Upload Button Icon Add office photos

Filter interviews by

Clear (1)

Tata Steel Utilities and Infrastructure Services Horticulture Officer Interview Questions and Answers

Updated 12 Jan 2022

Tata Steel Utilities and Infrastructure Services Horticulture Officer Interview Experiences

1 interview found

I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Work experience related questions
  • Q2. Personal information

Interview Preparation Tips

Interview preparation tips for other job seekers - Board are very appreciative

Interview questions from similar companies

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on your previous jobs

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..
Contribute & help others!
anonymous
You can choose to be anonymous

Recently Viewed

JOBS

Genpact

jodhpur

No Jobs

JOBS

Infosys

Lead

63 jobs

SALARIES

Infosys

Lead

unlock blur L/yr

(167 salaries)

REVIEWS

Infosys

Lead

4.3

(8 reviews)

SALARIES

Tata Steel Utilities and Infrastructure Services

INTERVIEWS

Tata Steel Downstream Products

No Interviews

INTERVIEWS

Tata Steel Downstream Products

No Interviews

INTERVIEWS

Tata Steel Utilities and Infrastructure Services

No Interviews

INTERVIEWS

Tata Steel Utilities and Infrastructure Services

No Interviews

INTERVIEWS

Tata Steel Utilities and Infrastructure Services

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 740 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
At par with the average Horticulture Officer Salary in India
View more details

Tata Steel Utilities and Infrastructure Services Horticulture Officer Reviews and Ratings

based on 3 reviews

1.3/5

Rating in categories

3.8

Skill development

3.1

Work-life balance

3.1

Salary

3.7

Job security

3.2

Company culture

2.4

Promotions

3.4

Work satisfaction

Explore 3 Reviews and Ratings
Project Officer
65 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
47 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
41 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Officer
25 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Tata Steel Utilities and Infrastructure Services with

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

Adani Enterprises

3.8
Compare

Essar Group

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview