Officer Salary in India
View more details

Tata Steel Utilities and Infrastructure Services Project Officer Reviews and Ratings

based on 26 reviews

3.4/5

Rating in categories

3.3

Skill development

3.6

Work-life balance

3.0

Salary

3.8

Job security

3.8

Company culture

2.5

Promotions

3.3

Work satisfaction

Explore 26 Reviews and Ratings
Project Officer
73 salaries
unlock blur

₹2.5 L/yr - ₹7.5 L/yr

Assistant Manager
49 salaries
unlock blur

₹4.3 L/yr - ₹9.5 L/yr

Deputy Manager
40 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Manager
26 salaries
unlock blur

₹4.6 L/yr - ₹16 L/yr

Senior Officer
25 salaries
unlock blur

₹4.8 L/yr - ₹8 L/yr

Explore more salaries
Compare Tata Steel Utilities and Infrastructure Services with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview