Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Dineshchandra R. Agrawal Infracon Team. If you also belong to the team, you can get access from here

Dineshchandra R. Agrawal Infracon Verified Tick

Compare button icon Compare button icon Compare
4.2

based on 459 Reviews

Filter interviews by

Dineshchandra R. Agrawal Infracon Billing Engineer Interview Questions, Process, and Tips

Updated 6 Sep 2024

Dineshchandra R. Agrawal Infracon Billing Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Rate analysis of different item
  • Ans. 

    Rate analysis involves calculating the cost of different items in a project.

    • Rate analysis involves breaking down the cost of each item in a project

    • It helps in determining the cost of materials, labor, and equipment for each item

    • Rate analysis is essential for accurate budgeting and cost estimation in construction projects

  • Answered by AI
  • Q2. Cpwd codes & dsr
  • Q3. What is escalation
  • Ans. 

    Escalation is the process of increasing the level of urgency or severity of a situation.

    • Escalation is commonly used in project management to address issues that require immediate attention.

    • It involves raising a concern to higher levels of authority when it cannot be resolved at the current level.

    • Escalation can also refer to increasing the intensity of a conflict or dispute.

    • Examples include escalating a customer complai...

  • Answered by AI
  • Q4. Types of indices
  • Ans. 

    Types of indices include price index, quantity index, and composite index.

    • Price index measures changes in prices over time.

    • Quantity index measures changes in quantities of goods or services.

    • Composite index combines price and quantity indices to provide a comprehensive measure.

    • Examples: Consumer Price Index (CPI), Producer Price Index (PPI), and Dow Jones Industrial Average.

  • Answered by AI
  • Q5. How to control wastage
  • Ans. 

    Wastage can be controlled by proper planning, monitoring, training, and implementing efficient processes.

    • Implementing proper inventory management to avoid overstocking and expiration of materials

    • Regular monitoring of material usage and identifying areas of high wastage

    • Training staff on proper handling and storage of materials to prevent damage and spoilage

    • Implementing lean construction practices to minimize material wa...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Rate analysis & escalation very important for billing engineer

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is material reconciliation
  • Ans. 

    Material reconciliation is the process of comparing the actual materials used in a project with the estimated materials to ensure accuracy.

    • Involves comparing the actual quantity of materials used in a project with the estimated quantity

    • Helps in identifying any discrepancies or variances in material usage

    • Ensures that the project stays within budget and timelines

    • Can involve physical counting of materials on site or compa...

  • Answered by AI
  • Q2. What is rolling margin?
  • Ans. 

    Rolling margin is the difference between the selling price and the cost of goods sold, expressed as a percentage.

    • Rolling margin helps in determining the profitability of a product or service.

    • It is calculated by subtracting the cost of goods sold from the selling price, dividing the result by the selling price, and then multiplying by 100.

    • For example, if a product is sold for $100 and the cost of goods sold is $60, the ...

  • Answered by AI
  • Q3. How to calculate bend deduction of ring in BBS?
  • Ans. 

    Bend deduction of a ring in BBS is calculated by subtracting the sum of two bend allowances from the total length of the ring.

    • Calculate the bend allowance for each bend in the ring.

    • Add the bend allowances together to get the total bend allowance.

    • Subtract the total bend allowance from the total length of the ring to get the bend deduction.

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. What is bend deduction for ring hook
  • Ans. 

    Bend deduction for ring hook is the amount of material that is removed when bending a ring hook.

    • Bend deduction is calculated based on the material thickness and bend radius.

    • It is used to determine the flat pattern length of the material before bending.

    • For ring hooks, the bend deduction is typically around 1.5 times the material thickness.

    • The formula for calculating bend deduction is: Bend Deduction = (π/2) x Bend Radiu

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General Questions on yourself and previous organisation
Round 3 - Technical 

(2 Questions)

  • Q1. Question will be asked by you on your applied job profile, for eg if you are applying for billing engineer question will be on billing like what types of billing till you have done like milestone billing, ...
  • Q2. What is JMR. What is LD In terms of Billing. Software knowledge like excel MS word &. Power point
Round 4 - Document review 

(1 Question)

  • Q1. What is LD in billing, What is JMR, Mandatory document required for bill to be raised etc
  • Ans. 

    LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.

    • LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.

    • JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions related to core subject and experience
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical Questions related to core subjects and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Job insecurity in PMC B+P department .
If you are looking for long term job > i would suggest go for other PMC

I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Rates of sub-contractors . Billing process. Reconciliation means and how it is done. Rate Analysis. Key points of your last project. Type of structure that you had seen in your last company. And their deta...
  • Ans. 

    The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.

    • Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process

    • Discussed the importance of reconciliation in ensuring accurate billing and payment

    • Described the process of rate analysis and how ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and never ever show that u r nervous even if u don't know the answer.
Round 1 - Coding Test 

IS 1200

Interview Preparation Tips

Interview preparation tips for other job seekers - I am explaied below the items
1)Plastering deductions as per IS code
2)Shuttering deduction
3)Reconciliation like steel,cement,bulk materials
4)Zero cost
5)taken BBS they given drawing.
6)Slab recycling dates
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the IS Code of Concrete
  • Ans. 

    IS Code of Concrete is IS 456:2000

    • IS 456:2000 is the Indian Standard code for Plain and Reinforced Concrete

    • It provides guidelines for the design and construction of concrete structures

    • The code covers various aspects such as materials, mix design, workmanship, and testing

    • It ensures the quality and durability of concrete structures

    • For example, IS 456:2000 specifies the minimum grade of concrete for different types of str

  • Answered by AI
  • Q2. Concrete IS code is IS 456
  • Ans. 

    IS 456 is the Indian Standard code for the design and construction of reinforced concrete structures.

    • IS 456 provides guidelines for the use of reinforced concrete in construction.

    • It covers the general requirements for the design and construction of reinforced concrete structures.

    • The code includes provisions for materials, structural design, durability, and safety.

    • It also provides guidelines for testing and quality cont...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Billing engineer interview is maximum technical questions.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General Questions on yourself and previous organisation
Round 3 - Technical 

(2 Questions)

  • Q1. Question will be asked by you on your applied job profile, for eg if you are applying for billing engineer question will be on billing like what types of billing till you have done like milestone billing, ...
  • Q2. What is JMR. What is LD In terms of Billing. Software knowledge like excel MS word &. Power point
Round 4 - Document review 

(1 Question)

  • Q1. What is LD in billing, What is JMR, Mandatory document required for bill to be raised etc
  • Ans. 

    LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.

    • LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.

    • JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions related to core subject and experience
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical Questions related to core subjects and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Job insecurity in PMC B+P department .
If you are looking for long term job > i would suggest go for other PMC

I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Rates of sub-contractors . Billing process. Reconciliation means and how it is done. Rate Analysis. Key points of your last project. Type of structure that you had seen in your last company. And their deta...
  • Ans. 

    The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.

    • Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process

    • Discussed the importance of reconciliation in ensuring accurate billing and payment

    • Described the process of rate analysis and how ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and never ever show that u r nervous even if u don't know the answer.

Dineshchandra R. Agrawal Infracon Interview FAQs

How many rounds are there in Dineshchandra R. Agrawal Infracon Billing Engineer interview?
Dineshchandra R. Agrawal Infracon interview process usually has 1 rounds. The most common rounds in the Dineshchandra R. Agrawal Infracon interview process are Technical.
What are the top questions asked in Dineshchandra R. Agrawal Infracon Billing Engineer interview?

Some of the top questions asked at the Dineshchandra R. Agrawal Infracon Billing Engineer interview -

  1. How to control wast...read more
  2. Rate analysis of different i...read more
  3. What is escalat...read more

Tell us how to improve this page.

Dineshchandra R. Agrawal Infracon Billing Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Dineshchandra R. Agrawal Infracon Billing Engineer Salary
based on 7 salaries
₹3.6 L/yr - ₹6 L/yr
At par with the average Billing Engineer Salary in India
View more details

Dineshchandra R. Agrawal Infracon Billing Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

3.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
54 salaries
unlock blur

₹6 L/yr - ₹13.1 L/yr

Structural Engineer
53 salaries
unlock blur

₹2.2 L/yr - ₹5.5 L/yr

Senior Engineer
50 salaries
unlock blur

₹4 L/yr - ₹11.4 L/yr

Highway Engineer
42 salaries
unlock blur

₹2.8 L/yr - ₹5.4 L/yr

Civil Site Engineer
41 salaries
unlock blur

₹1.8 L/yr - ₹5.7 L/yr

Explore more salaries
Compare Dineshchandra R. Agrawal Infracon with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.1
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview