Filter interviews by
I applied via Job Fair and was interviewed in May 2023. There were 3 interview rounds.
The place for me is empty what happen to you in the campany
Yes, I have 6 years of experience working in a metal steel plant in various stages of production.
Experience in assembling metal components in a steel plant setting
Knowledge of safety protocols and procedures in a manufacturing environment
Familiarity with machinery and tools used in metal fabrication
Ability to read and interpret technical drawings and blueprints
Experience in quality control and ensuring products meet sp
posted on 15 Mar 2022
I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.
Height of instrument is the vertical distance between the instrument and a reference point on the ground.
It is used in surveying to determine the elevation of points on the ground.
It is measured using a leveling instrument such as a level or a theodolite.
The height of instrument is calculated by subtracting the height of the reference point from the height of the instrument.
It is important to maintain a consistent heig...
The size of spacer bar depends on the size of the conductor and the voltage rating of the line.
The size of the spacer bar should be such that it maintains the required distance between the conductors.
The size of the spacer bar should be selected based on the voltage rating of the line.
The size of the spacer bar should be selected based on the size of the conductor.
The size of the spacer bar should be such that it can w...
posted on 27 Jan 2021
I applied via Recruitment Consultant and was interviewed in Jul 2020. There were 4 interview rounds.
I have experience in drawing various types of bridges including beam, truss, arch, suspension, and cable-stayed bridges.
Beam bridges - simple and economical design with horizontal beams supported by piers or abutments
Truss bridges - composed of interconnected triangles for added strength and stability
Arch bridges - curved design that distributes weight evenly to supports at each end
Suspension bridges - main cables anch...
posted on 4 Aug 2024
Road construction involves several steps including planning, designing, clearing the land, laying the foundation, paving, and adding finishing touches.
Planning: Determine the route, traffic flow, and necessary permits.
Designing: Create detailed plans including width, materials, and drainage systems.
Clearing the land: Remove trees, rocks, and other obstacles.
Laying the foundation: Level the ground, add layers of gravel ...
Sub grade to wearing course technical specifications include material type, thickness, compaction requirements, and drainage considerations.
Material type for sub grade can be natural soil, stabilized soil, or aggregate base.
Thickness of sub grade is typically specified based on soil conditions and traffic loads.
Compaction requirements ensure proper density and strength of the sub grade.
Wearing course materials can incl...
Background condition refers to the existing circumstances or situation that has led to the current state of affairs.
Background condition can include factors such as previous experiences, events, or decisions that have influenced the current situation.
It is important to consider the background condition when analyzing a problem or making decisions.
For example, in engineering, understanding the background condition of a ...
posted on 5 Dec 2020
I applied via Company Website and was interviewed in Jun 2020. There were 3 interview rounds.
posted on 9 Nov 2024
I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.
RCC road construction involves using reinforced concrete for durability and strength.
RCC stands for Reinforced Cement Concrete
Specifications include using high-quality cement, aggregates, and steel reinforcement
Proper compaction and curing are essential for durability
Thickness of the RCC road depends on traffic load and subgrade conditions
Joint spacing should be as per design specifications
Building construction activities include excavation, foundation work, framing, roofing, electrical work, plumbing, and finishing.
Excavation: Digging the foundation and preparing the site
Foundation work: Pouring concrete and setting the foundation
Framing: Building the structure's skeleton with wood or steel beams
Roofing: Installing the roof materials
Electrical work: Wiring the building for electricity
Plumbing: Installin...
posted on 20 Nov 2022
I applied via Company Website and was interviewed before Nov 2021. There were 3 interview rounds.
An written test conducted. Technical questions asked
Minimum cement required for M30 grade of concrete is 320 kg.
M30 grade of concrete requires a minimum cement content of 320 kg/m3
The cement content may vary based on factors such as water-cement ratio, aggregate type, and quality of cement used
posted on 21 Jul 2021
posted on 19 Jun 2024
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
Piling is a construction technique used to strengthen the foundation of a building by driving piles into the ground.
Piling involves driving long, slender columns (piles) into the ground to provide support for structures.
The process starts with site investigation to determine soil conditions and load-bearing capacity.
Piles can be made of concrete, steel, or timber, depending on the project requirements.
Piles are driven ...
BBS preparation involves calculating quantities of steel reinforcement required for construction projects.
Start by studying the structural drawings and specifications provided
Identify the different structural elements like beams, columns, slabs, etc.
Calculate the total length of each type of reinforcement required
Use standard formulas and codes to determine the quantity of steel bars needed
Prepare a detailed Bill of Qu...
based on 1 interview
Interview experience
Assistant Engineer
149
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
137
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Executive
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Ahluwalia Contracts India
Nagarjuna Construction Company
Simplex Infrastructures
Larsen & Toubro Limited