Filter interviews by
I applied via Job Fair and was interviewed in May 2023. There were 3 interview rounds.
The place for me is empty what happen to you in the campany
Yes, I have 6 years of experience working in a metal steel plant in various stages of production.
Experience in assembling metal components in a steel plant setting
Knowledge of safety protocols and procedures in a manufacturing environment
Familiarity with machinery and tools used in metal fabrication
Ability to read and interpret technical drawings and blueprints
Experience in quality control and ensuring products meet sp
Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.
Calculate the surface area of each individual formwork used for the concrete structure
Add up the surface areas of all formworks to get the total shuttering area
Consider any openings or gaps in the formwork when calculating the area
The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.
The formula for the area of a semi-circle is (1/2) * pi * r^2
The radius (r) is half the diameter of the circle
Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2
posted on 21 Aug 2023
I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.
Estimation of a small building.
The ratio of block work motor to plastering motor is typically 1:3.
The ratio of block work motor to plastering motor is usually 1:3.
This means for every 1 part of block work motor, 3 parts of plastering motor are used.
The ratio may vary depending on the specific project requirements.
The productivity of a laborer can be calculated by the amount of work completed in a day.
Productivity is measured by the amount of work completed in a specific time frame, in this case, per day.
Factors affecting productivity include skill level, motivation, tools/equipment available, and working conditions.
Example: A construction worker completing 10 tasks in a day is more productive than one completing only 5 tasks.
Binding wire is typically used at a rate of 8-10 kg per ton of reinforcement.
Typically, 8-10 kg of binding wire is used per ton of reinforcement to secure the bars in place.
The amount of binding wire needed may vary based on the complexity of the reinforcement design and the spacing between bars.
Using too little binding wire can result in inadequate reinforcement stability, while using too much can be wasteful and incr
Density of materials is a measure of how much mass is contained in a given volume.
Density is typically measured in units such as grams per cubic centimeter (g/cm^3) or kilograms per liter (kg/L).
Materials with higher density have more mass packed into a given volume.
Common examples of materials with high density include metals like lead and gold.
Materials with low density include gases like helium and liquids like oil.
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
I have executed multiple projects in the last few years.
Developed a new website for a client using HTML, CSS, and JavaScript.
Created a mobile application for a startup using React Native.
Managed a team of developers to build a custom CRM system for a large corporation.
Implemented a data analytics solution for a healthcare organization using Python and SQL.
Designed and executed a social media marketing campaign for a no
I appeared for an interview in Sep 2024.
Amazing aptitute test with knowledge of all aspects of the industry
Great assessment of all the interview natures of the assignment for risk, protocol, and valuation.
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
based on 1 interview
Interview experience
Senior Engineer
153
salaries
| ₹2.7 L/yr - ₹9.5 L/yr |
Assistant Engineer
148
salaries
| ₹3 L/yr - ₹6 L/yr |
Junior Engineer
81
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Assistant Engineer - Civil
50
salaries
| ₹2.6 L/yr - ₹5.6 L/yr |
Senior Civil Engineer
50
salaries
| ₹4 L/yr - ₹8.5 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem