Unit weight of circular bar can be calculated using a specific formula.
The formula to find the unit weight of a circular bar is: Unit weight = (π * D^2 * L * ρ) / 4
Where D is the diameter of the circular bar, L is the length of the bar, and ρ is the density of the material.
Make sure to use consistent units for diameter, length, and density in the formula.
For example, if the diameter of the circular bar is 10 mm, the le...
Top trending discussions
posted on 6 Sep 2024
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
Rate analysis involves calculating the cost of different items in a project.
Rate analysis involves breaking down the cost of each item in a project
It helps in determining the cost of materials, labor, and equipment for each item
Rate analysis is essential for accurate budgeting and cost estimation in construction projects
Escalation is the process of increasing the level of urgency or severity of a situation.
Escalation is commonly used in project management to address issues that require immediate attention.
It involves raising a concern to higher levels of authority when it cannot be resolved at the current level.
Escalation can also refer to increasing the intensity of a conflict or dispute.
Examples include escalating a customer complai...
Types of indices include price index, quantity index, and composite index.
Price index measures changes in prices over time.
Quantity index measures changes in quantities of goods or services.
Composite index combines price and quantity indices to provide a comprehensive measure.
Examples: Consumer Price Index (CPI), Producer Price Index (PPI), and Dow Jones Industrial Average.
Wastage can be controlled by proper planning, monitoring, training, and implementing efficient processes.
Implementing proper inventory management to avoid overstocking and expiration of materials
Regular monitoring of material usage and identifying areas of high wastage
Training staff on proper handling and storage of materials to prevent damage and spoilage
Implementing lean construction practices to minimize material wa...
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
IS 1200
I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.
The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.
Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process
Discussed the importance of reconciliation in ensuring accurate billing and payment
Described the process of rate analysis and how ...
Interview experience
based on 4 reviews
Rating in categories
Senior Engineer
128
salaries
| ₹4 L/yr - ₹10 L/yr |
Assistant Engineer
96
salaries
| ₹3.2 L/yr - ₹6 L/yr |
Junior Engineer
84
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Assistant Engineer - Civil
48
salaries
| ₹2.6 L/yr - ₹5.4 L/yr |
Senior Civil Engineer
47
salaries
| ₹4 L/yr - ₹9 L/yr |
Ahluwalia Contracts India
Nagarjuna Construction Company
Simplex Infrastructures
Larsen & Toubro Limited