Filter interviews by
I applied via Job Portal and was interviewed in Sep 2021. There was 1 interview round.
There are several types of hazards that can occur in various environments.
Physical hazards: Examples include slips, falls, and machinery accidents.
Chemical hazards: Examples include exposure to toxic substances or flammable materials.
Biological hazards: Examples include exposure to viruses, bacteria, or fungi.
Ergonomic hazards: Examples include poor workstation setup or repetitive motion injuries.
Psychological hazards:...
Safety belts are used at any height where there is a risk of falling.
Safety belts should be used whenever working at heights above 6 feet.
The specific height at which safety belts are used depends on the job and the risk of falling.
Examples of jobs where safety belts are used include construction work, window washing, and tree trimming.
Safety belts should be properly fitted and inspected regularly to ensure they are in...
The length of a safety belt varies depending on the type and purpose of the belt.
The length of a safety belt for a car typically ranges from 120 to 150 centimeters.
Safety belts for industrial use may have different lengths depending on the specific application.
Some safety belts are adjustable to accommodate different body sizes and shapes.
The length of a safety belt should be sufficient to secure the wearer and provide
The distance soil is thrown during excavation varies depending on factors such as the type of soil, equipment used, and excavation method.
The distance soil is thrown during excavation can range from a few feet to several yards.
Factors that affect the distance include the type of soil (e.g., sandy soil may be thrown farther than clay soil), the equipment used (e.g., excavators can throw soil farther than shovels), and t...
PPE stands for Personal Protective Equipment.
PPE is equipment worn to minimize exposure to hazards that can cause serious injuries or illnesses.
Common examples of PPE include helmets, gloves, safety glasses, respirators, and safety shoes.
PPE should be selected based on the specific hazards present in the workplace.
It is important to properly train employees on the correct use and maintenance of PPE.
Regular inspections ...
PTW stands for Permit to Work.
PTW is a formal written system used to control high-risk activities.
It ensures that all necessary precautions are taken before starting work.
PTW includes detailed information about the work to be done, hazards involved, and safety measures to be followed.
Examples of high-risk activities requiring PTW include working at heights, hot work, confined space entry, etc.
I appeared for an interview in Oct 2021.
Bill certification is the process of verifying and approving bills for accuracy and compliance.
Bill certification involves reviewing bills to ensure they are accurate and comply with relevant regulations and policies.
Key requirements for bill certification include verifying the billing details, checking for any errors or discrepancies, and ensuring compliance with billing guidelines.
The process typically involves compa...
Reconciliation process is a method of comparing and matching two sets of records to ensure accuracy and consistency.
Reconciliation involves comparing financial records, such as invoices and payments, to identify discrepancies.
It is a crucial step in the billing process to ensure that all transactions are accounted for and accurately recorded.
The process typically includes verifying the accuracy of data, investigating a...
Visible wastage of reinforcement refers to the physical loss or damage of reinforcement materials, while invisible wastage refers to the inefficient use or improper placement of reinforcement.
Visible wastage can occur due to mishandling, theft, or damage during transportation or storage.
Invisible wastage can occur when reinforcement is not properly placed or aligned, resulting in reduced structural strength.
Visible was...
Rate analysis of items involves determining the cost of each item in a project, while productivity analysis focuses on measuring the efficiency of activities.
Rate analysis of items involves breaking down the cost of materials, labor, and equipment for each item in a project.
Productivity analysis of activities involves measuring the output or progress of specific tasks or activities.
Rate analysis helps in estimating the...
I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 3 interview rounds.
I applied via Company Website
I will troubleshoot the sand filter and take necessary actions to fix it.
Check if there is any clogging in the filter
Inspect the valves and pipes connected to the filter
Clean or replace the filter media if required
If the issue persists, consult with the maintenance team
In the meantime, divert the flow to other filters to maintain the water quality
Tata Steel Utilities and Infrastructure Services interview questions for popular designations
I applied via Recruitment Consultant and was interviewed in Jun 2021. There were 3 interview rounds.
Get interview-ready with Top Tata Steel Utilities and Infrastructure Services Interview Questions
I applied via Approached by Company and was interviewed in Nov 2021. There was 1 interview round.
There are various types of air compressor houses and gas cleaning plants depending on their size, capacity, and application.
Types of air compressor houses: reciprocating, rotary screw, centrifugal, and axial flow
Types of gas cleaning plants: electrostatic precipitators, fabric filters, scrubbers, and cyclones
The selection of the type of compressor house and gas cleaning plant depends on the specific requirements of the...
I applied via Naukri.com and was interviewed before Oct 2021. There were 6 interview rounds.
Structure fabrication and erection
Safety welding and cutting hazard
Main Ek samuhik Charcha karta hun
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.
Top trending discussions
The duration of Tata Steel Utilities and Infrastructure Services interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 32 interviews
Interview experience
based on 343 reviews
Rating in categories
Project Officer
73
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Assistant Manager
49
salaries
| ₹4.3 L/yr - ₹9.5 L/yr |
Deputy Manager
40
salaries
| ₹6 L/yr - ₹12 L/yr |
Manager
26
salaries
| ₹4.6 L/yr - ₹16 L/yr |
Senior Officer
25
salaries
| ₹4.8 L/yr - ₹8 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon