Filter interviews by
I applied via Company Website and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 15 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 4 interview rounds.
The candidate should provide their current CTC document and expected CTC.
The candidate should have a current CTC document that shows their current salary.
The candidate should also provide their expected CTC, which is the salary they are looking for in the new position.
The expected CTC should be based on factors such as the candidate's experience, skills, and the market rate for the position.
The candidate can mention an...
posted on 17 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.
Shuttering and formwork are used interchangeably. Plaster ratio varies depending on the type of surface.
Shuttering and formwork are temporary structures used to support concrete until it sets.
Shuttering is typically used for vertical surfaces, while formwork is used for horizontal surfaces.
Plaster ratio varies depending on the type of surface. For example, the ratio for internal walls is 1:6, while for external walls i
The size of AAC brick varies depending on the manufacturer and type.
AAC bricks can range from 2.5 to 3 inches in height, 8 to 10 inches in length, and 4 to 6 inches in width.
The size of AAC brick can also be customized according to the specific needs of a project.
The size of AAC brick affects its weight, strength, and thermal insulation properties.
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
posted on 18 Oct 2024
I applied via Recruitment Consulltant
Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.
Establishing quality control procedures and protocols
Regular inspections and testing of materials and workmanship
Training and educating staff on quality standards
Implementing corrective actions when deviations are identified
Utilizing quality control tools such as checklists
BBS in code refers to Bar Bending Schedule as per Indian standards.
BBS stands for Bar Bending Schedule.
It is a detailed list of reinforcement bars to be used in a construction project.
It includes information on bar sizes, shapes, quantities, and placement.
BBS is prepared as per the requirements of Indian standards like IS 2502:1963.
It helps in ensuring proper reinforcement placement and quantity in the structure.
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
Branding schedule is a plan outlining the timeline and activities for promoting a brand.
Branding schedule includes tasks such as creating a brand strategy, designing a logo, developing marketing materials, and planning advertising campaigns.
It helps ensure consistency in brand messaging and image across different platforms and channels.
Example: A branding schedule for a new product launch may include market research, l...
Concrete grade and mixing ratio are crucial factors in determining the strength and durability of a structure.
Concrete grade refers to the strength of the concrete mix, typically denoted by a number like M20, M30, etc.
Mixing ratio is the proportion of cement, sand, and aggregate in the concrete mix, usually expressed as 1:x:y.
For example, a common mixing ratio for M20 grade concrete is 1:1.5:3, which means 1 part cemen
Regularly inspect and maintain all equipment and tools used on site to ensure they are in good working condition.
Create a maintenance schedule for all equipment and tools used on site.
Check for any signs of wear and tear on equipment and tools.
Clean and lubricate equipment regularly to prevent rust and corrosion.
Replace any damaged or worn out parts immediately.
Train site workers on proper handling and maintenance of e...
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.
Perform a slump test to determine the workability of the concrete mix.
Take samples from the mixed batch and cast test specimens for compressive strength testing.
Conduct compressive strength tests on the specimens to determine the grade of concrete.
Compare the test results with the standar
Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.
Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.
Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.
Site tests for cement include checking the color, sm...
Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.
Calculate the surface area of the wall by multiplying the height and length of each wall segment.
Determine the total surface area to be plastered by adding up the surface areas of all wall segments.
Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.
Consi...
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
They ask question on SFD AND BMD
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 3 interview rounds.
As per your cv details
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
based on 8 reviews
Rating in categories
Assistant Engineer
139
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Senior Engineer
123
salaries
| ₹4 L/yr - ₹10 L/yr |
Junior Engineer
79
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Senior Civil Engineer
46
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Store Executive
43
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Ahluwalia Contracts India
Nagarjuna Construction Company
Simplex Infrastructures
Larsen & Toubro Limited