Upload Button Icon Add office photos

Filter interviews by

Tata Steel Utilities and Infrastructure Services Project Officer Interview Questions and Answers

Updated 25 Aug 2024

Tata Steel Utilities and Infrastructure Services Project Officer Interview Experiences

3 interviews found

Project Officer Interview Questions & Answers

user image arshad khan

posted on 1 Mar 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. They were 5 people's,i was give an interview through microsoft team's online. He told me the core technical questions. I tell them i have experience in industrial construction projects of arround 3 years, ...
  • Q2. Test of materials, slipform, industrial foundation, output of workers as per practical standard, Reiforcement. Methods, joints, safety conditions and many more

Interview Preparation Tips

Interview preparation tips for other job seekers - Try as much as possible search the company's through directly or as through genuine consultants both methods are good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your sef?

Project Officer Interview Questions Asked at Other Companies

asked in Tata Steel
Q1. Power Tester working and uses.
asked in Tata Steel
Q2. Overhead conductors and their different specifications
asked in Tata Steel
Q3. PCC and RCC grades and their classification.
Q4. What are the numerical schemes to solve differential equation?
Q5. How many cube filling as Is code IS 456 and removing shuttering d ... read more
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions about safety and previous work experience. Spacing of binder? Mass plan of excavation?
Round 3 - Technical 

(1 Question)

  • Q1. PPE for excavation in electrical Hazards area.
  • Ans. 

    PPE for excavation in electrical hazards area includes non-conductive hard hats, gloves, boots, and safety glasses.

    • Non-conductive hard hats are necessary to prevent electrical shock.

    • Gloves should be made of rubber or other non-conductive materials.

    • Boots should have non-conductive soles.

    • Safety glasses with side shields should be worn to protect eyes from debris.

    • Workers should also wear flame-resistant clothing.

    • All PPE s...

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion and previous company facilities.

Interview Preparation Tips

Interview preparation tips for other job seekers - Know about construction safety and basic technical skills

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Role and responsibility of Project Manager
  • Q2. Describe Launching of O.W. Girder

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for Railway project
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Why do you want yo join
  • Ans. 

    I want to join because I am passionate about project management and engineering challenges.

    • Passionate about project management and engineering

    • Excited about the challenges and opportunities in the role

    • Interested in contributing to the success of the team and company

  • Answered by AI
  • Q2. What are your strengths
Round 2 - Technical 

(2 Questions)

  • Q1. Engineering flow and sequence
  • Q2. Manhours realted to engineering activities
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Why do you want to leave your present employer, which is a TATA company?
  • Q2. Why should we recruit you? What value will you add if we select you?
  • Q3. Why you want to change?
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Be confident and old
  • Q2. What was your previous job role like
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Metro work experience mainly in planning department, project management, scheduling, cost management
  • Q2. Why need planning in a construction project
  • Q3. Some software related question like MSP and Excel
  • Q4. Amicable contract closer related question

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest, point to paint anwer and be confident.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of W. T. P
  • Ans. 

    The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.

    • 1. Coagulation: Adding chemicals to water to make particles clump together.

    • 2. Sedimentation: Allowing the clumped particles to settle at the bottom.

    • 3. Filtration: Passing water through filters to remove remaining particles.

    • 4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.

    • 5. Distribution: ...

  • Answered by AI
  • Q2. About safety precautions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion

Tata Steel Utilities and Infrastructure Services Interview FAQs

How many rounds are there in Tata Steel Utilities and Infrastructure Services Project Officer interview?
Tata Steel Utilities and Infrastructure Services interview process usually has 2-3 rounds. The most common rounds in the Tata Steel Utilities and Infrastructure Services interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Tata Steel Utilities and Infrastructure Services Project Officer interview?

Some of the top questions asked at the Tata Steel Utilities and Infrastructure Services Project Officer interview -

  1. PPE for excavation in electrical Hazards ar...read more
  2. They were 5 people's,i was give an interview through microsoft team's online. H...read more
  3. Test of materials, slipform, industrial foundation, output of workers as per pr...read more

Tell us how to improve this page.

Tata Steel Utilities and Infrastructure Services Project Officer Interview Process

based on 3 interviews

Interview experience

4.7
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 741 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
17% more than the average Project Officer Salary in India
View more details

Tata Steel Utilities and Infrastructure Services Project Officer Reviews and Ratings

based on 23 reviews

3.4/5

Rating in categories

3.5

Skill development

3.6

Work-life balance

2.8

Salary

3.8

Job security

3.6

Company culture

2.6

Promotions

3.3

Work satisfaction

Explore 23 Reviews and Ratings
Project Officer
65 salaries
unlock blur

₹2.5 L/yr - ₹7.5 L/yr

Assistant Manager
47 salaries
unlock blur

₹4.3 L/yr - ₹9.5 L/yr

Deputy Manager
41 salaries
unlock blur

₹6 L/yr - ₹12.1 L/yr

Manager
33 salaries
unlock blur

₹4.6 L/yr - ₹16 L/yr

Senior Officer
23 salaries
unlock blur

₹4.8 L/yr - ₹8 L/yr

Explore more salaries
Compare Tata Steel Utilities and Infrastructure Services with

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

Adani Enterprises

3.8
Compare

Essar Group

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview